Hamdi BEN SLIMANE Born on February 28th , 1987 Nationality :Tunisian Marital status: Single Control & Instrumentation Doha, Qatar 0097466869485/0021622320928 chartered Engineer Ben.slimane.hamdi@gmail.com Professional experience : Since Jun 2012 Control and Instrumentation site engineer ARCHIRODON CONSTRUCTION (OVERSEAS) CO. S. A. (Qatar Branch) New Halul Desalination Plant Project (Project for Qatar Petroleum) -OffshoreConstruction & Commissioning of control and instrumentation. DCS Commissioning & SAT. ABB PMS Commissioning. Instrumentation maintenance planning. Instrumentation maintenance. Calibration. Instrumentation installation. Honeywell DCS Engineering and management of change. F&G system commissioning & SAT. - PLCs commissioning & SAT. Role & Responsibilities - - - - - Responsible for DCS commissioning, and startup of Desalination plant (capacity of 2400m3/Day) and handover to the client (Qatar Petroleum). Responsible for planning & mobilization of vendors. And installation, commissioning of different vendor packages – DCS (Honeywell C-300), Fire and Gas System (Honeywell), Air compressors (Atlas copco), Blowers (Atlas copco), Electro-Chlorination Skid, HP pumps and LP pumps (Flowserve) and Analyzers (Teledyne Analytical Instruments). Preparation of documents required for engineering & commissioning. Modification of documents, drawings if required on as red line mark up and approval for the same. Punch point clearing and management. Worked on different instruments like PTs (Rosemount, Honeywell, Ceraphant), LTs (Honeywell, Endress+hauser, Rosemount), FTs (Honeywell, Endress+hauser, Bopp&Reuther), MOVs (Rotork, Emerson), Control Valves (Severn Glocon, Siemens) and On/off valves (Rotork). Responsible for Installation, Testing and Commissioning of Fire Alarm Control System (Honeywell), Fire and Gas control Panel (Honeywell) and HSSD system (VESDA). Lead the group of Instrument engineers/technicians to ensure that precommissioning and commissioning work will be properly executed i.e. Calibration of Instruments, Loop checking of Instruments, Testing of Fire and Gas Detection System, Testing of CCTV, ACS, PAGA and MCC Panel systems Loop check, functional check, Cause and Effect Check, Logic test of Fire & Gas System and Process Instruments of different systems & subsystems. Provide technical, hands-on support for the DCS/F&G/Device Testing execution during commissioning and start-up over-site. Interface with other departments within the project as required act on safety risk points related to Instrumentation. - - Hand on experience in all project activities. Reports to Commissioning Engineer regarding the Pre-commissioning and Commissioning activities. Review all the drawings like P&ID, Instrument Loop drawing, GA/IA drawings, and Bloc diagram…. Instrumentation maintenance and calibration. Preventive instrumentation maintenance planning. Industrial training : 4 months Feb. 2012 to Jun. 2012 Graduation Project Petrofac Energy development Tunisia. Chargui CPF,Tunisia Integration of two PLCs ‘Allen Bradley RSLogix5000’ to the existent system ‘Emerson DeltaV DCS’ in order to migrate the control of a refrigeration unit from the DCS to a local PLC to enhance the control performance to improve the DeltaV DCS performance as it was overloaded.. (Propylene refrigerant unit made by AXIMA ref part SUEZ GDF group). 1 month August 2011 Thyna Petroleum Services, is a JV between OMV & ETAPE E&P. Development department, Sfax, Tunisia Programming and simulation of automation and supervision for control of three phase separator with HMI software Complicity GE Fanuc and Machine Edition. 1 month May 2010 Year-end project Programming an intelligent surveillance card for house alarm system based on a microcontroller. April 2010 Training Training on ISO 14001:2004 - Environmental management systems. March 2010 Industrial training : Weatherford - Maintenance planning. - Instrumentation maintenance. - Calibration. - Joint Analysis Make Up. January 2010 Industrial training : Weatherford - Maintenance planning. - Instrumentation maintenance. - Calibration. - Joint Analysis Make Up. December 2009 Industrial training : Weatherford - Maintenance planning. - Instrumentation maintenance. - Calibration. - Joint Analysis Make Up. October and November 2009 Industrial training : Weatherford - Maintenance planning. - Instrumentation maintenance. - Calibration. - Joint Analysis Make Up. Qualifications : 2012 Electrical Engineering degree Major Automatic and industrial computer (BAC+5) (ENIS) Chartered Engineer 2009-2012 National Engineering School of Sfax Electrical Engineering Major Automatic and industrial computer 2009 Tunisian Contest for admission to engineering training Cycles 2006-2009 Preparatory Institute of Engineering Studies of Sfax IPEIS Preparatory course Section : Technology Preparation 2006 Section : Mathematics BACCALAUREAT DIPLOMA Mention : Well Skills : Computing PC PLC CAO DCS Languages : C++, C, VB, Matlab, Pascal, Maple, Office : Omron(SYSWIN 34), Siemens (STEP 7-Micro/WIN 32), GE Fanuc (Machine Edition/ HMI software Complicity), Allen Bradley (RSLogix5000/RSLogix500) : Proteus ISIS, Eagle : Sound knowledge in Honeywell C300, Experion PKS R311. : Based knowledge in Emerson DeltaV, DeltaV Explorer Arabic : Spoken and written French : Spoken and written English : Spoken and written Aptitudes : Good communication skills. Good adaptation to any work environment. Flexibility for relocation. Multi-culture team work capability. Fast learning capability. Good autonomy and self-initiation. Ability to work on "offshore Offshore training : May 2013 HUET and Sea Survival Expiry Date: 19 May 2016 May 2013 H2S & BA escape Expiry date: 19 May 2015 Hobbies : Traveling, New technology, Football..