Minutes of management meeting Time: 13 February Location: UTCB Boulvard Lacul Tei, 122-124, Bucharest, 020396 Participants: delegated technical and financial project management staff of each project partners, see list of participants attached Topics for discussion were as follows: 1. Discussion of general management issues (see attached ppt presentation of the coordinator) - Information about the Interim report submitted in January Lessons learned from preparation of the report (keeping deadlines, responsibility and task of the coordinator and partners, difficulties over communication) Management needs to improve efficiency in order to complete the final report on time Arrangements made: Communication within partners should be improved. Skype meetings are necessary to ensure continuous monitoring of the project and discussion of problems. Coordinator has to warn partners to keep deadlines as agreed in the workplan and on the meetings. Written communication is important. Respond to all e-mails within 48 hours is required. Minutes of each verbal meeting should be prepared. Responsible: organizer of the meeting. 2. Discussion of upcoming work based on the detailed task list with special focus on activities which have significant delays - Based on the interim report, which was submitted in January, structure of the reporting sheet was discussed in detailed. Work achieved by partners should focus on getting project results, which were defined in the proposal. Detailed task list was distributed (workplan_TD list, see attached excel file). This table contains: all of the results which should be prepared and have to report in the final report, information about the actual status of the task related to a certain result (completed, partly completed, overdue), who is responsible for the result, what is the expected form of documentation (type, language, minimum extent required), starting and finishing date, if having delay, what is the expected time to finish it , What kind of action is required to fulfil task. Arrangements agreed on the meeting were as follows: Task/Result name Action agreed R3-evaluation form (QA) and risk assessment plan (RAP) Evaluation form should be filled out by participants of all courses organized in the frame of the project. Form is available (Reporting CD/II Results/11_Evaluation form (WP1R3). Good photos are wanted to illustrate problems and solutions (website gallery) Additional 3 events is required for dissemination (to organize dissemination type event or to participate on a national/international conferences) R5- photo gallery on project website R6- written and oral presentations R9- study (gap analyses) R10- intensive trainings to transfer innovation Report should be improved based on the extension of survey (updated questionnaire) 3 trainings have already been organized which took place in Prague (2-2014,4-2014) and Tata (52015 including excursion), 1 additional training event is required in the near future. This event would be combined with R12 (wrap-up workshops) and topic urban flooding. There is a possibility to organise a workshop in Denmark organised by Danish DHI (subject: climate change modelling issues, in April)/ optional participation Deadline. responsible partner/person Checking and update form (if required) - Zsuzsanna Nagy, 20.02.2015 Apa Nova (E. Chiru) will send min. 5 photos to web till 31.03.2015 Planned activities: Presentation on the EWA Spring Conference, Budapest – E.Zeman, K. Buzas Presentation on the MAVIZ Assembly or MHT - Zs Nagy, K. Buzas, Presentation on ExpoApa – M. Cheveresan (UTCB and Apa Nova) Completion of final report Maria Cheveresan, 31.03.2015 Proposal for combined events (training and wrap-up ws’s): one course in Budapest, proposed date: end of March, one course in Bucharest, proposed date: beginning of May. Responsible partner: Zs. Nagy, DHI a.s. Workshop in Denmark – Zs. Nagy Task/Result name Action agreed R11-summary document on testing results There are significant delays in both pilots, but the so far done work and lessons learnt has been documented well. Could serve their aim as basic input to local trainings and training materials. It is decided to try to focus on more effectively on the clear result message to support and underline more the object of the project. Working plan was revised on the technical meetings. Final deadline for completion of the work is end of April to be able to ensure to have it fully being ready to be shown in training roadshow. Results should be transformed to teaching material, too. see R10 R12 - 2 wrap up workshops R13-1 joint event at Hu-RO border with min. of 40 participants R14 (1) – national seminars Two alternatives are as follows: (1) organising two events separately, one should be in Budapest and other in Bucharest, project partners have to be invited for both events. (2) organisation of a joint event somewhere, which is closed to the country border of Ro/Hu. Proposed location: Szeged, Romanian project partners and external colleagues should be invited. Seminars have to address different target groups (municipalities-majors, public utilities). In total (min. 3 events) 60 – 60 participants (HU, RO) is required). Universities (BME, UTCB) are responsible for the organisation of seminars. Lead partner expressed to Romanian Deadline. responsible partner/person David Hrabak distributes tables (what they agreed: tasks, responsibilities and deadlines) – 19.02.2014 Monitoring of Hungarian pilot - D. Hrabak (DHI), A. Clement (BME) Monitoring of Romanian Pilot – D. Hrabak, Zs. Nagy (DHI) Pilot task coordination responsibility at universities see R10 UTCB and ApaNova make a decision whether they would be able to contact University of Timisoara in order to invite them to the meeting – M. Cheveresan, 23.02.2014 UTCB will react on their decision / if they can contribute and if yes, how and where to this action/ on contribution during next skype meeting target group definition: – M. Cheveresan (UTCB) Seminars in Romania – M. Cheveresan (UTCB) Seminars in Hungary – A. Clement (BME) Deadline to inform Lead Task/Result name Action agreed partners that their target groups are to be defined and training has to be developed accordingly; for each training there is a need to have a training material (document) and ppt for each target group training R14 (2) - edited project result summary document R15-1 on-site discussion in the Czech Republic R17- label from Romanian vocational body Deadline. responsible partner/person partner on training plan / training execution (?): 30.06.2015 Edited teaching materials. Min. requirements for written materials (in national language): 50 pages text and series of ppt presentations. Universities (BME, UTCB) are responsible for development the report/teaching material. 9th International Water Management Exhibition WATER SUPPLIES – SEWERAGE will be held on May 19 – 21, 2013 in Prague. This task will be organized in the frame of this event (VODKA event). Partners could invite 3rd parties to this event. Edited Hungarian report – K. Buzas (BME) Edited Romanian report – M. Cheveresan Deadline: 30.06.2015 Since there is no body for qualification in Romania, solution must be found how to manage this task. M. Cheveresan, 31.03.2015 Distribution of the 2nd circular of the event – Zs. Nagy, 23.02.2015. Sending of list of participants – all partners, 03.03.2015 UTCB has to find who is/can be the relevant body /-what to report in the final report. It can be also OK that university or association of the water utilities issues the letter of recommendation 3. Discussion of financial management issues - General conclusions for interim report and instructions for final reporting (see attached ppt presentation) Planning budget for the 2nd year and some administrative issues: requirements for budget modification have to send to the coordinator (deadline: 28.02.2015). Excel format will be sent by email. sending of missing documents concerning the first reporting period – ASAP and as requested. discussing the budget and the first year spending with each project partner. Balance table will be sent to each project partner. creating a dropbox surface for uploading of financial documents Budapest, 17.02.2014 Annexes: - Workplan – TD list general project management (PPT presentation) financial management (ppt presentation) list of participants