Materials Certification Project Compliance Summary Check-List SP or SAP # Resident Engineer: District # Number of Boxes submitted: Construction Office Location: Below is a Check List with the required documents for the yearly compliance summary. Please complete this list and submit your materials to Carol Starbuck, Maplewood Materials Lab – MS645 Technical Requirements and Questions should be directed to Curt Turgeon, Pavement Engineer @ 651-366-5535 General Documents Plans Proposal Final Estimate Materials Certification Exceptions Summary (2171) Change Orders – All (21840) Supplemental Agreements Work Orders Materials Certification Project Compliance Summary Check-List SP or SAP # Resident Engineer: District # Number of Boxes submitted: Construction Office Location: Concrete Related Documents Paving Documents Paving Contact Report (2164) Request For Concrete Mix Approval JMF Submittal Worksheet Cement Record (2157) Agency Concrete Aggregate Worksheet-JMF Contractor Concrete Aggregate Worksheet-JMF Sand Patch Test Results Concrete Batching Report (2152) Weekly Concrete Report (2448) Concrete Test Beam Data (2162) Field Core Report (24327) Test Reports on Concrete Pavement Cores (24324) Materials Certification Project Compliance Summary Check-List SP or SAP # Resident Engineer: District # Number of Boxes submitted: Construction Office Location: Paving Documents When Required Contractor Control Charts: Aggregate Moisture Content W/C Ratio Quality Control Total Water in Mix Composite Gradation (Well-Graded Aggregate) Air Content Flexural Strength Concrete W/C Ratio Calculation (Microwave Oven) Worksheet Concrete Ride Profile Summary Well-graded Aggregate Summary Sheet W/C Ratio Incentive / Disincentive Summary Sheet Concrete Aggregate Quality Incentive / Disincentive Lab Reports for Paving Aggregate Quality Report (LIMS) Concrete Cylinder Test Reports (LIMS) Test Report on Cement Sample (LIMS) Test Report on Fly Ash Sample (LIMS) Test Report on Slag Sample (LIMS) Test Report on Admixtures (LIMS) Test Report on Curing Compound (LIMS) Test Report on Dowel Bars or Certification (LIMS) Test Report on Joint Materials (LIMS) Materials Certification Project Compliance Summary Check-List SP or SAP # Resident Engineer: District # Number of Boxes submitted: Construction Office Location: Concrete Ready-Mix Document Contact Report (2163) Concrete Mix Design (2416 / 2406) Weekly Concrete Reports (2448) Weekly Concrete Ready-Mix Plant Reports (24143) Weekly Concrete Aggregate Reports (2449) Diaries Certificates of Compliance (#0042 / Contractor) Lab Reports for Ready-Mix Aggregate Quality Reports (LIMS) Concrete Cylinder Test Reports (LIMS) Test Report on Fly Ash Sample (LIMS) Test Report on Cement Sample (LIMS) Test Report on Admixtures (LIMS) Materials Certification Project Compliance Summary Check-List SP or SAP # Resident Engineer: District # Number of Boxes submitted: Construction Office Location: Concrete Low-Slump Overlay Documents Lab Reports of Aggregate Gradation (LIMS) Weekly Report of Low-Slump Concrete (21412) Concrete Cylinder Test Reports (LIMS) Materials Certification Project Compliance Summary Check-List SP or SAP # Resident Engineer: District # Number of Boxes submitted: Construction Office Location: Bituminous Documents Test Summary Sheet Core Density Worksheets Core Density Incentive / Disincentive – Summary Spreadsheets Ride Quality Profile Tapes Ride Quality Incentive / Disincentive – Summary Spreadsheets Plant Certification MDRs (Mix Design Reports) Asphalt Cement Bills of Lading Materials Certification Project Compliance Summary Check-List SP or SAP # Resident Engineer: District # Number of Boxes submitted: Construction Office Location: Grading and Base Documents All Grading & Base Reports Grading & Base Test Results Grading & Base Summary Forms: Lab Companion Test Results Independent Assurance Tests & Reports Secondary Acceptance Documentation: Form# 2415 Form# 2403 Letters To File Certification Forms – Aggregates All Recommendations from Specialty Office