CHENGYU LI, P - University of Colorado Denver

advertisement
CHENGYU LI, P.E., S.E., Ph.D.
Assistant Professor
Structural Engineering
Department of Civil Engineering
University of Colorado at Denver
Campus Box 113
P.O. Box 173364
Office Phone: 303-796-4636
Email: chengyu_li@urscorp.com
EDUCATION
Ph.D. in Structural Engineering, 1995, Arizona State University, Tempe, AZ 85287, USA
M.S. in Structural Engineering, 1986, Northeast Forestry University, Harbin, China
B.S. in Civil Engineering, 1983, Northeast Forestry University, Harbin, China
ACADEMIC EXPERIENCE
2009-Present Assistant Professor CCT, University of Colorado at Denver, CO 80217
Courses Taught:
Structural Dynamics
Structural Steel Design
2001-2009
Adjunct Professor, University of Colorado at Denver, CO 80217
Courses Taught:
Structural Steel Design
Structural Earthquake Engineering,
Structural Dynamics
Advanced Topics in Reinforced Concrete
Advanced Topics in Steel Design
Prestressed Concrete (at CU Boulder)
Committee member and advisor for master and Ph.D. programs.
1992-1995
Teaching and Research Assistant, Arizona State University, Tempe, AZ,
USA
Performed research on fiber reinforced concrete sponsored by the national
science foundation
Teaching assistant for classes of experimental stress analysis, reinforced
concrete design, and mechanics of materials
1986-1991
Associate Professor, Department of Civil Engineering, Northeast Forestry
University, Harbin, China
Taught undergraduate and graduate classes of structural analysis, concrete
design, bridge engineering, and engineering economy
Performed research on bridge vibration, bridge condition evaluation, and
bridge rehabilitation
1983-1986
Research and Teaching Assistant, Northeast Forestry University, Harbin,
China
Performed research on bridge vibration and impact simulations
INDUSTRIAL EXPERIENCE
1998-Present Principal Bridge Engineer and Project Manager, URS Corporation, 8181
East Tufts Avenue, Denver, CO 80237, USA
Principal Bridge Engineer and Project Manager for transportation projects.
Responsibilities include bridge concept development, design technical
review and supervision, and project management. Projects included large
design-build projects, complex steel bridge rehabilitations, and concrete
and steel bridge design.
1995-1998
Project Structural Engineer, Vaughn and Melton Consulting Engineers,
Asheville, NC, USA
Project structural engineer for bridge and building design projects. Work
included analysis and design of reinforced concrete, prestressed concrete,
and steel bridges, design of reinforced concrete arch and box culverts,
design of residential and industrial buildings, and design of retaining
structures and foundations.
1983-1991.1 Project Structural Engineer, Design Institute of Northeast Forestry
University, Harbin, China
Project structural engineer for design of post-tensioned concrete box
girder bridges, concrete arch bridges, and concrete and steel bridges.
MEMBERSHIP IN SCIENTIFIC AND PROFESSIONAL SOCIETIES
Member, American Concrete Institute
Associate Committee Member, ACI Fiber Reinforced Concrete Committee 544
Member, American Society of Civil Engineers
Member, American Institute of Steel Construction
PROFESSIONAL REGISTRATION
Professional Engineer: Colorado, Utah, New Mexico, North Carolina, Washington
Structural Engineer: Arizona, Washington, Utah
REVIEWER
ACI Materials Journal
AREAS OF TEACHING AND RESEARCH INTERESTS
Teaching: mechanics of materials, structural analysis, experimental stress analysis,
reinforced concrete design, prestressed concrete design, steel design, structural dynamics,
structural seismic design, bridge engineering
Research: Bridge vibration and seismic design, experimental structural evaluation,
structural monitoring and non-destructive testing, structural system modeling and retrofit
techniques, concrete composite materials
SPONSORED RESEARCH
Fiber Reinforced Concrete (1992-1995), Sponsored by the National Science Foundation
Bridge Expansion Joint Evaluations and Rehabilitation (1987-1989), Sponsored by the
Harbin Department of Transportation
Bridge Dynamic and Live Load Impact Evaluations (1986-1988), Sponsored by the
China Forestry Ministry
PROJECT EXPERIENCE
RTD FASTRACKS, North Metro Corridor, Denver, CO: Lead Structure Engineer
responsible for the preliminary design of all structures on the RTD Fastracks North Metro
Corridor project. The North Metro corridor provides 18 miles of commuter rail transit
with 8 Park-n-Ride stations between Denver Union Station and 162nd Avenue. Major
structures include 15 bridges, including one 6500 ft long bridge, 3 pedestrian underpasses
and 35 major retaining walls.
TXDOT, SPUR-601 Design/Build, TX: Lead Project Bridge Engineer for the design of
WN connector and the main viaduct on the project. The WN connector has 19 spans of
prestressed concrete Type IV girders. The substructures include hammerhead and multicolumn bents supported on drilled shafts. The main viaduct has 53 spans of prestressed
concrete Type IV girders with a total length of 6500 ft.. The substructures include multicolumn bents, post-tensioned hammerhead and straddle bents. All bents are supported on
drilled shafts.
MODOT, I-64 Design/Build, MO: Project Bridge Engineer for the seismic analysis and
design of five bridges on the project. Three-dimensional models with soil-structure
interaction were used to determine the seismic forces and displacements. Response
spectrum analysis was carried out with SAP2000 program. The columns, connections, and
foundations were designed for the seismic forces and displacements.
CALTRANS, SR-22 Design/Build, CA: Project Structural Engineer responsible for
design of various types of retaining walls, moment slab barriers and major drainage
structures. Retaining walls include cantilever walls with footing and pile foundations,
MSE walls and tieback walls. Drainage structures include two complex headwalls, a 3sided open channel confluence structure and various other non-standard drainage
structures.
MNDOT, Roc 52 Design/Build, MN: Lead Bridge Engineer for the design of three
bridges on the project. Precast/prestressed concrete girders were used for the
superstructures. The abutments were tall walls supported on steel H-piles with pilasters
and the piers consisted of concrete caps and columns supported on steel H-piles. Form
liner was used on all exposed surfaces.
St. Louis Bay Bridge, MS, Mississippi Department of Transportation. Provided
design oversight, review of plans, and checked design calculations.
E-470 Public Highway Authority, Denver, CO: Project Engineer for the widening
design of two bridges. The precast/prestressed concrete girders were used for
superstructure and the substructures included integral abutments on H-pile and concrete
columns founded on shafts.
E-470 Public Highway Design/Build E-470/I-70 Interchange, Denver, CO: Design
overview of the E-470/I-70 interchange for E-470 Public Highway Design/build project.
The main structure is an 11-span precast concrete Tub girder bridge. The superstructure is
curved and consists of three continuous units with post-tensioning. The concrete piers are
supported on caissons and abutments are founded on steel piles.
CDOT, US 287, Loveland, CO: Lead Bridge Engineer responsible for the design of
four precast/prestressed Bulb Tee GIRDER bridges. The substructures included integral
abutments on H-pile and concrete column piers founded on caissons.
CDOT, 120th Avenue Bridges, CO: Lead Structural Engineer for the design of three
bridges, including a 5-span bridge and two single-span bridges. Precast/prestressed
concrete Bulb-Tee girders were used for the superstructures. The end bents were
concrete caps on stele HP piles and the interior bents were concrete columns on drilled
concrete shafts. Architectural form liner and stone accent columns were used on the
bridge for aesthetic effects.
CDOT, Crews Gulch Bridge on SH 85, Colorado Spring, CO: Project Structural
Engineer for a single span precast/pretressed Bulb-Tee girder superstructure with span
length of 38 meters and integral abutments on steel piles. The bridge was located in an
urban area and designed with raised median and sidewalk and a bike path underneath the
bridge.
City and County of Denver, Central Park Blvd Extension, Denver, CO: Lead
Structural Engineer for the design of three bridges, including a 2-span bridge over I-70
and two bridges over ramps. Precast/prestressed concrete Bulb-Tee girders were used for
the superstructures. The end bents were concrete caps on stele H piles and the interior
bents were concrete columns on drilled concrete shafts. Architectural form liner and
special railings were used on the bridges for aesthetic effects.
City and County of Denver, 56th Avenue Reconstruction, Denver, CO: Lead
Structural Engineer for the design of three highway bridges and one pedestrian bridge for
the project. The WB bridge over Haulroad is a new structure with precast prestressed
concrete girders. The existing Haulroad bridge is used for the EB traffic and
rehabilitation was designed to strengthen the abutments, replace the sidewalk and curbs,
and replace the expansion joints.
City and County of Denver, 6th Avenue Viaduct Condition Evaluation and Retrofit
Design, Denver, CO: Principal Investigator and Project Manager for this viaduct built in
1960’s and modified in 1990’s. The structure consists of 18 spans of composite steel
girders with a total length of 1430 feet. The viaduct showed extensive deterioration. Field
investigation was conducted to determine the bearing and other structural element
conditions and bridge movements. Stresses due to temperature fluctuation were measured
on steel columns using strain gages. Critical fatigue details were tested using ultrasonic
and dye penetrant techniques to detect potential cracks. A three-dimensional frame model
using SAP2000 was used to study the superstructure and substructure under thermal and
other loading conditions. Structural deficiency was identified with concrete deck, steel
girders, bearings, piers, and foundations. The retrofit involves replacing bearings and
columns and strengthening the foundations.
City and County of Denver, 8th Avenue Viaduct Thermal Analysis and Condition
Assessment, Denver, CO: Principal Investigator and Project Manager for this viaduct
built in 1980’s. The structure consisted of 20 spans of twin continuous steel box girders
with a total length of 2361 feet. The bridge was on three horizontal compound curves and
two vertical curves. The original guide system failed and extensive cracks were present
on all concrete piers. Field investigations were conducted to assess the bearing
movements and crack extension. A three-dimensional finite element model using ANSYS
was developed to study the structural movement and stresses due to thermal variation and
other design loads. The cracks on the pier were studied for structural strength and
integrity.
City and County of Denver, West Evans Avenue Bridge over South Santa Fe Drive,
Denver, CO: Principal Investigator and Project Manager for this project to assess the
structural conditions. The bridge consists of 9 spans of steel composite girders with a
total length of 765 feet. Field investigation was conducted to evaluate the bridge existing
conditions. Displacement measurement system was installed on the bridge to monitor the
bridge movement due to temperature fluctuation. Non-destructive testing was performed
on the steel girders and concrete piers to determine the steel corrosion and concrete
cracking. The bridge was studied for the structural capacity and retrofit recommendations
were provided for the steel girders, bearings, and concrete piers.
City and County of Denver, Lower Colfax Bridge, Denver, CO: Project Structural
Engineer provided structural selection, preliminary design, and final superstructure
design. The replaced structure consisted of three spans of precast/prestressed concrete
box girders. Integral piers and abutments with drilled caisson foundation were used.
Foundation Coal, SH 14/16 Relocation, Wyoming: Lead Bridge Engineer for a three-span
composite steel plate girder bridge. The bridge was located over a reclaimed section of the Eagle
Butte Mine that was backfilled with up to 275 feet of mining backfill material. The potential
consolidation settlement is the major concern for the design of the roadway and bridge. The
foundation utilized over-excavation with re-compaction to a depth of approximately 10 feet
below the bottom of the footings and geopiers to a depth of approximately 20 feet below the
bottom of the over-excavation beneath. Special steel settlement plates were installed under the
bearings so they can be removed in the future to adjust the deck profile for the uneven
settlements between the abutments and the piers.
WVDOT, Bridge on US 52, near Huntington, WV: Project Structural Engineer for the
design of a dual mainline bridge on US 52. The bridge was a three-span AASHTO Type
IV girders with deck slab continuity at interior bents. Integral end bents and solid wall
piers were supported on steel HP piles.
NCDOT, Truelight Church Bridge Over Charlotte Outer Loop, Charlotte, NC:
Project Structural Engineer for this two-span steel plate composite bridge with span
lengths of 44 m and 43 m. The bridge was on a 51-degree skew and located on a curved
section of the roadway. The substructure was steel HP pile end bents and intermediate
concrete column bent with steel HP pile foundation.
NCDOT, New Land Bridge, New Land, NC: Project Structural Engineer for the design
of a single span bridge with AASHTO Type IV girders and integral abutments on steel
HP piles.
NCDOT, Bridges on Charlotte Outer Loop over CRX, Charlotte, NC: Structural
Project Engineer for the design of a four-span AASHTO Type IV girder bridge and a
two-span steel plate girder bridge. The first bridge was 110 meters long and located on
both horizontal and vertical curves. The second bridge was 68 meters long. The
substructure included end bents of concrete caps on steel piles and interior bents of
concrete columns on concrete footings founded on steel piles.
PUBLICATIONS
"Fatigue of Concrete Beams Strengthened with Advanced Glass-Fiber Composite under
Flexure," in review, ACI Materials Journal.
"Performance of Polymer Modified Asphalt Bridge Expansion Joints in Low
Temperature Regions," ASCE Performance of Constructed Facilities, Vol. 23, Number 4,
pp. 227-233.
"Finite Element Simulations of Fiber Pullout Toughening in Fiber Reinforced Cement
Based Composites," Advanced Cement Based Materials, 7, 1998, pp. 123-132.
"Effect of Interfacial Properties on the Crack Propagation in Cementitious Composites,"
Advanced Cement Based Materials, 4, 1996, pp. 93-105.
"Mechanical Properties of Hybrid Cement Based Composites," ACI Materials Journal,
May-June, 1996, pp. 284-292.
"Modeling of Stiffness Degradation of the Interfacial Zone During Fiber Debonding,"
Composites Engineering, Vol. 5, No. 10-11, 1995, pp. 1349-1365.
"Experimental R-Curve for Assessment of Toughening in Micro-Fiber Reinforced Hybrid
Composites," American Concrete Institute, SP-155, 1995, pp. 93-114.
"Bridge Vibration and Impact under Moving Vehicles," Proc. 1996 Engineering Systems
Design and Analysis Conference, Volume 9, Structural Dynamics, Vibration, and
Buckling, ASME 1996, pp. 17-23.
"Processing Techniques for Manufacturing High Volume Fraction Cement Based
Composites," Proc., First International Conference on Composites in Infrastructure,
January 15-17, 1996, pp. 123-136.
"Effect of Bridge Deck Roughness on Bridge Dynamic Response," Proc., 7th
International Conference on Computational Methods and Experimental Measurements,
VII, May 1995, pp. 485-492.
"Modeling of Fiber Pullout in Cement Based Composites Using an R-Curve Approach,"
Proc. of the Third Materials Eng. Conference, Infrastructure: New Materials and Methods
for Repair, 1994, pp. 559-566.
"Tensile Fracture of Carbon Whisker Reinforced Cement Based Composites," Proc. of
the Third Materials Engineering Conference, Infrastructure: New Materials and Methods
for Repair, ASCE 1994, pp. 551-558.
"Fracture of Whisker Reinforced Cement Based Composites," Proc., International
Symposium, Brittle Matrix Composites 4, 1994, pp. 116-124.
"Effect of Interfacial Properties on the Strength of Cementitious Composites," Proc., The
First International Conference on Composites Engineering (ICCE/1), 1994, pp. 351-352.
"Finite Element Simulations of Toughening in Cement Based Composites," MRS 1996
Fall Meeting, Symposium HH: Structure-Property Relationships in Hardened Cement
pastes and Composites, Boston, Mass.
"Study of Bridge Vibration due to Moving Vehicles," Proc. 1994 Engineering Systems
Design and Analysis Conference, Volume 7, Structural Dynamics and Vibrations, ASME
1994, pp. 59-66.
"Bridge Vibration Study," 1991 Symposium of Bridge and Highway Engineering,” 1991.
"Study of Bridge Vibration due to Vehicles Moving on Irregular Bridge Decks," Journal
of Northeast Highway Engineering, Vol. 1, pp. 74-78, 1990.
"Bridge Vibration due to Local Deck Depressions," Journal of Transportation, Vol. 4, pp.
44- 50, 1987.
Download