Advanced Project Management Level 6 Advanced Project Management Session 1 Managing and Leading Projects Advanced Project Management Learning Outcomes At the end of this session candidates will be able to: Explore the various definitions and characteristics of a project Analyse the difference between leadership and management relating to projects Explore why organisations in different sectors need to engage in projects and consider different types of project Evaluate the importance and relationship of project and people management in achieving project goals. Demonstrate an understanding of external business environmental factors and how they may affect a project. Critically evaluate the concept of power and influence. Identify the key stakeholders for a purchasing and logistics project and how their power and influence change throughout the life of the project. Advanced Project Management Definitions of Project Management ‘… A set of activities with a defined start point and a defined end state, which pursues a defined goal and uses a defined set of resources.’ (Slack et al) “... A temporary endeavour undertaken to create a unique product or service”. (US PMI) “... The process by which projects are defined, monitored, controlled & delivered.....desired outcome......bring about change” (APM) Advanced Project Management Definitions Cips Study Guide “a group of activities that have to be performed in a logical sequence to meet pre-set objectives outlined by client” Meredith & Mantel “a specific, finite task to be accomplished......project seen as a unit....characteristics..importance, performance, lifecycle, interdependencies, uniqueness, resources and conflict” What are key features? Group exercise Advanced Project Management Distinctions between Leadership and Management “Leadership is the lifting of a person’s vision to higher sights, the raising of performance to a higher standard, the building of personality beyond its normal limitations”. “Nothing better prepares the ground for such leadership than a spirit of management that confirms in the day-to-day practices of the organisation strict principles of conduct and responsibility, high standards of performance and respect for the individual and his work.” Drucker; The Practice of Management Advanced Project Management What do Managers Do? Plan Organise Coordinate Control Lead Fayol Is this mainly a shorter term focus? Establishing overall purpose or policy Forecasting and planning Organising and allocating work Giving instructions Checking performance Coordinating the work of others Buchanan Advanced Project Management What do Leaders Do? Enable people and groups to achieve their objectives Set and communicate objectives Monitor performance and give feedback Establish basic values Clarify and solve problems for others Organise resources Longer term? Advanced Project Management Administer rewards and punishments Provide information, advice and expertise Provide social and emotional support Make decisions on behalf of others Represent the group to others Arbitrate in disputes Act as a father figure Become a scapegoat Leader or Manager? Group exercise What do you see as the key differences between management & leadership? Which skills are more important in project management? Recap Kotter p 11 – effective v efficient? Also Mintzberg p 12 Advanced Project Management 1 Reasons that Organisations Undertake Projects Change in: The external environment Markets and customer needs Technology Products and services Processes Globalisation Impatient customers Increasing demand for unique and customised solutions Change within organisations initiated by senior managers Paired ex – list examples for each point above – own org. or alternative Advanced Project Management Hard or Soft Projects Hard – normally refer to tangible, measurable activities and processes Soft – human factors and processes – eg communication, behavioural change and acceptance Can you easily distinguish simply between these two aspects of project work Is Millau Bridge a hard project? Advanced Project Management ‘Hard’ vs ‘Soft’ Projects Product development – p8 Process development – eg BPR Re-design/modification of products and processes Technology development Installation of new IT systems example p9 – London Ambulance Service Site relocation/closure Culture change Introduction of a new organisational structure A new appraisal scheme How would you categorise each of these? Advanced Project Management Lyson’s categorisation of projects: Manufacturing projects Construction projects Management projects Research projects Too simplistic? Constituents of the Project Context PEST/SLEPT factors Porters 5 Forces analysis Stakeholders Resource constraints Time constraints Overall strategy of the organisation CIPS syllabus Advanced Project Management Complexity Completeness Competitiveness Customer focus Maylor Common Stakeholder Expectations Fit for purpose Aesthetically pleasing Free from defects Delivered on time Value for money Reasonable running costs Satisfactory reliability/durability Supported by worthwhile guarantees Which stakeholders do each of above relate to? Advanced Project Management Stakeholder Power/Interest Matrix Level of interest Power Low High Minimal effort Keep informed Keep satisfied Key players Source: Mendelow, 1991 Advanced Project Management Stakeholders are likely to move between segments during the life of a project How do you keep stakeholders satisfied? Satisfaction = perception – expectation Manage their expectations Re projects – may be necessary to “sell” the final outcome Ensure know actual requirements – don`t over-promise Keep advised of progress Spec exam paper – Sportsco Q 1 Advanced Project Management Session 2 Managing and Leading Projects Advanced Project Management Learning Outcomes At the end of this session candidates will be able to: Evaluate and explain the idea of the project as a conversion or transformation process. Explore the concept of variety and volume in defining the nature of an operation and evaluate its application to project management. Describe the role of a project selection Advanced Project Management A Project is a Conversion Process Input resources Materials Information Customers Input resources Input transforming resources Facilities Staff Advanced Project Management The project (transformation process) Output (product/ service) Customers Conversion Process Inputs Transformed into Outputs Same as a process? What other input resources do you need? See p 30 Advanced Project Management Projects as a Technology Volume High Projects Small batch Low Variety High Low Advanced Project Management Large batch Process plant The Project Model Constraints: •Financial •Legal •Ethical •Environmental •Logic •Activation •Time •Quality •Indirect effects Input: Want/need Project Mechanisms: Advanced Project Management •people •knowledge & expertise •capital •tools & techniques •technology Output: satisfied need Project Constraints Group exercise Discuss examples and give reasons why Maylor lists these factors - in previous slide as constraints in his ICOM model Advanced Project Management Project Portfolio Process How many projects can an organisation handle? Identify projects that satisfy strategic needs They support multiple goals – feasible? They drive organisational improvement – why might these take priority? They enhance/enable ‘key areas’ – how determine? Advanced Project Management Portfolio Process Prioritise candidate projects Limit active projects to a manageable level – do you always have necessary resources? Identify risk-intensive efforts – why? Balance short-, medium- and long-term returns – why is this important? Prevent projects getting in the back door – how/why might this happen? Meredith & Mantel, 2005 Advanced Project Management Project Selection Factors Issues to Consider Operations Interruptions, learning, process Marketing Customer management issues Financial Return on investment – what is acceptable? Personnel Skills and training, working conditions – what impact on employee motivation? Administrative Regulatory standards, ‘strategic fit’ – with what? Meredith & Mantel, 2005 Advanced Project Management Strategic Success Factors Project mission – clearly defined and agreed objectives Top management support – top managers must get behind the project and make clear to all personnel at the outset their support Project action plan – showing details of the required steps and resource requirements in the implementation process Group ex – how would getting each of these factors wrong cause problems for an organisation? Can you think of any project failures attributable to any of these factors? Advanced Project Management Meredith & Mantel, 2005 What Projects Have in Common An objective or objectives, usually defined in terms of quality, time and cost – the “iron triangle” Each is unique – a ‘one-off’ – always? Of a temporary nature – what is temporary? A degree of complexity, stemming from multiple tasks and participants – often the key challenge A degree of uncertainty, often technical NB. A ‘programme’ implies greater longevity or continuity Spec Exam paper Q 3 Advanced Project Management Session 3 The Project Life Cycle Advanced Project Management Learning Outcomes At the end of this session candidates will be able to: Consider different approaches to the project life cycle Identify the different stages of the project life cycle and the key characteristics, demands and problems most likely to be encountered at each stage Evaluate the concept of the project life cycle as a management tool Investigate a variety of problem-solving approaches and the extent to which they may be relevant during the project life cycle Advanced Project Management Comparison of Characteristics of Projects and Problems Projects A supported purpose/ importance Specifications of performance (form, fit, function) Known solution Stages with finite due date Interdependencies Uniqueness Resource requirements and tradeoffs Stakeholder conflict Meredith & Mantel, 2005 Advanced Project Management Problems Intransparency – lack of clarity of situation Polytely – multiple goals Complexity – large numbers of items, interrelations and decisions Dynamism – time considerations Three-stage Project Life Cycle Source: Meredith & Mantel, 2003, Wiley Advanced Project Management Three Stage Life Cycle Why might work in project follow this guideline? Any examples? – construction of new housing estate Consider time/effort impact – fig 4.2 p 39 Alternative patterns? See p 40 Why is it important to know what is likely scale of progress? How identify in advance? Group ex – look at p 42 – relative importance of project objectives – agree? Advanced Project Management Four-stage Project Life Cycle D1: Define the project The brief D2: Design the project process Process & product knowledge D4: Develop the process The proposal/PID The outcomes D3: Deliver the project Source: Maylor Advanced Project Management Maylor’s Four-phase Approach Phase Key issues Key questions Define the project Organisational & project strategy; goal definition What is to be done? Why is it to be done? Design the project process Modelling & planning; estimating; resource analysis; conflict resolution; business case How will it be done? Who will be involved in each part? When can it start and finish? Deliver the project Organisation; control; leadership; decisionmaking; problemsolving How should the project be managed? Develop the process Assessment of process & outcomes; evaluation; changes for the future How can the process be continually improved? Advanced Project Management Developing a Project Strategy Getting started Moving forward Bringing it in Handing it on Analysis Commitment Consultation Preparation Feasibility trials Doing the work Making the change Handover Support Review Source: CIPS Advanced Project Management 4 Stage Models Group exercise Compare and contrast Maylors 4 stage model to Cips version on slide – also use Cips version p 45 – table 4.4 Are they effectively one and the same – or are there genuine differences? Advanced Project Management Five-stage Project Life Cycle Stage 1 Weiss & Wysocki Define Stage 2 Plan Stage 3 Changes Corrective action Organise Stage 4 Stage 5 Control Advanced Project Management Close Out 5 Stage Models See also Frigenti and Comninos model – p 45/6 Tables 4.5 and 4.6 p 46 – individual homework exercise – critically evaluate these 2 models, recommending your preferred option for use in your organisation Advanced Project Management McKinsey’s 7S Framework Strategy Structure Systems Shared purpose Style/ culture Staff Skills Advanced Project Management Source: McKinsey 7S framework The 7S Project Approach Element Description Strategy High-level requirements of the project and means to achieve them Structure Organisational arrangements that will be used to carry out project Systems Methods for work to be designed, monitored and controlled Staff Selection, recruitment, management and leadership of those working on project Skills Managerial and technical tools available to project manager and staff Style/culture Underlying way of working and inter-relating within the project/organisation Stakeholders Individuals and groups who have an interest in project process or outcome Advanced Project Management Source: 7S framework adapted by Maylor 7 S Framework This is a more strategic approach to Project management – focuses upon strategic alignment and “fit” Considers organisations capabilities, capacity, priorities and strategic objectives. Does project fit or match these areas? Consider impact of project on other activities and areas of the organisation – resources, culture etc Advanced Project Management Problem Solving Techniques Maylor Thamhain & Wilemon Thomas-Killman Conflict Resolution Brainstorming Ishikawa Fishbone Analysis Cause – Effect – Cause Analysis Decision Trees Pareto Analysis 5 Whys Lewins Force Field Analysis Advanced Project Management Systematic Problem-solving Model Problem identification Select solution Seek alternative definitions Implement Select definition Check and amend Evaluate possible solutions Source: Adapted from Maylor Advanced Project Management Thamhain & Wilemon What are main causes of conflict in projects? Group exercise – prioritise from following; Cost, Personalities, Priorities, Procedures, Schedules, Staffing, Technical Problems At what stage will some be more significant than others – use 4 stage approach – formation, early implementation, main programme, closing. Advanced Project Management Thomas-Killman Model 5 Approaches to conflict resolution Avoiding – what? When use? Forcing – what? Accommodating – why? Compromising – isn`t this always the best way? Collaborating – how does this work? Is it horses for course approach? Advanced Project Management Brainstorming Purpose To generate a large number of ideas To stimulate creativity Technique The ‘problem’ to be solved is described or stated Everyone participates, either in turn or simply by calling out in an orderly way A team member captures everything as said on paper/board No judgement or criticism of others’ suggestions: the group accepts outrageous, unrelated ideas Ideas are developed by building on others’ ideas When there are no more ideas, the exercise is over What are difficulties of using this technique in work environment? Advanced Project Management Ishikawa Fishbone Analysis Purpose To visually represent in specific categories the probable causes of a problem To help people visualise a problem and structure its analysis Process Identify the ‘problem’ and place it in the ‘Effect’ box. Trace the process through all stages to identify all possible contributory causes. Use the Brainstorming technique to consider all the possible causes that may result in the ‘Effect’. Group possible causes under headings (for example, the 4Ms: Methods, Manpower, Materials, Machines; or steps in the process being analysed). Advanced Project Management Example of Fishbone Diagram MACHINERY MANPOWER Insufficient space at locations Mixed or misplaced stock Incorrect tube pattern Labelling on lowest rack No stock stickers Loose components Loose end stops Uneven tube lengths MATERIALS Advanced Project Management Incorrect quantity at location Counting EFFECT Error in item stock control Poor quality staff training Consecutive rack numbering Excessive movements Poor procedures Returns METHODS Cause-effect-cause Analysis Purpose To overcome stagnation in solving problems that are complex and difficult to structure To identify the root cause of a problem Technique Best results emerge when a skilled facilitator is available State the problem and identify the effects Explore how the effects relate to one another Use ‘why’ and ‘how’ successively to explore causes of the observed effects Form a cause-effect diagram on which action can be taken – see p 59/60 Advanced Project Management Decision Trees Purpose To identify likely outcomes and probabilities in a problem To calculate the expected value of possible outcomes Technique Identify the scope of the decision to be taken Identify sub-decision points Identify the outcomes and probabilities possible from each decision point Calculate the expected values for specific routes through the tree May 07 Exam paper Q 5 Advanced Project Management Session 4 Contemporary Approaches to Managing Projects Advanced Project Management Learning Outcomes At the end of this session candidates will be able to: Explain the 6Σ approach and what it seeks to achieve Identify the eight key processes and requirements of PRINCE2 and evaluate the effectiveness of this approach to project management Analyse the key requirements of Critical Chain and explain how projects that use CCPM can achieve better results than other methods Explain concept of theory of constraints Advanced Project Management Six Sigma A continuous improvement method – Motorola, 1986 Since applied and popularised by others, for example, GE and Honeywell Aim – To profitably improve the quality of products and services to the customer Statistically, a defect rate = 3.4 defects per million opportunities – 99.9997% perfect Is this always appropriate? Requires major investment in time and resources Advanced Project Management Six Sigma Key characteristics: Focuses on the customer's critical-to-quality needs (CTQs) – V.O.C.- what are they? How establish? Concentrates on measuring product quality and improving process engineering Gives top-down, project-driven process improvement and cost savings Is a business strategy execution system and so is truly cross-functional Provides focused training with verifiable ROI Is business results oriented Advanced Has Project 3 keyManagement component areas – Process Improvement, Process Design (Redesign), Process Management Process Improvement - DMAIC Define … the project goals and customer deliverables Measure … the process to determine current performance Analyse … and determine the root causes of defects Improve … the process by eliminating defects Control Advanced Project Management … future process performance so that improvements can be sustained Process Design (Redesign) DMADV Define – Id and set goals Match/measure – benchmark against customer needs/expectations Analyse – performance measurements & outline enhanced processes to meet customer needs Design/implement – new processes in detail Verify – controls to ensure compliance Advanced Project Management Process Management Changes how organisation is structured and managed 4 Steps are ; 1) Understanding processes and customer expectations 2) Continual measurement 3) Analysis of data 4) Responding to variances Is 6 Sigma a project management tool? Advanced Project Management Benefits of Six Sigma Direct benefits Indirect benefits decrease in defects reduced cycle time lower costs to provide goods and services. data-based decisions sustained gains and improvements better safety performance fewer customer complaints Advanced Project Management improved customer relations and loyalty team-building effective supply chain management increased margins greater market share world-class standard development of staff skills Statistical Basis of Six Sigma Advanced Project Management Prince 2 Originated by UK Gov in 1989 – Prince 2 - 1996 Designed for public sector I.T. Projects Now generic approach for all types of project 8 stage model – see Fig 6.1 page 67 and note the 8 inter-reacting stages plus external stage of Corporate Management –goup ex – read and evaluate Advanced Project Management PRINCE2 (Projects In Controlled Environments) Key processes Project management Directing the project Planning a project Starting up a project Initiating a project Controlling a stage Managing product delivery Managing the stage boundaries Closing a project Advanced Project Management Project Board: Project assurance Project support Project manager Documentation: Quality log Issues log Risk log Bureaucratic controls Emphasis on early conflict resolution Prince 2 Group exercise What are advantages and criticisms re this approach? See p 69 – agree with OGC claims? Advanced Project Management Critical Chain Traditional project estimation techniques ineffective: Time and resource constraints usually violated, for example, • People have to multi-task – see p 71 • General Uncertainties • Departments include safety margins • Parkinsons Law • Goldratt – pass on delays but not advances • ‘Student syndrome’ (last minute) So, PMs rely on ‘padding’ of schedules and budgets to provide slack Unknown nature of event interaction Maylor, 2003, Meredith & Mantel, 2005 Advanced Project Management Theory of Constraints Approach Project cannot move faster than slowest process – “convoy effect” or “weakest link” Approach is to manage bottlenecks (constraints) Activities with several predecessors and/or successors Add ‘time buffers’ at bottleneck events • ‘Safety stock’ has equivalent in manufacturing • ‘Just-in-case’ equivalent to JIT • Statistically-derived ‘path buffers’ Establish the critical chain for scarce resources Prioritise resources in chain events Meredith & Mantel, 2005 and Goldratt’s ‘Theory of Constraints’ Advanced Project Management Constraints 2 – see p 72/73 Main stages of the TOC approach: Identify the constraint (critical path/critical resources) Exploit the system constraint – ie work it to its maximum capacity Subordinate everything to the constraints Elevate the constraint – find additional resources for it Go back and find new constraints May Exam Case Study Q 1 Advanced Project Management Session 5 Exploring the Stages of a Project Advanced Project Management Learning Outcomes At the end of this session candidates will be able to: Identify and explain key stages in a typical project. Explain the tasks during project initiation and definition Explain what is involved in developing a project plan and budget and in evaluating project risk Explain how a project might be structured and resources recruited, organised and allocated Identify key methods of measuring and controlling project performance and recommend an appropriate approach for a project Explain what is involved in the closure of a project Explain what is involved in the review and evaluation of a project and the learning stemming from it Advanced Project Management Stages of a Typical Project 1. 2. 3. 4. Initiation and definition Planning Organisation and implementation Measurement, monitoring, control and improvement 5. Closure 6. Review, evaluation and learning Not directly comparable with earlier examples of life cycle models Lysons Advanced Project Management Stage 1 – Initiation and Definition What’s involved Identifying project goals Listing project objectives Determining preliminary resources Identifying assumptions and risks Tools & techniques Financial appraisal Project initiation document (PID) Quality Function Deployment Risk analysis & risk/impact matrix Suitability/feasibility/vulnerability Voice of the customer Advanced Project Management Stage 1 Needs to consider; Project selection – “sacred cow”, operating necessity, competitive necessity, product line extension, comparative benefit – what do these mean? Numerical selection methods – unweighted factor (how many boxes does it tick), unweighted factor scoring ( what marks does it score in each box), weighted factor score (which boxes are more important) See P79 - discuss Advanced Project Management Stage 1 - continued Scope/outcomes – what is excluded? Timing Resources – what types? What R.O.I? Resources. Cashflow Risk Impact – how? Likelihood/impact V.O.C. – remember 6 sigma Advanced Project Management Stage 2 – Project Planning What’s involved Tools and techniques Project initiation document (PID) Work breakdown structure – what/who/where/when Network diagrams and CPA QFD Risk analysis & risk/impact matrix SIPOC – see session 7 Advanced Project Management Identifying activities Estimating time and cost Sequencing activities – why important? Identifying critical activities Refining the plan Updating the initial risk analysis Writing the project proposal Stage 2 What will be involved? Range and scope Sequence – often critical – why? Why written plan? How used? Project creep Timing & Costs – assess spending against likely achievements not time spent on activity – why? Budgets – top down/bottom up? Use of Critical path analysis – significant aspect at this stage – why? Advanced Project Management Stage 3 – Organisation and Implementation What’s involved Determining personnel needs Tools and techniques Recruiting the project manager Recruiting the project team Organising the team Assigning work packages Network diagrams and CPA Seven tools of quality control Problem-solving tools Risk analysis & risk/impact matrix Team roles (Belbin) Advanced Project Management Stage 3 How project team is set up! How does existing organisational structure impact upon this? Group exercise - What attributes do we need on the team? Where do Belbin, Tuckman, Maylor models fit in this aspect of project management? Cross functional teamworking – issues, problems Advanced Project Management Stage 4 – Measurement, Monitoring and Improvement What’s involved Defining management style Tools & techniques Establishing control tools Preparing status reports Reviewing the project schedule Issuing change orders SIPOC Problem-solving tools Seven quality tools QFD Advanced Project Management Stage 4 Consider both Organisation & Project Team Structure What is appropriate management style – vary depending on project type/nature? How control project? – which methods? Reporting process – to whom? Deadlines – key stages How/when review/evaluate progress? How communicate change? Important at this stage to refer back to original proposal – why? Advanced Project Management Stage 5 – Closure of the project What’s involved Obtaining client acceptance Installing deliverables Documenting the project Issuing the final report Tools and techniques SIPOC Seven quality tools Advanced Project Management Stage 5 Have we met project aim? V.O.C. Implement project – do it! Does it work? Why record the process used? Learning is crucial – can be more important than project itself? Why? Report – to who? Finality Team feedback Closure Advanced Project Management Stage 6 – Review, Evaluation and Learning What’s involved Conducting a project audit Learning lessons (from successes and failures) Communicating the review, evaluation and learning Tools and techniques SIPOC Seven quality tools (including cost of quality) Project review Advanced Project Management Stage 6 Audit process – did we achieve success? Who audits? Internal? External? Audit only at end of project? Is on-going audit preferable? Why? What are problems/drawbacks re auditing? Learning – Kolbs learning cycle Spec exam paper Q 4 Advanced Project Management Session 6 Tools & Techniques for Data Collection, Analysis and Decision Making Advanced Project Management Learning Outcomes At the end of this session candidates will be able to: Utilise a range of tools and techniques to assist in data collection, analysis and decision-making: Appraise appropriateness, selection and implementation of the tools and techniques available to the project team Advanced Project Management Project Management Tools Seven tools of quality control Financial appraisal Voice of the customer Quality function deployment Project initiation document (PID) ‘Moments of truth’ Risk analysis and assessment (risk mitigation) Risk/Impact matrix Suitability/feasibility/vulnerability Advanced Project Management Evaluating PM Tools and Techniques Appropriateness Show that you can pick the right tool for the task Selection Show that you are aware of the limitations, as well as its capabilities Implementation Show that you can use the tools correctly Advanced Project Management Ishikawa 7 Tools of QC Flowcharts – graphical depiction of process Check sheets – simple log of occurrences of specific event/problem Pareto Fishbone diagram Histogram – bar chart – shows data in grouped frequency distribution Scatter diagram – eg correlation between advertising spend and sales Statistical Process Control charts – control limits re acceptable performance/tolerances Advanced Project Management Risk Assessment What is the situation to be assessed? What can go wrong? (What are the hazards?) What is the probability that each hazard will occur? What are the consequences if it does go wrong? What is the uncertainty of our risk assessment? Summary – probability, impact and uncertainty Recommendations Advanced Project Management ‘Risk’ vs ‘Uncertainty’ Risk – When the decision maker knows the probability of each and every state of nature and thus each and every outcome. An expected value of each alternative action can be determined Uncertainty – When a decision maker has information that is not complete and therefore cannot determine the expected value of each alternative Meredith & Mantel, 2005 Advanced Project Management Financial Appraisal Payback period – time to recover initial investment through estimated cash inflows from the project Average rate of return (ARR) – average annual profit ÷ average investment Discounted cash flow (DCF) – present value method Internal rate of return (IRR) – rate of return that equates present value of cash inflows and outflows Profitability index – NPV of all future expected cash flows ÷ initial cash investments Advanced Project Management Quality Function Deployment QFD = VOC Final design/outcome = customers needs See p 109/110 for worked example Advanced Project Management Service Quality ‘Moment(s) of truth’ An interaction with a customer SAS in 1980s: Average passenger was in contact with five SAS staff per trip Five million passenger journeys a year 25m opportunities a year to satisfy or dissatisfy customers Dimensions of service quality Access Communication Competence Courtesy Credibility Reliability Responsiveness Security Understanding Tangibles Parusuruman, Zeithaml & Berry Advanced Project Management Risk/impact Matrix Impact High Probability High Low Low Tolerance threshold (depends on organisation) Advanced Project Management Session 7 Systems and Processes in Project Management Advanced Project Management Learning Outcomes At the end of this session candidates will be able to: Demonstrate the approach of systems thinking and process focus using process mapping techniques and procedures Explain end-to-end processes Construct a flow chart for a process Explain the interfaces and swim lanes Explain the workings of critical chains software and its impact on projects Appraise appropriateness, selection and implementation of the systems and process techniques available to the project team Advanced Project Management SIPOC Mapping Suppliers Inputs Advanced Project Management Process Outputs Customers Flow-charting Processes Purpose To describe the ‘flow’ of a process Process Identify the process to be charted. It should have defined inputs and outputs and an ‘owner’. Define the start and end of the process with a circle or oval. Identify the major steps and represent each with a rectangle. Start the description of each step using a verb (doing word), for example, measure diameter, collect from stores. Show decisions as a diamond with no more than two outcomes (for example, ‘yes’ and ‘no’) Represent the flow through the process with lines, using arrows where necessary for clarification, for example, up-arrow where flow returns to a previous step. Advanced Project Management Work Breakdown Structure Lists tasks to be completed – assigns responsibility for each task Can`t eat an elephant Supported by Linear responsibility chart – who “owns” task and where cooperation between depts or individuals is required Gantt Charts – measures actual and planned progress – quickly highlights overruns – resource planner – even out demand for resources Advanced Project Management Interfaces and Swim Lanes Activities organised into channels – each one representing the responsibilities of individual, dept or organisation Highlight processing gaps and inefficiencies Focus attention on high-risk areas where work is transferred between groups – the interface See p 135 Advanced Project Management Critical Path Analysis Use Profex p 114 – 118 Worked example Crashing the project Pert – use of estimates of likely duration of activity, optimistic estimate and pessimistic estimate to calculate mean time and standard deviation re activity. Then use of probability statistics to estimate likelihood of over-runs Gert – uses concept that some activities may fail & need repeating – use of statistics to estimate likely occurrence and costs of such events Advanced Project Management Session 8 Techniques for Purchasing and Logistics Projects Advanced Project Management Learning Outcomes At the end of this session candidates will be able to: Identify a range of purchasing and logistics projects Identify characteristics that differentiate these projects from projects in other functional areas Apply and appraise the usefulness of standard project management tools and techniques for purchasing and logistics projects Apply computerised project management systems for purchasing and logistics projects Advanced Project Management Examples of P and S Projects Group exercise – what projects are currently running in your org purchasing function? What is your involvement? What are key objectives? What are main difficulties and constraints? Advanced Project Management Characteristics of P and S projects Specific Time Constrained Limited Resources Cost Reduction Product performance Overcoming reluctance to change by internal stakeholders Including int. Stakeholders in project – getting their commitment Accessing variety of data – internal & external Securing significant “added value” for org. Develop good external relationships with suppliers Advanced Project Management Managing P and S Projects Group exercise Applying concepts and models – which of those examined so far do you use in your organisation? Applying tools and techniques – which work best in your org? Applying software – which do you use? How effective is it? What are advantages? See next slide Advanced Project Management Software Systems Provide support in: Tracking contracts Tracking responsibilities Tracking activities Communicating Integrating E-tendering Advanced Project Management Evaluation criteria The nature of the products Ownership of the code Stability of requirements Software maintenance and development Software Systems Group exercise What are main benefits in using software packages for running projects? What are the disadvantages? Advanced Project Management Session 9 Key Factors in Successful Project Management Advanced Project Management Learning Outcomes At the end of this session candidates will be able to: Evaluate the elements of the ‘iron triangle’ and their interdependency Contrast the ‘iron triangle’ approach with the contingency and critical chains (‘crashing’) approaches Analyse and identify process-based factors in the success and failure of purchasing and logistics projects Explain the requirements of effective project leadership Appraise the qualities and characteristics of a successful project manager Analyse and explain the characteristics and importance of teamwork in a project Analyse the extent to which people management and leadership issues contribute to success and failure in projects Advanced Project Management The ‘Iron Triangle’ Quality Constituents of objectives: •Purpose •End result •Success criteria Cost Advanced Project Management Time Iron Triangle Standard idea Simple concept Relatively simple factors to measure Relevant for all projects – at least in part Need to clarify objectives of each clearly at outset Fundamental to negotiations However – remember targets will probably change during project lifetime Advanced Project Management Contingent Approaches - no one “best way” – “it depends” Developed during the 1990s to overcome weaknesses in the previous ‘one best way’ approach Loose framework of approaches – use most suitable for the circumstances Emphasise and cater for: Strategic context of projects with their wide range of stakeholders Developments in technology New management methods, for example, virtual teams Development of more capable PM software Advanced Project Management Contingency approach 2 Project managers integrate: Resources Knowledge Processes Means using one approach (or more) appropriate to the circumstances (contingencies) Advanced Project Management ‘Crashing’ Project Float ‘Crashing’ is the process of reducing time spans on critical path activities so that the project is completed in less time Usually involves greater cost: Effect: Cost Overtime working Allocating additional resources Subcontracting Advanced Project Management Time Responsibilities of a Project Manager Responsibility to the parent organisation Responsibility to the client Responsibility to the team members “Above all, the PM must never allow senior management to be surprised” – Being prepared to give ‘bad news’ Meredith & Mantel, 2005 Advanced Project Management Key Activities of Project Managers Shaping goals and objectives – project goal inevitably changes Obtaining resources – easy? Building roles and structures for their team – “followers make their leader” Establishing good communications Seeing the whole picture –strategic vision Moving things forwards (especially in difficult circumstances) - driver Advanced Project Management Role and Skills of the Project Manager Background and experience relevant to needs of project Leadership and strategic expertise for the ‘big picture’ Technical expertise for sound decisions – always? Interpersonal competence and people skills to champion, communicate, facilitate, motivate, and so on Proven managerial ability for getting things done Weiss & Wysocki Advanced Project Management Skills “He who has not walked the road, does not know the potholes” – Confuscius Group exercise Agree with Confuscius? What other skills does project manager need? Advanced Project Management Factors Affecting the Project Manager’s Role and Style Nature of the task Organisational structure Organisational culture Individual motivations of the team members Style: Cooperation ↔ Coercion Maylor Advanced Project Management Four Roles for Project Managers Leadership – the vision and style Motivation – managing expectations and rewards Team building – skills mix and cooperation between members Communication – different aspects and different stakeholders Advanced Project Management Project Teams Personality theories, for example, Belbin based on: Intelligence (high/low) Dominance (high/low) Extraversion/introversion Stability/anxiety Team activities Content – what the team does Process – how the group works • Task processes • Maintenance processes Team dynamics Forming Storming Norming Performing Mourning Advanced Project Management Project Teams Teams make projects succeed – agree? Who is in team? Temporary? Cross functional Conditional Crisis? Virtual teams? – core – peripheral team members Advanced Project Management Belbin’s Team Roles Implementor Organising; practical Inflexible Coordinator Welcoming; strong sense of objectives Ordinary intellect or creativity Shaper Drive Prone to impatience and provocation Plant Genius Up in the clouds Resource investigator Knows ‘a man who can’ Soon loses interest Monitor evaluator Judgement; critical reasoning Unimaginative; not inspirational Teamworker Promotes team spirit Indecisive Completer/ Finisher Perfectionist Tends to worry about nothing Specialist Technically specialised Uninterested outside own area Advanced Project Management Dimensions of Project Success Efficiency – meeting the budget and schedule Customer impact/satisfaction – complex to define and evaluate – what is their perception of success/failure? Does it match yours? Business/direct success – delivering a result for the business Future potential – again, somewhat difficult and nebulous to ascertain Meredith & Mendel, 2005 See also work of Westerveld – Profex p180 para 1.10 Advanced Project Management Critical Success Factors in Projects Clearly defined goals Competent project manager Top management support Competent project team members Sufficient resources allocated Adequate communications Control mechanisms Feedback capabilities Responsiveness to clients Troubleshooting mechanisms Project staff continuity See p 158 – slight variance Pinto & Slevin (1987) in Slack, Chambers & Johnston Advanced Project Management Critical Success Factors Westerveld Leadership & Team Policy & Strategy Stakeholder management Resources Contracting Project management itself – scheduling, budgeting etc P180 para 1.11 Advanced Project Management Ten Ways Projects may Fail 1. Failure to appreciate the impact of a multi-project environment on single project success 2. Irrational promises made due to a failure to take into account the variable nature of task performance 3. Irrational promises made due to a failure to take into account the statistical nature of project networks 4. Insufficient identification of dependencies 5. Focus on, and active management of, only a portion of what should be the full project Advanced Project Management 6. Reliance on due-date and wasting of any safety included in the project 7. Wasting of resources through sub-optimal utilisation 8. Wasting of the ‘best’ resources through overuse, multi-tasking and burn-out 9. Delivering original scope when conditions/needs change OR accepting changes to scope without sufficient impact analysis 10. Multi-tasking Group ex – what others can you add? Project Failure Consider Greer – p 159 table 11.4 Do you agree with these? Are they more logical than those selected on previous page? Advanced Project Management Session 10 Project Management and Strategic Practice Advanced Project Management Learning Outcomes At the end of this session candidates will be able to: Critically evaluate the key characteristics of the various forms of organisation structure and culture and their consequences for project management Explain the key factors for consideration in choosing the best organisational structure for a project Critically evaluate the use and value to organisations of project management maturity models Evaluate the relationship between the business excellence model and the project management excellence model Understand and explain what is meant by knowledge management and organisational learning Demonstrate the strategic benefits and advantages gained through knowledge management and organisational learning Appraise the impact of a organisational learning on the management of projects in purchasing and logistics Advanced Project Management The Functional Structure The project Advantages The owning division should have the relevant expertise Specialists can share their knowledge and overtime expertise accumulates It provides a clear sense of ownership and ensures continuity Advanced Project Management Disadvantages It may engender a ‘silo’ mentality. Other specialists may not be consulted Routine work may take precedence over the project Motivation may suffer if the project is perceived as a professional diversion The Project Structure Project A Project B Project C Advantages Manager has full authority over the project with senior management backing Grouping necessary resources in the project ensures rapid decision making Relevant expertise is drawn from other parts of the organisation The project team has a strong sense of identity and common purpose Advanced Project Management Disadvantages It is suitable only for larger projects as it is expensive to resource Isolationism can develop leading to an ‘us’ and ‘them’ culture Team members may lack technical expertise or understanding of user needs The Matrix Structure The project Advantages An individual project manager takes responsibility, usually with strong senior management support Relevant resources are allocated as required, giving flexibility as well as expertise Advanced Project Management Disadvantages Decision-making power may still reside outside the project team Members are likely to be working only parttime on the project and have at least two managers, which may cause anxiety There may be a high level of competition and in-fighting for resources What is Organisational Culture? ‘The deeper level of basic assumptions and beliefs that are shared by members of an organisation, that operate unconsciously and define in a basic taken-for-granted fashion an organisation’s view of itself and its environment’ E. Schein (quoted in Johnson & Scholes) Advanced Project Management A Typology of Culture Type of culture Representation Power A web – spider – power from the centre Role A Greek temple – columns – highly defined structure – large, hierarchical orgs Task A net or matrix – suit project/problem solving teams – power from knowledge People A cluster – members superior to the org. Source: Handy, Understanding Organisations Advanced Project Management Culture and Management Approaches Characteristic of culture Impact on management style Anglo-Saxon cultures Delegation a preferred managerial style Highly centralised authority It is PM’s responsibility to seek out information International culture PM cannot count on being voluntarily informed of problems by subordinates Highly structured social classes Participative management is difficult to practise; there is an assumption that the more educated, higher-class manager’s authority will be denigrated by using a participative style Highly structured social system The less direct managerial communication tends to be Advanced Project Management Adapted from Meredith & Mantel, 2005 Culture Group exercise Why is it important for a project manager to be aware of cultural issues within an organisation? Advanced Project Management Organisational Readiness The organisation places a high value on serving customers The commitment of senior managers is long-lasting Key staff departments are positive about the prospect of change The organisation has the human resources needed The organisation had the financial resources needed The organisation as a whole recognises the need for fundamental change The organisation has none of the complacency and arrogance that often follows a sustained period of success The organisation is free of the scepticism, mistrust and ambivalence that often follows a period of change The organisation’s experience with TQM has created an environment that is receptive to change Hammer & Stanton Advanced Project Management Project Management Maturity Matrix World-class Wannabes Improvers Flat-liners Flat-liners Little or no progress in project performance Mistakes repeated; performance stays flat Improvers Some improvement Performance improves slightly over time Wannabes Follow every initiative going in order to catch the leaders World-class performers Set ever-increasing standards of performance Advanced Project Management Project Excellence Project excellence comprises cross-functional processes, project decision making, and team organisation that enable firms to bring highquality products to market rapidly. Project excellence builds on functional excellence (that is, when a function has the necessary resources, along with standards, procedures, and tools, to be effective and efficient). Four major elements are required to deliver projects effectively. These elements include the people and processes involved in development: project governance, a defined development process, project core teams, and the project decision process are the four elements. Advanced Project Management Advanced Project Management Project Excellence Model® Organisational areas Results areas Policy & strategy Appreciation Client Appreciation Project team Environment Leadership and teams Project management Means Appreciation Ind. parties Appreciation Contractors Contracting Feedback Advanced Project Management Appreciation Users Project results Source: Westerveld EFQM Business Excellence Model Enablers Results People Management ( 9% ) Leadership (10%) Policy & Strategy ( 8% ) Resources ( 9% ) Advanced Project Management People Satisfaction ( 9% ) Processes (14%) Customer Satisfaction ( 20% ) Impact on Society ( 6% ) Business Results (15%) Knowledge Creation and Management Externalisation Socialisation Articulating tacit knowledge explicitly Sharing experiences Combination Internalisation Building a ‘knowledge system’ Learning by doing Tacit knowledge Explicit knowledge To Advanced Project Management A Learning Organisation is … “… Capable of benefiting from the variety of knowledge, experience and skills of individuals through a culture which encourages mutual questioning and challenge around a shared purpose or vision.” Johnson & Scholes Advanced Project Management Characteristics of a Learning Organisation Existence of conflicting ideas and views Tolerance of failure Acceptance of ambiguity and uncertainty with their attendant risks Surfacing of assumptions and explicit debate widely within the organisation Tolerance of a diversity of views Tolerance of ‘organisational slack’ Advanced Project Management Using Learning and Discovery Start with a ‘loose’ project approach built on many assumptions which are known Accept the risks associated with the uncertainties Track and review assumptions on a regular basis Modify the assumptions and activities in the light of experience Gradually learn what works and what doesn’t Advanced Project Management