North Carolina CTS Committee Meeting #9 June 19, 2001 Introduction and Welcome Status Updates: Scoping/Basin Plans Phase I Scoping Schedule Basin White Oak Lumber Tar-Pamlico Cape Fear Neuse Pasquotank Final Initial Final Basin Draft Scoping Scoping Plan Basin Plan Meeting(s) Meetings Oct 25 - Nov 10, 2000 Nov 1 - Dec 1, 2000 Oct 3 - Dec 1, 2000 Nov 13 - Dec 8, 2000 Oct 24 - Dec 13, 2000 Nov 10 - Dec 13, 2000 Dec 14, 2000 Dec 19, 2000 (Jun 22, 2001) Dec 28, 2000 Jan 4 - 5, 2001 (Jul 6, 2001) Jan 23, 2001 Jan 30-31, 2001 (Jul 20, 2001) Feb 27, 2001 Mar 6 - 8, 2001 (Aug 3, 2001) Apr 13, 2001 Apr 23 - 24, 2001 (Aug 17, 2001) May 7, 2001 May 17-18, 2001 (Aug 31, 2001) Proposed Phase II Scoping Plan Scoping in 5 central river basins planned to start October 1, 2001: First emphasis on Chowan, Roanoke, and Yadkin River Basins 36 counties 3 scoping teams Catawba and New River Basins to follow 15 counties scoping teams tbd Status Updates: Flood Data and Mapping Development G&O Status Watershed Concepts Status White Oak Basin Tar Pamlico Basin White Oak River Basin Terrain: 100% Complete Survey: 100% Complete Hydrology: 50% Complete Hydraulics: 33% Complete Floodplain Mapping: 25% Complete Sample DFIRMs presented at ASFPM White Oak River Basin Onslow County – Preliminary DFIRMs Tar-Pamlico River Basin Field Survey: Structure Surveys: 100% Complete Cross Section Surveys: 50% Complete High Water Mark Surveys: 15% Complete H&H: Hydrology: 10% Complete Revised Schedule White Oak River Basin DFIRM: August 30, 2001 Status Updates: LIDAR Surveys and DEM Development Watershed Concepts — LIDAR Pre-Processing Status 6/08/01 Watershed Concepts — Vegetation Removal Status 6/08/01 G&O — Automated LIDAR Processing Status 6/08/01 G&O — Bare Earth DEM Generation Status 6/08/01 G&O — TIN Generation Status 6/08/01 Status Updates: LIDAR Quality Control Surveys Quality Control Surveys Status Updates: DFIRM Specifications DFIRM Graphic Specifications State has received FEMA’s comments on latest prototype New prototype that incorporates final comments will be generated for inclusion in DFIRM Delivery Order DFIRM Database Specifications Draft DFIRM database tables conceptualized for inventory, base mapping, and DFIRM mapping Engineering judgement tables under discussion Additional table definitions and documentation needed Status Updates: Program Funding/Partnering Information Technology Requirements Analysis, Preliminary System Design, Work Plan, and Delivery Order Higher Standards Draft Document Policy & Procedures Manual Purpose of the Manual Consolidate information about the NC Flood Mapping Program in one location Inform new staff about the program Serve as a resource for future CTS projects Contents of the Manual Two major units Policies Procedures Appendices to include Mapping Activity Statements, a template for the basin plans, and templates for the Delivery Orders Policies Unit Explanation of the process for raising and resolving programmatic issues and for establishing new policies Flowchart depiction of the process Policy establishment Procedures for Mapping Unit Overview of the flood mapping process for North Carolina Sections to describe the mapping components: Scoping Leveraging Existing Geospatial Data Resources Production Topographic Data Development Flood Data Development DFIRM Production Quality Control Reviews Procedures for Mapping Unit (continued) Post-Preliminary Processing Data Dissemination and Archiving Map Maintenance Education/Outreach Contracting Approach Higher Standards Flood Warning System Post-Flood Verification Partnerships Funding Procedures for Mapping Unit (continued) Where applicable, each of the sections will have two subsections for (1) Procedures and (2) Standards and Specifications Partnering/MOA Community Partnering Cooperating Technical Partner MOA GIS Data Sharing MOA Issue Discussion: Surface Water Mapping for DFIRMs Purpose This issue paper is a discussion of the mapping and handling of surface water features and names as part of the DFIRM production for North Carolina. Background The mapping of surface waters is desired to be comprehensive, accurate, and complementary of the other data layers that are part of the FMP and the Corporate Geographic Database. Existing Data Resources Statewide 24k by River Basin Statewide NHD24k by Cataloging Unit FMP Breaklines 12k Locally derived surface The US Geographic Names Information System (GNIS) Existing FIRMs and FIS contain surface water feature names Breaklines It contains single, double, and centerlines for units 1 square mile and larger. It does NOT contain all of the same linework as USGS Topo. It is more accurate (1:12,000 and 1:4,800). It is hydrologically corrected (dendritic network, flowing downhill). It is topologically corrected (no dangles, except at network inputs and outfalls). Issue Discussion: Panel Numbering DFIRM Map Numbering System SS MM LLLL PP X SS = State FIPs code (37) MM = EN 1,000,000-ft coordinates LLLL = LRMP map numbers to include EN 100,000-ft coordinates and the EN 10,000-ft coordinates PP = place holders for additional EN 1,000-ft coordinates (00 for panels printed at 1"=500') X = panel suffix (“A” for initial edition) DFIRM Map Numbering System (Continued) New DFIRM panels in North Carolina could either be compiled at 1”=1,000’, covering an area of 20,000 ft x 20,000 ft (20” x 20” maps); or the DFIRM panels could be compiled at 1”=500’, covering an area of 10,000 ft x 10,000 ft (20” x 20” maps). An additional 2-digits (both zeros) are held in reserve as a “place holder” in the event that future DFIRM panels may be printed at a larger scale, e.g., 1” = 250’, covering an area of 5,000 ft x 5,000 ft for which the 1,000 ft coordinates would either be 0” or 5." Issue Discussion: Potential Delegation of LOMCs Potential Delegation of LOMCs On Friday June 15, 2001, the following individuals from NC visited D&D for a LOMC Introduction / Workshop Gary Thompson (NCGS) Kurt Sumner (Executive Director ACSM, National) Tom Morgan (NCSS Representative on CTS) Johnie Garrason (NCSS Member and Board Examiner for NC Engineers and Surveyors) Richard Bennett (NCSS President) Benji Brown (NCSS Member and City of Wilmington Representative) Matt Miller (FEMA HQ) Teleconferenced in for a portion of the afternoon discussion Potential Delegation of LOMCs The following topics were covered during the LOMC Introduction/Workshop General LOMC Requirements New LOMR-F Rule Processing Cases with Special Considerations Call Center Support LOMA 2000 Processing Workshop Other Related Processing Issues Where do we go from here? Action Items/Wrap Up