Madhu Arora, GM (Corporate Restructuring) 0 Performance Management System A robust and effective performance management system is an important HR tool to measure and incentivize desired behavior 1 Performance Management System in BSNL Given BSNL's size and complexity, a step-wise approach adopted to introduce PMS in BSNL PMS Comprehensive group based approach to cover all employees in Group PMS (GPMS) Field level PMS (FPMS) to cover field staff involved in sales, CSCs, exchanges and mobile operations Individual PMS (IPMS) for officers (DGM level & above) to be gradually introduced 2 Group Performance Management System (GPMS) Covers all BSNL employees in 19 group types Each Territorial Circle, non-Territorial Circle, SSA is a Group Key Performance Indicator(KPI) based score cards designed for objective and transparent assessment of performance Group score cards have been finalized with targets assigned for all groups for this year GPMS is aimed at rewarding everyone in the group based on overall Group’s performance GPMS score to form the basis of PRP, other financial incentives 3 As part of GPMS design, all BSNL employees have been structured along 19 groups Number of group types Number of groups 1. Consumer Fixed Access 2. Consumer Mobility 3. Enterprise 4. New businesses 5. Corporate Affairs 6. HR (Incl. Legal and Vigilance) 7. Finance Sub-total Territorial Circle Sub-total 1. Project Circle 2. Maintenance Region 3. Inspections (earlier T&D) 4. QA 5. Telecom Stores 6. Telecom Factory 7. ITPC 8. NCES 9. Data N/W 10. Training Circle Sub-total SSAs 1 1 1 1 1 1 1 7 1 1 1 1 1 1 1 1 1 1 1 1 10 1 1 1 1 1 1 1 1 7 26 26 5 4 1 1 1 3 1 1 1 3 21 330 Total 19 384 Category of groups Corporate office Territorial circles Non Territorial Circles SSA Group Type 4 Organisation redesign Metrics for appraisal and scoring are drawn from various dimensions to give a fair appraisal Key performance indicators 1 The appropriate mix of KPIs will depend on the role and on the importance of each perspective Financial What impact can this person have, in terms of financial measures? Objective 2 Customer / Market Measure Target Weighting 1 How can this person maximize customer satisfaction? 2 3 3 Operations / Processes What are the operations / processes relevant to this person that most drive performance? Weighting and mix 4 5 6 4 Employee development What can this person do to most actively facilitate the development of others? There should be no more than 5–7 objectives in total; more could result in lack of focus, potentially undesirable trade-offs, and reduced performance 5 KPIs Design Parameters • Source of Inputs Criteria for KPIs definition GPMS SCORE Card MOU Between DOT and BSNL for year 2010-11 Weighting Factors JD and KRAs defined as part of organization Design. Interaction with individual Groups Previous BBS parameters Definition& Formulas Strategic Measurable Target Can be set Source of information Target setting mechanism 6 SAMPLE GPMS SCORE CARDS Score Cards for Corporate Office Units Circles SSAs 7 Consumer Fixed Access Group Performance Management System (GPMS) score-card Consumer Fixed Access Targets and Scores Key Performance Indicators Key Performance Indicators (KPI) Weighting Annual Target factor Performance levels1 Good V.Good 5110.80 6814.40 8518 4084 Targets achieved Marks achieved Weighted score xxx xxx xxx Excellent Financial 1. 2. CFA Revenue - Basic (LL, PCO, VAS, etc.) (Rs. Cr.) CFA Revenue - Broadband (including VAS, IPTV) (Rs. Cr.) 20% 8518 20% 4084 2450.40 3267.20 5% -1500 -2160 -1830 -1500 7.5% 3500 2100 2800 3500 5 1200 Customer/Market 3. Net adds (by number of subscribers) - Basic (in 000's) 4. Net adds (by number of subscribers) - Broadband (in 000's) 5. Customer satisfaction level (including QoS) (Scale of 1 to 5) 7.5% 5 3 4 2.5% 1200 720 960 5% 305 270 290 305 66.10 Operations 6. Net adds in Tax capacity (in KC) 7. CDR implementation (No. of SSAs) 8. CCR rate for Landline –local 2.5% 66.10 58.00 63 9. CCR rate for Landline – STD 2.5% 51 45 49 51 10. Fault rate (LL) 2.5% 5.3 7 6 5.3 11. Fault rate (BB) 2.5% 5 6 5.4 5 90 12. % of faults cleared by next working day (LL) 2.5% 90 85 88 13. % of faults cleared by next working day ( Broadband) 2.5% 90 83 87 90 14. % of new services (LL) provisioned within the norm (7 days) 2.5% 97 90 94 97 5% 100 90 96 100 16. Overall performance (on scale of 1 to 5 - to be assessed by CMD) 10% 5 3 4 5 Total 10% 15. % of new services (BB) provisioned within the norm (7 days)(Subject to technical pheasibility) Overall performance 1. Marks for Good rating = 60, Very good = 80, Excellent = 100. Marks achieved for rating below Good = 0. Achievement between Good and Very good and between Very good and Excellent would be linearly scaled Note: Financial parameters of budget adherence on capex and opex and EBITDA to be added when BU level financial statements are available 8 Consumer Mobility Group Performance Management System (GPMS) scorecard Consumer Mobility Key Performance Indicators Key Performance Indicators (KPI) Targets and Scores Weighting factor Annual Target V.Good Good Financial 1. Revenue GSM (Rs Cr) 20% 2. Revenue GSM (VAS)(Rs Cr) 10% 3. Revenue EVDO (Rs Cr) 2.5% 4. Revenue WLL (Rs Cr) 2.5% 5. Revenue Wi- Max (Rs Cr) 5% Customer/Market 6. Net adds (by number of subscribers) (GSM - 2G) (in 000's) 5% 7. Net adds (by number of subscribers) (GSM - 3G) (in 000's) 3% 8. Net adds (by number of subscribers) (Data Card-3G) (in 000's) 2% 9. Net adds (by number of subscribers) (CDMA) (in 000's) 2% 10 Net adds (by number of subscribers) (Data Card - EVDO) (in 2% 000's) 11. Wi-MAX Net adds (By nimbers ) (in 000’s) 1% 12. Customer satisfaction level (including QoS) (Scale of 1 to 5) 5% 13. % of call centre complaints resolved within 24 hours 5% Operations 14. Call drop rate (%) 5% 15. BTS availability (%) 5% 16. Blocked call rate - TCH congestion (%) 5% 17. Call handover success rate (%) 5% 18. Call set-up success rate (%) 5% Overall performance 19. Overall performance (on scale of 1 to 5 - to be assessed by CMD) 10% Total 100% 16964 3200 148 1130 395 Targets achieved Performance levels1 Excellent 10178.4 13571.2 2560 1920 118.4 88.8 904 678 316.8 237.6 16964 3200 148 1130 395 17000 3000 200 1500 157 10200 1800 120 900 94.2 13600 2400 160 1200 125.6 17000 3000 200 1500 157 1035 5 70 621 3 63 828 4 67 1035 5 70 2.2% 2.5% 97% 96% 2.2% 2.5% 94% 94.50% 95% 94% 2% 98% 2% 95% 96% 4 5 2% 98% 2% 95% 96% 5 3 Marks Weighted achieved score xxx xxx 1. Marks for Good rating = 60, Very good = 80, Excellent = 100. Marks achieved for rating below Good = 0. Achievement between Good and Very good and between Very good and Excellent would be linearly scaled Note: Financial parameters of budget adherence on capex and opex and EBITDA to be added when BU level financial statements are available xxx 9 Enterprise Group Performance Management System (GPMS) scorecard Enterprise Key Performance Indicators Key Performance Indicators (KPI) Targets and Scores Weighting factor Annual Target Performance levels1 Good Financial 1. Revenue from leased circuits and managed services (Rs. Cr.) 2. Wholesale revenue from other carriers and service providers, i.e. bulk deals (e.g. ILD, NLD) (Rs. Cr) 3. Revenue from enterprise customers from all other voice and data offerings (e.g. PRI, mobile CUG, EPABX, leased internet, bulk broadband, data cards) (Rs. Cr.) Customer/Market 4. Number of new Platinum accounts penetrated (minimum business of Rs 40 lakhs per account p.a.) 5. Number of new Gold accounts penetrated (minimum business of Rs 10 lakhs per account p.a.) 6. Customer satisfaction level (including QoS) (Scale of 1 to 5) Operations 7. Average time taken to provision leased circuits (days) 8. MPLS Network uptime (including edge routers) (%) 9. Average restoration time for OFC and systems by regions (hours) 10.% ILD bandwidth commissioned vis-à-vis planned 11.% OFC route km commissioned vis-à-vis planned 12.% OFC system km commissioned vis-à-vis planned Overall performance 13.Overall performance (on scale of 1 to 5 - to be assessed by CMD) Total 40%2 - 1950 - Marks Weighted achieved score V.Good Excellent 1463 - 1716 - - - 1950 5% 72 56 64 72 5% 230 157 187 230 10% 5 3 4 5 5% 5% 5% 5% 5% 5% 30 100% 8 100% 95% 98% 45 60 99.50% 99% 10 12 80% 60% 80% 70% 85% 75% 30 100% 8 100% 95% 98% 10% 100% 5 4 5 3 Targets achieved xxx xxx xxx 1.Marks for Good rating = 60, Very good = 80, Excellent = 100. Marks achieved for rating below Good = 0. Achievement between Good and Very good and between Very good and Excellent would be linearly scaled 2. The performance of Financial KPI no. 2 & 3 cannot be measured at present, hence no targets are being given for them and weightage of KPI 1 has been increased to 40% Note: Financial parameters of budget adherence on capex and opex and EBITDA to be added when BU level financial statements are available 10 Note: SLA related metric to be introduced in Operations once SLAs are established and enforced as standard practice, and when SLA violations are tracked in MIS New Businesses Group Performance Management System (GPMS) scorecard New Businesses Key Performance Indicators Key Performance Indicators (KPI) Targets and Scores Weighting factor Annual Target Performance levels1 Good Infrastructure 1. Infrastructure business revenue and savings (Rs. Cr.) 2. Number of towers shared with other operators 3. Timely commissioning of USO towers (%actual vs. planned) International Business 4. Total transaction value (revenue) from international business deals (minimum value of each business deal Rs. 1 Cr.) 5. Number of international business proposals taken to offer or negotiation stage Civil Electrical Architecture USO 6. Business earned from External Works during the course of year (Rs. Cr.) 7. Electricity bill saving during the course of the year (in Rs Cr.) 8. Effective management of Architectural Services for BSNL-HQ, Territorial Circles, Telecom Factories & Training Centres (incl. building design, interior design, design standardization, cost reduction, new technologies, energy conservation, etc.) (on scale of 1 to 5 – to be assessed by Circle Heads and BU heads) 9. Timely roll-out of USO towers (%actual vs. planned) Telegraph Services 10 Rationalization / closure and modernization (e.g. conversion to CSCs) of Telegraph infrastructure and systems (esp. low traffic or loss making units), and redeployment of manpower for gainful utilization (on scale of 1 to 5 – to be assessed by BU Heads and Territorial Circle Heads) Telecom Factory (HO) 11. Timely and effective management of Telecom Factory related afGoods (allocation of items to circles, planning and coordination of production, etc.) (on scale of 1 to 5 – to be assessed by Territorial circle Heads, Project circle heads, Maintenance region heads and BU heads) Overall performance 12. Overall performance (on scale of 1 to 5 - to be assessed by CMD) Total 1. V.Good 10% 20% 5% 250 11000 100% 150 6600 60% 200 8800 80% 10% 5 3 4 3 4 5% 7.5% 5 5% 600 75 360 45 5% 5 3 5% 100% 60% 5% 10% 10% 100% 5 Targets achieved Marks achieved Weighted score xxx xxx xxx Excellent 250 11000 100% 5 5 480 60 4 600 75 5 80% 100% 4 5 3 5 3 4 5 5 3 4 5 Marks for Good rating = 60, Very good = 80, Excellent = 100. Marks achieved for rating below Good = 0. Achievement between Good and Very good and between Very good and Excellent would be linearly scaled Note: Financial parameters of budget adherence on capex and opex and EBITDA to be added when BU level financial statements are available. Additional revenue KPIs to be added when applicable. 11 * Figure modified as per 100 days target, (for GPMS) Corporate AfGoods Group Performance Management System (GPMS) scorecard Corporate Affairs Key Performance Indicators Key Performance Indicators (KPI) Targets and Scores Weighting factor Target Good Corporate IT 1. % of ERP modules for which blueprint document preparation completed (target is to complete for 10 modules by March 31st, 2010) 2. Availability of critical IT systems at the Corporate Office, e.g. LAN, WAN, corporate email etc. (%) Planning & Monitoring 3. % of reports and MIS completed or published in time 4. Number of EoIs floated based on planning for forward looking communication technologies (actual vs. planned) Coordination 5. Timely monitoring or review of performance against business plan and publishing of reports and MIS (actual vs. planned) 6. % of Right to Information requests and Public Grievances cases cleared or answered within the prescribed time frame as per the norms Materials Management 7. Number of tenders finalized vis-à-vis total number of tenders planned + requisitioned (%) 8. % of tenders finalized within the standard time (120 days between requisition from BU and tender finalization for single stage bid and 180 days for two stage bid) 9. Inspection and followup of Nodes (Exchange Nodes, Broadband Nodes, GSM BTS, WLL BTS) Regulation 10. Timely and effective monitoring of compliance with TRAI regulations in all BSNL processes incl. tariff, license fees, spectrum etc. (on scale of 1 to 5 – to be assessed by Territorial Circle Heads) 11. Timely signing of interconnect agreements with other operators including review and amendment thereof (within 30 days) Marketing 12. Number of marketing campaigns executed vis-à-vis requisitioned (%) 13. Quality of marketing initiatives (brand strength, customer awareness of BSNL offerings, satisfaction levels etc.) (on scale of 1 to 5) Overall performance 14. Overall performance (on scale of 1 to 5 - to be assessed by CMD) Total Targets achieved Performance levels1 Marks achieved Weighted score xxx xxx Excellent V.Good 15% 100% 60% 80% 100% xxx 5% 100% 80% 90% 100% 5% 5% In time 2 Delay 2 Wk Delay 1 Wk 5% 1 1 In time 2 90% 80% 85% 90% 5% 90% 80% 85% 90% 5% 90% 50% 70% 90% 5% 70% 40% 50% 70% 10% 5000 3000 4000 5000 5% 5 3 4 5 10% 50% 30% 40% 50% 5% 80% 60% 70% 80% 10% 5 3 4 5 10% 100% 5 3 4 5 1. Marks for Good rating = 60, Very good = 80, Excellent = 100. Marks achieved for rating below Good = 0. Achievement between Good and Very good and between Very good and Excellent would be linearly scaled 12 Human Resources Group Performance Management System (GPMS) scorecard Human Resources Targets and Scores Key Performance Indicators Key Performance Indicators (KPI) Weighting factor Good Manpower planning and Recruitment 1. Effectiveness of manpower planning for executives (incl. equalization 5% or balancing of manpower amongst circles, excluding tenure circles) 2. Number of executives (DGMs, MTs, JTOs) recruited during the course 5% of the year vis-à-vis planned (%) (actual vs. planned) Promotion 3. Number of personnel promoted during the course of the year vis-à-vis 10% planned (%) (actual vs. planned) Transfers 4. Timely compliance of transfers and postings orders for executives (% 10% of transfer and posting orders executed within 45 days from date of issue) Timely completion of ACRs 10% 5. % of ACRs for corporate office completed by the required date Training 15% 6. Total number of persons trained as a percentage of total number of people in the organization (yearly MoU target) 5% 7. % of courses conducted having quality rating more than 85% by the trainees GPMS 8. Timely creation of Corporate Office , Circle office and SSA GPMS 2.5% Scorecard for 2010-11. 9. Timely mid term evaluation of BSNL CO and Circle GPMS Scorecard for 2.5% year 2010-11 FPMS 10. Timely finalisation of FPMS Scheme along with all cards 2.5% 11. Implementation of FPMS scheme in all Circles. 2.5% Staff Relation 12. Quality of Staff relations - % of mandays out of total mandays lost due to union disputes 10% Establishment 5% 13.. % of Court cases processed 5% 14. % of National Council decisions followed up as per agreed terms Overall performance 10% 15. Overall performance (on scale of 1 to 5 - to be assessed by CMD) 100% Total Marks Weighted Targets score achieved achieved Performance levels1 Target V.Good Excellent 10% 30% 20% 10% 80% 60% 70% 80% 80% 60% 70% 80% 90% 70% 80% 90% 100% 80% 90% 100% 25% 21% 23% 25% 75% 55% 65% 75% xxx 30-Jun-10 >30 Days >15 days 30-Jun-10 15-Nov-10 >30 Days >15 days 15-Nov-10 20-Apr-10 100% >30 Days >15 days 90% 95% 20-Apr-10 100% 1% 3% 2% 100% 90% 80% 70% 90% 80% 5 3 4 xxx xxx 1% 100% 90% 5 1. Marks for Good rating = 60, Very good = 80, Excellent = 100. Marks achieved for rating below Good = 0. Achievement between Good and Very good and between Very good and 13 Finance Group Performance Management System (GPMS) scorecard Finance Key Performance Indicators Key Performance Indicators (KPI) Targets and Scores Weighting factor Target V.Good Excellent Good Budgeting and Financial control 1. Timely monitoring and communication to circles (e.g. quarterly) regarding adherence on capex and opex budget (actual vs. planned) 2. Timely creation, communication and review of financial plan and budget for BSNL across all circles (actual vs. planned) Corporate Accounts 3. Timely closing of annual and quarterly accounts for BSNL and conducting external audit (actual vs. planned) Investments 4. ROI of BSNL's funds management activities (banking, treasury etc) Taxation 5. Timely filing of statutory and regulatory returns (% actual vs. planned) 6. Effectiveness and efficiency of settlement of tax related legal cases against BSNL (at COD level) (actual vs. target) Revenue Assurance 7. Planning and implementation of Revenue assurance policy, process and guidelines (on scale of 1 to 5 – to be assessed by BU Heads) Transfer Pricing 8. Effectiveness of Transfer Pricing policies and guidelines incl cost, pricing and taxation issues, based on proposals of transfer pricing from respective BUs for various services (on scale of 1 to 5 – to be assessed by BU Heads) Procurement Finance 9. Ratio of number of cases in which financial evaluation or financial appraisal / advice not accepted by approving authority to total number of cases for which appraisal / evaluation is carried out (%) Internal Audit 10. % of Circles, SSAs, non-territorial circles and units of Corporate Office for which internal audit (both proprietary and regulatory) conducted (actual vs. planned) Finance Personnel 11. Effectiveness of managing HR related issues for Finance cadre (incl. training, promotions, manpower planning etc.) (on scale of 1 to 5 - to be assessed by Finance Heads at Territorial Circles) Overall performance 12. Overall performance (on scale of 1 to 5 – to be assessed by CMD) Total 5% 15 days from finalisation of Quarterly Accounts 5% RE compilation by 15th October, BE by 28th Feb Targets Marks Weighted achieved achieved score Performance levels1 30 days 21 days 15 days xxx 15 days 7 days Within time 10% Adoption of annual accts by 15 days Board by 30th June 7 days Within time 10% Avg ROI for the year-4.5% 10% Filing IT Ret. by 30thSep Submit cases to COD in 45 5% days from rec. from Circles 1% 4% 4.50% 30 days 15 days 15 days 7 days within time within time 3 4 5 3 4 5 10% less than 5 % 15% 10% 5% 10% 100% 75% 90% 100% 5% 5 3 4 5 10% 5 100% 3 4 5 10% 5 10% 5 xxx 1. Marks for Good rating = 60, Very good = 80, Excellent = 100. Marks achieved for rating below Good = 0. Achievement between Good and Very good and between Very good and Excellent would be linearly scaled xxx 14 Group Performance Management System (GPMS) scorecard Territorial Circle Group Group level weightage S. No. 1 2 3 4 5 Consumer Fixed Access 25% 6 7 8 9 10 11 12 13 14 15 16 17 18 19 Consumer Mobility 30% 20 21 22 23 24 Dimension KPI Financial Financial CFA Revenue - Basic (LL, PCO, VAS, etc.) (Rs. Cr.) CFA Revenue - Broadband (including VAS, IPTV) (Rs. Cr.) Customer / Market Customer / Market Customer / Market Operations Operations Operations Operations Operations Operations Operations Operations Operations Net adds - (by number of subscribers) Basic (in 000's) Operations Operations % of new services (BB) provisioned within the norm (7 days of BB) [subject to technical feasibility] Overall performance (on scale of 1 to 5 - to be assessed by Director - CFA) Financial Weig Target htage 20% 20% Target Marks Weighted Achieved Achieved Score Performance Levels1 692.48 393.00 Good V.Good Excellent 415.49 553.98 692.48 235.80 314.40 393.00 -118.67 -170.88 -144.78 -118.67 350 210 280 350 7.5% 5 3 4 5 2.5% 5.0% 2.5% 2.5% 2.5% 2.5% 2.50% 2.50% 212 21 69.8 54 4.2 5% 90% 100% 99% 127 12 60.0 46 7.5 6% 85% 90% 90% 170 17 65.0 51 5.5 5.4% 88% 97% 95% 212 21 69.8 54 4.2 5% 90% 100% 99% 100% 90% 96% 100% 10% 5 3 4 5 CM revenue (Rs. Cr.) 40% 1458.83 1312.95 1385.89 1458.83 Customer / Market Customer / Market Customer / Market Operations CM Net adds - GSM (by number of subscribers) (in 000's) 13% 2497.00 2247.30 2372.15 2497.00 CM Net adds - CDMA (by number of subscribers) (in 000's) 2% 70 63 66.5 70 CM Net adds - WiMAX (by number of subscribers) (in 000's) 5% 80.80 48.48 64.64 80.80 BTS availability (%) 10% 98% 96% 97% 98% Operations Call drop rate (%) 10% 2% 2.5% 2.2% 2% Operations Blocked call rate - TCH congestion (%) 10% 2% 2.5% 2.2% 2% Operations Overall performance (on scale of 1 to 5 - to be assessed by Director - CM) 10% 5 3 4 5 Net adds - (by number of subscribers) Broadband (in 000's) Customer satisfaction level (including QoS) (Scale of 1 to 5) Net adds in tax capacity(in KC) CDR Implementation (No. of SSAs) CCR rate for Landline local CCR rate for Landline STD Fault rate LL Fault rate BB % of faults cleared by next working day LL % of faults cleared by next working day BB % of new services (LL) provisioned within the norm (7 days for LL) 5% 7.5% 2.50% 5.00% 15 Group Performance Management System (GPMS) scorecard Territorial Circle Financial Enterprise BU revenue (Rs. Cr.) 40% 156.86 117.65 138.04 156.86 Customer / Market Number of new Enterprise Gold accounts penetrated 20% 20 14 17 20 Operations MLLN / MPLS network uptime (%) 15% 98% 96% 97% 98% Operations Average provisioning time for leased circuits(no. of days) 15% 30 90 60 30 Operations Overall performance (on scale of 1 to 5 - to be assessed by Director - Enterprise) 10% 5 3 4 5 Financial New Businesses revenue (Rs. Cr.) 15% 17 8.5 12.75 17 Financial Budget adherence on opex (% actual spend vs. budgeted) (on items excluding those in schedule P) 15% 100% 115% 105% 100% Financial Operating ratio (%) 15% 58% 75% 68% 58% Financial Overall assessment on Finance related issues, including budget adherence, financial planning, accounting, revenue assurance etc. (on scale of 1 to 5 - to be assessed by DirFinance) 15% 5 3 4 5 34 Customer / Market Customer satisfaction level (including QoS) (Scale of 1 to 5) 20% 5 3 4 5 Employee development Overall assessment on HR related issues, including training, recruiting, promotion, transfers etc. (on scale of 1 to 5 - to be assessed by Dir-HR) 20% 5 3 4 5 35 Overall performance (on scale of 1 to 5 - to be assessed by CMD) 100% 5 3 4 5 25 26 Enterpris e 15% 27 28 29 30 31 32 Other Overall performa nce 20% 10% 33 36 Overall assessment 1. Marks for Good rating = 60, Very Good = 80, Excellent = 100. Marks achieved for rating below Good = 0. Achievement between Good and Very Good and between Very Good and Excellent would be linearly scaled CFA - CO Nodal designate: Mr. Tarun Kumar (GM, BP - CFA) CM - CO Nodal designate: Mr. B.N. Mishra (GM, Product & Pricing) Enterprise - CO Nodal designate: Mr. S. K. Seth (GM, Business Planning) New Businesses - CO Nodal designate: Mr. R. P. Nigam (Sr.GM, TF - NB) HR - CO Nodal designate: Mr. Neeraj Verma (GM, Training) Finance - CO Nodal designate: Mr. K. R. Tiwari (GM, Transfer Pricing, Revenue Assurance & Finance Personnel) Note: i) Assessment by CMD and all directors of the BSNL board will be based on qualitative measures defined for the parameters 16 Group Performance Management System (GPMS) scorecard SSA Group Group level S. No. weighta ge Dimension KPI Target Weight Marks Weighta Target Performance Levels1 Achieve ed Achieved ge d Score Good Consumer Fixed Access Consumer Mobility 25% 30% 1 Financial CFA Revenue - Basic (LL, PCO, VAS, etc.) (Rs. Cr.) 20% 2 Financial CFA Revenue - Broadband (including VAS, IPTV) (Rs. Cr.) 20% 3 Customer / Market Net adds - (by number of subscribers) Basic (in 000's) 5% 4 Customer / Market Net adds - (by number of subscribers) Broadband 10% 5 Customer / Market 6 7 Operations Productivity of Sales Associates of SSA in number of connections/Active SA per month CCR rate for Landline local 2.5% Operations CCR rate for Landline STD 2.5% 8 Operations Fault rate LL 2.5% 2.5% Very Excelle Good nt 5% 9 Operations Fault rate BB 10 Operations % of faults cleared by next working day LL 5% 11 Operations % of faults cleared by next working day BB 5% 12 13 Operations Operations % of new services (LL, BB) provisioned within the norm (7 days for LL, 7days for BB) Timely implementation of CDR project (actual vs. planned) 10% 5% 14 Operations Overall performance (on scale of 1 to 5 - to be assessed by Circle Head) 5% 15 Financial CM revenue (Rs. Cr.) 40% 16 Customer / Market CM Net adds - GSM (by number of subscribers) (in 000's) 15% 17 Customer / Market CM Net adds - CDMA (by number of subscribers) (in 000's) 5% 18 Customer / Market 5% 19 Customer / Market 20 Customer / Market 21 Operations CM Net adds - Wi-Max (by number of subscribers) (in 000's) % of Non BSNL Retailers converted in to BSNL Retailers vis-à-vis number of retailers serveyed in SSA. True reflection of secondary sale of SIMs in sanchar soft ,for SIM selling and recharge selling retailers. BTS availability (%) 20% 22 Operations Overall performance (on scale of 1 to 5 - to be assessed by Circle Head) 5% 5% 5% 17 Group Performance Management System (GPMS) scorecard SSA 23 Enterprise BU revenue (Rs. Cr.) 40% Number of new Enterprise Gold accounts penetrated 20% 25 Financial Customer / Market Operations MLLN / MPLS network uptime (%) 15% 26 Operations Average provisioning time (no. of days) 15% 27 Operations Overall performance (on scale of 1 to 5 - to be assessed by Circle Head) 10% 28 Financial New Businesses revenue (Rs. Cr.) 20% 29 Financial Budget adherence on opex (% actual spend vs. budgeted) (on items excluding those in schedule P) 15% 30 Financial Overall assessment on Finance related issues, including budget adherence, financial planning, accounting, revenue assurance etc. (on scale of 1 to 5 - to be assessed by Circle Head) 20% 31 Customer / Market Customer satisfaction level (including QoS) (Scale of 1 to 5) 20% 32 Performance mangement %Implementation of Field Performance Management system on time 10% 33 Employee development Overall assessment on HR related issues, including training, recruiting, promotion, transfers etc. (on scale of 1 to 5 - to be assessed by Circle Head) 15% 34 Overall assessment Overall performance (on scale of 1 to 5 - to be assessed by Circle Head) 100% 24 Enterprise Other 15% 20% Overall 10% performance 1. Marks for Good rating = 60, Very Good = 80, Excellent = 100. Marks achieved for rating below Good = 0. Achievement between Good and Very Good and between Very Good and Excellent would be linearly scaled Note: Targets would be set by nodal designate at circle office under the guidance of respective functional heads and the CGM. The nodal designates at SSAs are required to coordinate with the respective circle office nodal designates for any clarifications/further alignment as per the direction of SSA head. 18 Explanation of target and performance level for a positive parameter - Revenue Marks achieved for revenue of a group between 0 and 400 Cr. 100 marks Marks achieved 100 marks 80 marks 100 60 marks 80 60 40 0 marks 20 0 0 50 100 150 200 250 300 350 400 Revenue (Rs. Cr.) Illustration of defining performance levels Target 300 Performance levels Illustration of marks vis-à-vis achievement Target Achieved 60 80 100 100 150 300 50 100 140 200 300 350 Marks Achieved 0 60 76 86.7 100 100 19 Explanation of target and performance level for a negative parameter – Average restoration time Marks achieved for average restoration time of a group between 8 and 16 hrs 100 marks Marks achieved 80 marks 100 60 marks 80 100 marks 60 40 0 marks 20 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Average restoration time (hrs) Illustration of defining performance levels Target Performance levels 60 8 16 80 12 Illustration of marks vis-à-vis achievement Target Achieved 100 8 20 16 14 12 8 6 Marks Achieved 0 60 70 80 100 100 20 Organisation redesign LINKAGES TO PMS GPMS is presently proposed to be linked to PRP, PLI Non – Financial Awards- Trophies, Certificates in FPMS Important to link PMS to Transfers Promotions Training / Travel opportunities Performance management system can be a key HR tool Financial incentives • Bonus scheme • Variable compensation • Other benefits Career management • Promotion policy • Transfers Non-financial rewards Performance Management System • Top-performer program • Material rewards / perks • Training / travel opportunities Recognition • Feedback • Formal recognition in company / other forums Source: BCG analysis 21 Linkage of GPMS to PRP DPE Guidelines How can PRP be worked out? 22 Organisation redesign GPMS could potentially be the basis for PRP Incentive payout pool available will be based on the company's financial performance DPE guidelines for PRP (Performance Related Pay) Contributes to 60% of payout pool A Profit before Tax (PBT) for current year X 3% Total payout pool available + B Incremental PBT (Current – Previous) (cannot exceed 5% of current year PBT) X 10% Contributes to 40% of payout pool (ceiling 2% PBT) 1. Ceiling of 2% of current year PBT Source: Department of Public Enterprise (DPE) guidelines 23 Organisation redesign Individual payout to be based on a combination of factors PRP calculations A PRP from current year profit 1 2 PRP split Base Salary (Rs.) Total 4 MoU rating1 Performance rating 5 Base salary of the individual X Company MoU rating X Individu al's Perform ance rating 40% Based on DPE guidelines 6 Prorating factor Grade level 60% X B PRP from incremental profit 3 X PRP ceiling for each grade level as per DPE guidelines X Scaling factor based on available payout pool2 Payout (Rs.) To be calculated from current and previous year PBT Based on GPMS scorecard rating 1. PRP eligibility based on MoU rating as per DPE guidelines: Excellent (100%), Very Good (80%), Good (60%), Fair (40%), Poor (0%). 2. Example: if available payout pool is Rs. 30 Cr. and total possible payout is Rs. 40 Cr., pro-rating factor is 30/40 = 0.75 Source: Department of Public Enterprise (DPE) guidelines 24 Organisation redesign Groups within a category will have a 'bell-curve' distribution based on performance Distribution of Groups based on performance Group category Total no. of units Excellent (15%) V. Good (20%) Good (25%) Fair (30%) Below Par (10%) Corporate Office 7 1 1 2 2 1 Territorial Circles 26 4 5 6 8 3 Non territorial circles 21 3 4 5 7 2 SSA 330 50 66 82 99 33 Total 384 58 76 95 116 39 25 Organisation redesign Performance rating and distribution of employees across ratings feeds into incentive payout calculations % employees falling under different ratings (bell curve distribution1 ) Rating % employees PRP eligibility for different ratings Rating based on scorecard assessment PRP eligibility Excellent 15% Excellent 100% Very Good 20% Very Good 75% Good 25% Good 50% Fair 30% Fair 25% Below Par 10% Below Par 0% 4 Bell curve will be applied at the group level for Corporate Office, Territorial circles, Non-territorial circles, SSAs 1. DPE guidelines recommend following a "Bell curve approach" Source: Department of Public Enterprise (DPE) guidelines 26 Organisation redesign Example - Representative numbers only Individual payout to be based on a combination of factors Includes company rating, individual performance rating, grade level and payout pool available Current year PBT = 2000 cr., Previous year PBT = 1500 cr. 1 2 3 4 PRP calculations PRP split Base Salary (Rs.) MoU rating Performance rating1 Grade level PRP from current year profit 60% 5L Fair (40%) Good (50%) PRP from incremental profit 40% 5L Fair (40%) Good (50%) Total Based on DPE guidelines 5 6 Prorating factor Payout (Rs.) E-5 (50%) 0.90 27k E-5 (50%) 0.90 18k 45k 1. Individual performance rating to be initially based on Group Performance rating 27 FPMS FIELD PERFORMANCE MANAGEMENT SYSTEM 28 B Objectives for Field-level Performance Management System • KPI based mechanism for measuring & rewarding performance at the field level • 5 critical job families to start with • Consumer Mobility sales (retailer managers) • Consumer Fixed Access sales (sales associate) • CSC • Exchanges (PSTN & Broadband) – internal & external plant • SSA level consumer mobility ops team • Additional job families will be added over time • FPMS already launched 29 B Combination of individual and group based approach Job family / Group 1 Sales – Consumer Mobility (Retailer Manager) 2 Sales – Consumer Fixed Access 3 Customer Service Centre 4 Fixed Line & Broadband – Exchange Coverage at Group level / Individual level Organization coverage Performance to be recognized at individual level Sales roles Customer centric role Performance to be recognized at Group level Operational roles 5 SSA – Consumer Mobility Team Key Performance Indicators have been defined for measuring performance of Job families / Groups 30 Group based Awards in FPMS 1. For exchanges and CSCs, topper group one each in each category of exchange and CSC would be awarded in all SSAs. (Swarna CSC and Swarna Exchange in each category) 2. For consumer mobility operations teams, top 3 groups would be awarded in every circle. 3. The scheme for exchanges and CSCs would be driven at the SSA level and for the consumer mobility operations teams at the Circle level. The final decision on awards at SSA level should be made by the SSA Head after taking into account the KPI scores of all Exchanges and CSCs in the SSA. 4. The final decision on awards at the Circle level should be made by the PGM/GM (Consumer Mobility) after taking into the account the KPI scores of all SSAlevel Consumer Mobility Operations teams in the Circle. 5. The PMS team at the corporate office would be responsible for the overall coordination 31 Proposed Awards for CSCs Name of award Swarna CSC (One in each Category) Level Within SSA Type of Category Frequency Quarterly Type-I,II,and III Award for Award for individuals group in group Certificat Certificate e of Merit, with Rolling Trophy Basis for decision Highest score on KPIs for CSCs 32 Proposed Awards for Circle-level Consumer Mobility Operations teams Award for group Award for individuals in group Name of award Level Frequency Swarna padak Within Circle Quarterly Certificate of Merit ,with Rolling Trophy Certificate Highest score on KPIs for CM teams Rajat padak Within Circle Quarterly Certificate of Merit ,with Rolling Trophy Certificate 2nd Highest score on KPIs for CM teams Kansya padak Within Circle Quarterly Certificate of Merit ,with Rolling Trophy Certificate 3rd Highest score on KPIs for CM teams Basis for decision 33 Proposed Awards for Exchanges Name of award Level Swarna Within exchange( SSA One in each Category Type of Category Frequency Quarterly Cat-A,B,C,D Award for group Award for individuals in group Certificate Certificate of Merit, with Rolling Trophy Basis for decision Highest score on KPIs for exchanges 34 Customer Service Centres (CSCs) Field Performance Management System (FPMS) scorecard Customer Service Centres Targets and Scores Key Performance Indicators Key Performance Indicators (KPI) SubWeighting Weighting factor factor Efficiency of bill collection 1. Number of bills collected per day / Number of cash counters in the CSC 25% Sales leads generated per employee3 2. Number of sales leads generated / Number of employees in a CSC 15% Waiting time of customers in the queue 3. Waiting time in queue during the pay by due dates (based on survey feed back) Efficiency of Survey 4. % of survey form collected to total number of bills collected. 20% Customer feedback on qualitative aspects 30% 5. Average of rating given on a scale of 1 to 5 by customers. Customer survey to include factors including (but not limited to): i. Responsiveness of staff to customer requests – change of address, change of plans, disconnection, etc. ii. Knowledge of the people in the CSC about products and plans iii. Availability of tariff plans and information brochures in the CSC iv. Availability of products in the CSC v. Behavior and attitude of the staff vi. Cleanliness of the centre Total Target 302 Performance Fair Good xxx xxx levels1 Targets achieved Marks achieved xxx xxx Weighted score Excellent xxx xxx 152 < 5 min. 10% 5% 5% 5% 5% 5% 5% 100% 1. Marks for Fair rating = 60, Good = 80, Excellent = 100. Marks achieved for rating below Fair = 0. Achievement between Fair and Good and between Good and Excellent would be linearly scaled 2. Representative numbers only – targets to be fixed 3. For CSCs where lead generation is not feasible , 25% weightage will be divided as 10 %, 10 % and 5% amongst KPI 1,3 and 4 respectively. 35 Field Performance Management System (FPMS) scorecard ( Exchanges) Key Performance Indicators (KPI) Weighting factor Time to provision new service 1. % of new services (Land Line) provisioned within the norm (7 days for new LL) 5% 2. % of new services (LL, BB) provisioned within the norm (7 days for BB where 10% LL exists, 15 days for new LL + BB) Fault rate (%) 5% 3 Number of faults per 100 active connections (LL)(in %) 4 Number of faults per 100 active connections (BB)(in %) 10% Repeat fault rate (on same number) within 30 days 5. Number of faults on a number which has been repaired once (in the last 30 10% days) per 100 active connections- Land Line 6. Number of faults on a number which has been repaired once (in the last 30 10% days) per 100 active connections- Broad band Fault clearance turn-around time 10% 7. % of faults cleared within 24 hours(Land Line) 10% 8. % of faults cleared within 24 hours (Broad band) Time taken to service/execute requests 9. % requests for local shift of LL executed within 3 days 2% 10. % requests for local shift of BB executed within 3 days 3% 11. % requests for inter-exchange shift of LL executed within 5 days 2% 12. % requests for inter-exchange shift of BB executed within 5 days 3% 13 % requests for termination of connection executed within 7 days (LL) 2% 14. % requests for termination of connection executed within 7 days (BB) 3% Management of co-located BTSs 15. BTS availability (%) 10% 16. Number of faults/interruptions per BTS due to passive infrastructure failures in a 10% month (Average fault rate over a quarter/year will be taken) Total 100% Target Performance Fair Good xxx xxx levels1 Targets Marks Weighted score achieved achieved Excellent xxx xxx xxx xxx 1. Marks for Fair rating = 60, Good = 80, Excellent = 100. Marks achieved for rating below Fair = 0. Achievement between Fair and Good and between Good and Excellent would be linearly scaled Note: The data for the above will be obtained from MIS reports generated in DotSoft, other softwares installed in SSAs; 36 SSA Consumer Mobility Operations Team Field Performance Management System (FPMS) scorecard SSA consumer mobility operations team Key Performance Indicators Key Performance Indicators (KPI) BTS availability 1. BTS availability (%) - for sites where responsibility is with SSA CM team 2. BTS availability (%) - for sites where responsibility is with respective CFA teams at exchanges Fault rate 3. Number of faults per BTS due to passive infrastructure failures in a month (Average fault rate over a quarter/year will be taken) – for sites where responsibility is with SSA CM team Fault clearance turn-around time 4. % of faults cleared in 6 hours – for sites where responsibility is with SSA CM team BTS upkeep 5. Subjective assessment given by GM CMTS (O & M) at circle based on (but not limited to): (1) Earthing at BTS site (2) Installation and upkeep of lightning arrestor (3) Proper functioning of aviation light (4) Proper working of "tower up" beep (5) RF cable safety (6) Cleanliness of site Total Targets and Scores Weighting factor 35% Target Performance levels1 Fair Good xxx xxx Targets achieved Marks achieved xxx xxx Weighted score Excellent xxx xxx 15% 30% 10% 10% 100% 1. Marks for Fair rating = 60, Good = 80, Excellent = 100. Marks achieved for rating below Fair = 0. Achievement between Fair and Good and between Good and Excellent would be linearly scaled Note: The data for the above will be obtained from MIS reports generated in DotSoft, other softwares installed in SSAs 37 2 Individual based incentives in FPMS-Illustrative Key Performance Indicators for sales roles in Consumer Fixed Access 1. Sales achieved for Landline 2. Sales achieved for Broadband 3. Number of connections recovered 4. Sales achieved for EVDO or 3G cards or FWTs 38 1 Illustrative Key Performance Indicators for sales roles in Consumer Mobility 1. Sum of SIMs sold by franchisee whose area is being surveyed by the Retailer Manager 2. Sum of recharge value sold by franchisee whose area is being surveyed by the Retailer Manager 3. Number of retailers visited by the retailer manager 39 Individual PMS (IPMS) Being targeted for DGM level officers and above Gradually, the system to be expanded to other levels Requires complete IT support to handle PMS of this size PMS module being planned in ERP system Finally, an individual’s performance to be combination of GPMS and IPMS 40 End of Presentation 41