The Fives FCB sustainable cement plant FICEM APCAC – XXIX Congreso Técnico – Costa Rica - San José – 05/09/2012 Fives Driving Progress The Fives FCB sustainable plant in figures Less than 500 mg/Nm3 of NOx (equivalent NO2 dry @ 10%O2) at stack Up to 70% of AFR substitution at precalciner (on thermal load) Thanks to the combination of the Fives FCB precalciner & Fives Pillard burner Less than 80 kWh/t of cement High clinker substitution factor Thanks to the Fives FCB Horomill & Fives FCB TSVTM Zero water consumption Thanks to the combination of the Fives FCB Horomill & common filter FICEM APCAC – 05/09/2012 2 A combination of advanced proven technologies Low emissions High alternative fuels substitution Low power consumption High clinker substitution Zero water consumption The Fives FCB Zero-NOx Precalciner: an advanced technology The Concept: a real COMBUSTION CHAMBER Downward High-Performance Burner: • Creating a Hot Spot • For successful ignition & efficient combustion • Staged Combustion in reducing conditions • Zero-NOx Air • • • • and Meal injection: Through a ring without cycloning Creating a meal curtain Protection of lining Progressive and efficient mixing Low-NOx burner with central channel for ASF Distribution chamber Ring-shaped injection Direct flow Meal feed Designed to burn difficult solid fuels and a high rate of alternative solid fuels with Zero-NOx emission FICEM APCAC – 05/09/2012 4 The Fives FCB Zero-NOx Precalciner: an advanced technology Hot spot for complete burn-out Centered flame Protected lining FICEM APCAC – 05/09/2012 5 Combined with the Fives Pillard Precalciner burner A low-NOx high performance burner (in Hoang Mai/Vietnam cement plant) FICEM APCAC – 05/09/2012 6 The Fives FCB Zero-NOx Precalciner: a proven technology Hoang Mai (Vietnam) • • • 100% low volatile anthracite coal (< 8%) Ø 5.6 m – capacity 4,000 t/d Residence time: 4.5 seconds FICEM APCAC – 05/09/2012 Umm Bab (Qatar) Holcim-Apasco (Mexico) • • • • • • Natural gas Ø 5.2 m – capacity 5,000 t/d Residence time: 3 seconds 100% petcoke & ASF Ø 5.6 m – capacity 3,500 t/d Residence time: 5 seconds 7 The Fives FCB Horomill: an advanced technology FICEM APCAC – 05/09/2012 8 The Fives FCB Horomill: an advanced technology Simple concept Continuous adaptations Grinding layer centrifugation Control of grinding actions Control of material advance FICEM APCAC – 05/09/2012 9 Horomill®: a worldwide proven technology 2 2 2 2 3 3 2+4 1+2 2 2+2 Plants with both raw and cement grinding Cement grinding Twin cement grinding Raw grinding 56 HOROMILLS FICEM APCAC – 05/09/2012 Slag or mineral grinding Twin slag grinding Not erected More than 1.5 millions hours of operation 10 A combination of advanced proven technologies Low emissions High alternative fuels substitution Low power consumption High clinker substitution Zero water consumption The Fives FCB sustainable plant Low emissions mg/Nm³ HOURLY NOx EMISSIONS AT CHIMNEY STACK 550 Less than 500 mg/Nm3 NOx at preheater exhaust 500 450 400 350 300 250 200 … and less than 100 ppm CO with 100% petcoke 150 100 00:00 08:00 16:00 00:00 08:00 16:00 00:00 08:00 16:00 00:00 08:00 16:00 00:00 08:00 16:00 00:00 No need of SNCR system in most cases TOTAL NOx (mg/Nm³ @ 10% O2, dry fumes) on 15th to 19th October 2007 Cartago (Holcim Costa Rica) NOx Emissions hourly average in mg/Nm3 @ 10%O2 dry FICEM APCAC – 05/09/2012 12 A combination of advanced proven technologies Low emissions High alternative fuels substitution Low power consumption High clinker substitution Zero water consumption The Fives FCB sustainable plant High alternative fuels substitution ppm kg/h Cartago (Holcim Costa Rica) : up to 70% coarse ASF (thermal load) can be fed directly in the precalciner burner (ASF made of rubber, plastics and papers) FICEM APCAC – 05/09/2012 14 The Fives FCB sustainable plant High alternative fuels substitution Alternative Fuels Hermosillo (Holcim Apasco) A quick and efficient ignition A good burn-out & low CO 50% of shredded tyres (thermal load) FICEM APCAC – 05/09/2012 15 A combination of advanced proven technologies Low emissions High alternative fuels substitution Low power consumption High clinker substitution Zero water consumption The Fives FCB sustainable plant Low power consumption Horomill® 3800 Blaine Capacity Horomill ® Horomill ® TSV™ Elevator Fan Total CEM II/B-P 3 600 130 2 047 15,7 0,5 0,8 4,2 21,3 t/h kW kWh/t kWh/t kWh/t kWh/t kWh/t Ball Mill CEM II/B-P Blaine Capacity Ball mill Ball mill TSV™ Elevator Fan Total t/h kW kWh/t kWh/t kWh/t kWh/t kWh/t Savings kWh/t 3 800 121 3 600 29,8 0,3 0,4 3,3 33,7 12,4 37% Slag / CEM III/A/B 4 000 67 1 880 28,1 1,5 1,3 8,5 39,4 CEM I / CEM II/A-L 3000 / 3500 115 1 900 16,5 0,5 0,9 3,7 21,6 Slag / CEM III/A/B 4 000 53 3 600 67,9 0,6 0,8 6,3 75,7 CEM I / CEM II/A-L 3200 / 3700 115 3 600 31,3 0,2 0,4 2,6 34,5 36,3 48% 13,0 38% CEM I 4 000 72 1 880 26,1 1,5 1,3 6,7 35,5 CEM I 4 200 78 3 600 46,2 0,6 0,6 4,1 51,4 15,9 31% Large energy savings compared to the ball mill … FICEM APCAC – 05/09/2012 17 Horomill® : the lowest energy consumption Raw meal grinding Cement grinding 230 t/h - 12% R90µ 115 t/h CEM II A/P - 3900 Blaine ® ® Absorbed Power Vertical mill Horomill Vertical mill Horomill Mill 1 820 1 820 1 850 1 850 Separator 60 30 135 55 Elevator 30 160 30 105 Fan 1 880 770 930 450 Auxiliaries 60 50 60 50 Total abs. Power kW 3 850 2 830 3 005 2 510 Specific energy kWh/t 16.7 12.3 26.1 21.8 Savings (% ) -26.5% -16.5% … but also substantial energy savings compared with the vertical mill which can represent more than 1 MUSD in annual operation cost FICEM APCAC – 05/09/2012 18 The Fives FCB sustainable plant Low power consumption Example of cement plants fully equipped with Fives FCB Horomill Tepetzingo (Mexico): 2 lines with 1 Horomill® for raw grinding and 1 Horomill® for cement Cerritos (Mexico): 2 lines with 1 Horomill® for raw grinding and 2 Horomill® for cement Apazapan (Mexico):1 line with 1 Horomill® for raw grinding and 2 Horomill® for cement Typical cement produced: CEM I / CEM II-A/P @ 4200 Blaine Cement plant consumption: 80 kWh/ton of cement FICEM APCAC – 05/09/2012 19 A combination of advanced proven technologies Low emissions High alternative fuels substitution Low power consumption High clinker substitution Zero water consumption Ho ro m sit ill es CE M I CE M II CE / A-L M II CE / A-P M II / BCE P M II / BS CE M III/ A CE M III/ B CE M V/A Ra w me al Sla g Lim es ton e An hy dr ite Do lom ite The Fives FCB sustainable plant High clinker substitution: stability & flexibility Trino SMA Cimentas Darica Karsdorf Tepetzingo 3 & 4 Cizkovice Tepetzingo 1 & 2 RCC Denizli 3 & 4 Maxit Confidential 1 Confidential 2 Konya 2 1 1 3 7 2 2 1 1 3 1 1 1 1 7 2 4 2 2 1 1 1 1 1 1 2 1 the Horomill® installed at Lafarge Karsdorf (Germany) produces up to 7 different recipes FICEM APCAC – 05/09/2012 21 A combination of advanced proven technologies Low emissions High alternative fuels substitution Low power consumption High clinker substitution Zero water consumption The Fives FCB sustainable plant Zero water consumption: the Fives FCB common filter Example of zero water burning line equipped with Fives FCB common filter: Holcim Hermosillo Preheater downcomer without water injection Air/Air Heat exchanger Mixing chamber with dilution Common filter with PTFE bags HE cyclones Common stack Booster fan FICEM APCAC – 05/09/2012 23 The Fives FCB sustainable plant Zero water consumption: the Fives FCB Horomill Example of zero water cement grinding equipped with Fives FCB Horomill: Holcim Hermosillo No need of water for grinding Centrifugation of the layer procuring grinding stability No need of water thermal balance External recirculation with cooling in the classifier loop FICEM APCAC – 05/09/2012 24 The Fives FCB sustainable plant in figures Less than 500 mg/Nm3 of NOx (equivalent NO2 dry @ 10%O2) at stack Up to 70% of AFR substitution at precalciner (on thermal load) Thanks to the combination of the Fives FCB precalciner & Fives Pillard burner Less than 80 kWh/t of cement High clinker substitution factor Thanks to the Fives FCB Horomill & Fives FCB TSVTM Zero water consumption Thanks to the combination of the Fives FCB Horomill & common filter FICEM APCAC – 05/09/2012 25 Thank you for your attention