Grøn gas gennem metanisering Claus Friis Pedersen clfp@topsoe.dk Confidential Vehicle to grid (V2G) is the future! An integrated energy infrastructure CH4 + CO2 + 4H2 2CH4 + 2 H2O The right factors for biogas upgrading Livestock, Windturbine capacity and NG consumption per capita 2,50 2,00 1,50 Pigs Cattle Wind,kW NG MTOe 1,00 0,50 en ed K S. Sw or e a SA U e nc Fr a hi na C an y er m a G an ad C d la n Po ai n Sp nd ol la H D en m ar k 0,00 Haldor Topsøe group (2011) Catalyst and engineering for Turnover: DKK 4.4 billion Fertilizers Result: DKK 397 MM Refineries 2091 employees The environmental sector 250 employees in R&D Synthetic fuels Synthetic Natural Gas (SNG) - Xinjiang Qinghua Methanation Relative Cost Transport SNG in pipelines rather than coal on trucks 120% 100% 80% 60% 40% 20% 0% Xinjiang Qinghua Gasified biomass Biogas 50 PJ corresponding to >50% of the total Danish Natural gas consumption 5 PJ gasified biomass SNG plants are projected 0.1 PJ would be a large biogas methanation unit Fuel Cell and Electrolyser SOFC H2O H2 SOEC H2 H2O H2 + O2- → H2O + 2e- H2O + 2e- → H2 + O2- O2- O2- ½O2 + 2e- → O2- O2- → 2e- +½O2 ½O2 ½O2 Exergy Flows Biogas upgrade value proposition # 1 Biogas CH4 + 30-40% CO2 Biogas Upgrade BioGas CH4 40 PJ CO2 Electrolysis H2 Fuel synthesis ”Electro-gas” CH4, 27 PJ Biogas upgrade value proposition # 2 Spot prices 2011 1 0.8 kr/kWh 0.6 0.4 0.2 0 1 -0.2 -0.4 1001 2001 3001 4001 5001 6001 7001 8001 Pre studies Metan samfundet SOEC biogas upgrade The business case (w. 5% interest) Power Biogas Investment Operational cost Gas sale Heat sale 60 Mio DKK 50 2020 2035 100% Electrolysis 91% Electrolysis 40 Plant size: 30 75 mio Nm3 biogas/year 20 10 0 Expensis NG gas price Biogas price Expensis NG gas price Biogas price Pilot test at Foulum – 5 Nm3/h CH4 + CO2 + 4H2 2CH4 + 2 H2O Summary Electrolysis based biogas upgrade has the potential to: – Store electricity as fuel – Increase the biogas production The business case is interesting but many aspects are still uncertain A pilot scale field trial is planned for 2015