The Company:
 More than 12 years of experience in designing, planning and
construction of biogas power plants.
 Input of the first plants: organic waste (fats and flotates);
Weser-Ems region: intensive livestock farming
 Biogas-boom since amendment of
the EEG (law on renewable energy)
in 2004
 More than 250 biogas plants built
 Installed capacity over 140 MWel
The Company:
Headquarters :
biogas weser-ems GmbH & Co. KG
Zeppelinring 12-16
D-26169 Friesoythe
Branch office Großenhain
Carl-maria-von Weber-Allee 51
01558 Großenhain
Affiliates:
Biogaz-tech Spółka zo.o.
ul. Długa 44
63-200 Jarocin
Ies biogas Srl
Via T. Donadon, 4
I-33170 Pordenone - ITALY
bentec bioenergies SL
Calle Sant Josep, 14
17176 Sant Esteve d´en Bas (Girona) Spain
Energy For The Future
Biogas
 versatile source of renewable energy: providing electricity and heat
 reduction of harmful methane emissions
 CO2 neutrality
 environmentally friendly way of preserving resources
Biogas Flow Diagram
Planning and Project Development
Project
 Conception
 Quotation
 Financing Assistance
 Approval planning
Plant Construction
Building phase
 bwe installation teams set up the agitators, gas storage roofs
and pipelines
 Use of low maintenance and energy-efficient agitators
 Connection of the high performance CHP units with engines
upward of 190 kW
Technology
Biogas plant
 User friendly process control systems
 Control of individual plant components and documentation of the control
parameters
 Remote access to the control system
Natural Gas From Biogas
Biogas Preparation
 Often there are no possibilities to use the heat economically
 Upgrading of biogas to natural gas quality
 Transportation through the existing natural gas network
 Alternative use as fuel for vehicles
Heat use
Transportation of heat
 Increasing efficiency by utilizing surplus heat
 Use of district heating for nearby houses and stables
 Wide variety of possible consumers,
e.g. heat for drying plants (cereals or digestate)
 Arbitrary choice of temperature level (default at 85 °C)
Micro-Gas Distribution System
Transportation of biogas
 the CHP is placed next to the heat consumer
 transport of biogas to the CHP unit through a gas pipeline
 lower investment required compared to district heating
 more efficient use of thermal energy, no losses during transportation
Reference Plants
Naturgas Ardorf
Technical Parameters:
7
L
Year of construction:
2007
Power kWel: 1131 kW + 190 kW
Substrates:
Energy crops
Digester:
1 x Ø 23 m
Post-digester:
1 x Ø 23 m
Storage:
1 x Ø 28 m
Biogasanlagen Heinfelde (NawaRo)
Technical Parameters:
7
L
Year of construction: 2006
Power kWel:
835 kW
Substrates:
NawaRo
Digester:
2 x Ø 25 m
Post-digester: 1 x Ø 25 m
Storage:
1 x Ø 25 m
Biogasanlagen Heinfelde (Kofermente)
Technical Parameters:
7
L
Year of construction:
2006
Power kWel: 1064 kW + 500 kW
Substrates:
Organic Waste
Digester:
2 x Ø 25 m
Post-digester:
1 x Ø 25 m
Storage:
1 x Ø 30 m
Biogaspark Felgentreu
Technical Parameters:
7
L
Year of construction: 2007/08
Power kWel:
10 x 844 kW
Substrates:
NawaRo
Digester:
10 x Ø 23 m
Post-digester:
10 x Ø 23 m
Storage:
10 x Ø 26 m
Download