Transmission Distribution Interface bottlenecks and strategies for improved grid Stability By Engr. A.S.A Bada CEO (TCN) GRID INTERFACE BOTTLENECKS Major Causes include: • • • • • • • • Radial state of network Spatial network coverage Transformer Capacity Constraints Line Capacity Constraints Switchgear Conditions Grid indiscipline Distribution network Conditions Frequent trippings/Persistent faults STATE OF NETWORK • Radial State of network – Steps Taken: NIPP presently constructing the closing of the loop to Jos with a DC 330KV line • Spatial Network Coverage – Steps Taken: 26No. Lines and Substation projects awarded in 2010 and 18No. Lines and Substation projects to be awarded before the end of this year (4 New substations to be constructed in the North Eastern part and 5 New Substations in the NW ) Transformer Capacity Constraints Steps Taken: On-going Capacity Strengthening Projects Stations Added Capacity 1 Birnin Kebbi 330KV 150MVA 2 Kumbotso 330KV 150MVA 3 Ayede 330KV 150MVA 4 Onitsha 330KV 150MVA 5 Afam 330KV 150MVA 6 Kantagora 60MVA 7 Sokoto 60MVA 8 Birnin Kebbi 60MVA 9 Funtua 60MVA 10 Katsina 60MVA 11 Onitsha 40MVA ON-GOING CAPACITY STRENGTHENING PROJECTS...............Ctd 12 13 14 15 16 17 18 19 20 21 22 Stations Added Capacity Akure Ukpilla Amukpe Delta Ajaokuta New Haven Akwanga G.C.M. Hadejia Bauchi Akangba 30MVA 30MVA 30MVA 60MVA 60MVA 60MVA 40MVA 15MVA 60MVA 60MVA 60MVA ON-GOING CAPACITY STRENGTHENING PROJECTS...............Ctd • TCN expects delivery of Power Transformers from 1st quarter of 2012 –4No. 300MVA 330/132KV Transformers –5No. 150MVA 330/132KV Transformers –10No. 100MVA 132/33KV Transformers –10No. 60MVA 132/33KV Transformers LINE CAPACITY CONSTRAINTS Steps Taken: • Gombe – Yola 330kV line has been energized • 2nd Benin – Ajaokuta 330kV line has finally been rehabilitated • 3rd Benin –Onitsha DC 330kV line to be commissioned soon • Re-conductoring of weak and old lines (e.g Aba – Itu, Itu – Calabar , Afam – PH, Delta – Effurun, Ota - Papalanto) with higher thermal capacity conductors are in various stages. OUTCOME OF STRATEGY MEETINGS # Drop down Sub. By WBank Source Line 1 330/132KV Substation at Ogijo (Ikorodu) Egbin – IkejaWest 330KV Line 2 330/132KV Substation at Epe Omotosho – Aja Line 3 330/132KV Substation at New Kano Kaduna – Kano 330KV line 4 132/33KV Substation at Choba PH Omoku – PH Mains Line 5 132/33KV Substation at Awkunanu - Enugu New Haven – Orji Line 6 132/33KV Substation at Kaltugo Gombe – Yola Line URGENT CONCERNS •Too frequent 33KV trippings •Inadequate notification of expansion projects 33KV TRIPPINGS FOR NOV. WK 1 # DISTRIBUTION ZONES ABUJA 2 BENIN 3 EKO 4 ENUGU 5 IBADAN 6 IKEJA 7 JOS 8 KADUNA 9 KANO 10 PH 11 YOLA 1 TOTAL NUMBER OF TRIPPINGS TOTAL ENERGY Undelivered (MWH) 126 125 55 208 191 43 71 107 46 121 63 1,628.95 4,674.39 4,405.25 15,261.96 4,305.78 3,289.8 1,385.12 758.74 558.04 4,201.89 533.66 MITIGATION STRATIGIES FROM DISCO’s • Submission of accurate data on customer population and installed capacity (MVA) • De-loading of 33KV Feeders through network expansion • Explore use of lattice towers for long 33KV Lines • Due to inadequate generation power should be given to some feeders then transferred to the others over time RATHER THAN pro-lateral sharing of power on all the feeders at the same time MITIGATION STRATIGIES FROM DISCO’s • Adherence to operational instructions • Gradual phase out of wooden cross arms with fibre • Movement of load on designated under frequency relays should henceforth stop • Disciplinary actions should be meted out on erring staffs MITIGATION STRATIGIES FROM DISCO’s....... • Supervising operators should henceforth be alive to their responsibilities • Issuance of a circular from their respective CEO’s demanding strict adherence to operational instructions Further Key Transmission Grid Challenges • Due to urbanization and environmental issues, it is becoming increasing difficult to acquire Right- Of-Way for new lines • Increased power demand due to growth in industries and population • Vandalization of transmission lines • Adverse Weather Conditions • Poor power quality • Transmission grid upgrades cannot keep pace with power demand STRATEGIES - - - Work is on-going on grid expansion. Significant Investment is being made to effectively double existing capacity through the NIPP intervention Line trace issues (mitigation against frequent line trips) have been taken more seriously with focus on contracting companies with requisite tools to work on difficult terrains Frequency stability has been largely achieved with some units in Delta, Kainji and Egbin providing frequency support in form of reserve margins Deployment of FACTS facility at strategic node of the network (e.g Kano, Gombe) Work has commenced in deploying the Supergrid network 330KV GRID STRUCTURE AFTER COMPLETION OF ALL ON-GOING PROJECTS REPUBLIC OF CHAD 2015 : new Niamey NIGER SOKOTO Sokoto Katsina 132 kV 2015 : new YOBE Hadejia JIGAWA Birnin Kebbi BORNO Gusau KATSINA ZAMFARA Damaturu Potiskum 2015 : new Kano KEBBI Maiduguri KANO 2010 : new Zaria REPUBLIC OF BENIN KADUNA 2015 : 2nd Circuit 2015 : 3rd Circuit Bauchi 2 3 SHIRORO NIGER KAINJI BAUCHI Kaduna Jos Gombe ADAMAWA GOMBE 2 SAPELE P/ST. 2 KWARA 2010: new 2015 : new 4 JEBBA/TS Abuja OYO NASSARAWA 3 2 MAKURDI Mambila Akure Aliade ENUGU EDO Benin Ikeja 2005 : new Mambila Hydro 2 ONDO 2 Bali BENUE KOGI Okitipupa EGBIN P/ST. TARABA 2015 : new AJAOKUTA EKITI 2 NIGERIA 2015 : new Geregu ALAGBADO Jalingo Makurdi Ado Ekiti OSUN Abeokuta Lafia Lokoja Osogbo Ibadan PLATEAU Yola ABUJA IIorin OGUN REPUBLIC OF CAMEROON 2 Minna JEBBA/GS 2015 : new Enugu Akwa EBONYI Asaba LAGOS 2 ONITSHA 4 Abakaliki AN AMBRAAgip SAPELE P/ST. IMO CROSS RIVER Umuahia ABIA DELTA POWER ST. Owerri DELTA RIVERS Uyo Port Harcourt 2 2 BAYELSA Calabar AKWA IBOM AFAM POWER ST. Some 330kV lines especially in Lagos and Delta areas could not be indicated on this geographical Map. See attached single diagram for Details. 330KV LINES – MULTIPLE CIRCUITS 2 330KV LINES - EXISTING 330 KV BULK SUPPLY POINT H HYDROELECTRIC POWER STATION THERMAL POWER STATIONS 2015 : new 2015 : new NOTE: ATLANTIC OCEAN TCN NETWORK WITH SUPERGRID REPUBLIC OF CHAD 2015 : new Niamey NIGER SOKOTO Sokoto Katsina 132 kV 2015 : new YOBE Hadejia JIGAWA Birnin Kebbi BORNO TRANSMISSION GRID STRUCTURE WITH THE SUPER GRID IN PLACE Gusau KATSINA ZAMFARA Damaturu Potiskum 2015 : new Kano KEBBI Maiduguri KANO 2010 : new Zaria REPUBLIC OF BENIN KADUNA 2015 : 2nd Circuit 2015 : 3rd Circuit Bauchi 2 3 SHIRORO NIGER KAINJI BAUCHI Kaduna Jos Gombe ADAMAWA GOMBE 2 SAPELE P/ST. 2 KWARA 2 Minna 2010: new JEBBA/GS 2015 : new 4 JEBBA/TS Abuja OYO NASSARAWA 3 2015 : new EKITI MAKURDI Mambila Aliade Okitipupa EGBIN P/ST. ENUGU EDO Benin 2015 : new TRANSMISSION LINE LEGEND Ikeja 2005 : new Mambila Hydro 2 ONDO 2 Bali BENUE KOGI Akure 2 ALAGBADO REPUBLIC OF CAMEROON TARABA Makurdi AJAOKUTA Geregu Abeokuta NIGERIA 2015 : new Ado Ekiti OSUN OGUN Lafia Lokoja Osogbo 2 Yola Jalingo ABUJA IIorin Ibadan PLATEAU Enugu Akwa EBONYI 700KV LINES – SUPER GRID Asaba LAGOS 2 ONITSHA 4 Abakaliki AN AMBRAAgip SAPELE P/ST. IMO 700 / 330KV SUBSTATION CROSS RIVER Umuahia ABIA DELTA POWER ST. Owerri DELTA RIVERS Uyo Port Harcourt 2 2 BAYELSA Calabar AKWA IBOM AFAM POWER ST. 330KV LINES – MULTIPLE CIRCUITS 330KV LINES - EXISTING 330 KV BULK SUPPLY POINT H HYDROELECTRIC POWER STATION THERMAL POWER STATIONS 2015 : new 2015 : new NOTE: Some 330kV lines especially in Lagos and Delta areas could not be indicated on this geographical Map. See attached single diagram for Details. 2 ATLANTIC OCEAN THANK YOU