Nov 14, 2014 - ACEC Houston

advertisement
Hobby International &
IAH Terminal Redevelopment Program Update
Jarrett Simmons, Assistant Aviation Director – Planning
Houston Airport System
November 14, 2014
Hobby International Terminal Program
2
2
Hobby International Terminal Program
New Parking Garage
Entry Roadway Modifications
New Satellite Central Plant
New Concourse
Terminal Expansion
Hobby International Terminal Program
Roadway Signage
Hobby International Terminal Program
Airport Boulevard Landscaping
Hobby International Terminal Program
New Concourse Construction
Hobby International Terminal Program
New Concourse Construction
Hobby International Terminal Program
New Garage Construction
Hobby International Terminal Program
New Garage Construction
Intercontinental Airport Terminal
Redevelopment Program
(ITRP)
10
10
International traffic is booming in Houston
Reflecting the strength of the local economy, airlines continue to add new routes—most
outside of IAH’s historically strong Latin American market.
 2007: Dubai (Emirates)
 2008: Singapore via Moscow
(Singapore)
 2009: Rio de Janeiro (United); Doha
(Qatar)
 2010: Monterrey (VivaAerobus)
 2011: Lagos (United)
 2012: A380 to Frankfurt (Lufthansa)
 2013: Third daily London (United);
Istanbul (Turkish); Beijing (Air China)
 2014: Second daily Tokyo, Munich,
and Punta Cana (United); Seoul
(Korean); Stavanger (SAS);
Guadalajara and Cancun
(VivaAerobus); Santiago de Chile
(United); Monterrey (Aeromexico
and Interjet); A380 to Dubai
(Emirates)
 2015: Taipei (EVA)
11
11
More international gates are needed to meet demand
With only 6 widebody gates, Terminal D cannot accommodate new long-haul services at
peak times.
Central FIS
Terminal D
~4,000 pax
Terminal B
12 gates;
per hour
UA Express
foreign flags
Terminal A
Other
domestic
Terminal C
UA domestic
Terminal E
23 gates
UA int’l
12
12
Emirates Airbus 380 – Arrives at IAH 12/3/14
13
13
Second A380 gate under construction at IAH (11/13/14)
14
14
Emirates A380 First Class Fare
15
15
Intercontinental Airport Terminal Redevelopment Program (ITRP)
ITRP is in partnership between HAS and United Airlines
United’s Scope
HAS’s Scope
16
Utility Site & Utility Corridor Package
New electrical receiving station, domestic water tanks & utility tunnel
New Hardstand
Future Hardstand
8 – 747/777 Positions
ITRP PMO Building
Mickey Leland International Terminal (Terminal D)
The Leland International Terminal is the best solution
Terminal Package - 801,530 S.F. 15 international widebody gates (including 4 A380)
Apron Package – 1,386,000 S.F. (Pavement, drainage, hydrant fueling, etc.)
New North Terminal Roadway Package
(Includes New dedicated lanes for Terminals C, D & E)
Federal Inspection Services Package (FIS) Package
FIS Expansion, Security Checkpoint Consolidation & New Custom & Border
Protection (CBP) & Public Parking Garage
Upcoming ITRP Procurement Dates
Package
Date
Industry Day
Jan. 2015
Enabling Utility Design/Build
1st Qtr 2015
Hardstand Design/Build
1st Qtr 2015
PMO Building Design/Build
1st Qtr 2015
Terminal Design
2nd Qtr 2015
For more information on the
IAH Terminal Redevelopment Program
• Please visit: www.fly2houston.com/TerminalD
• Communications Regarding Executive Program Management (EMP) and
Program Support Services (PSS) RFQ’s must Be Received In Writing And
Directed Only To:
Mr. Andre’ Morrow
Senior Procurement Specialist
Houston Airport System
Supply Chain Management
andre.morrow@houstontx.gov
• For information on MWDBE certification please contact:
has.obo@houstontx.gov
Other upcoming FY15/FY16 opportunities
Project #
Status
721
D
736
DB
686
Project
Cost Mil
IAH Cell Phone Lot (JFK Will Clayton)
$11.8
HAS Admin Building Expansion
TBD
D
IAH Storm water Pollution Control System
$16.0
565
C
IAH Landside Roadway Repairs
$13.8
634
C
IAH Terminal A Vault Replacement
$11.6
651
C
IAH Taxiway WA/WB
$33.6
675
D
IAH NA Taxiway
$34.0
689 A / B
D
IAH Term A & C OTA Baggage Handling System
699
D
IAH Sanitary Sewer Improvements
$9.0
711
C
IAH EcoPark2
$11.8
712
C
IAH Terminal C Light Pole Replacement
$5.0
740
D
IAH Vehicle Maintenance Facility
$4.4
746
C
IAH Old Control Tower Demolition
$2.0
761
DB
IAH Parking Locator Guidance System
$15.0
545 B
C
HOU Consolidated Maintenance Center Complex
$6.3
690
C
HOU TSA Checked Baggage EDS Recap
$11.2
TBD
D
HOU RTR Cable Relocation
$0.4
TOTAL
$35.0 / $2.0
$222.9
Questions
26
26
Download