1 Table of Content 1. Introduction of CMC 2. CMC’s Turkey High-speed Railway Project 3. Advantage of CMC on Project Contracting 4. Preliminary Proposal 2 1. Introduction of CMC 3 CMC China National Machinery Imp. & Exp. Corp., a.k.a CMC, founded early in 1950, is a large SOE earliest engaging in foreign trade of machinery & electronic products and overseas construction project. 4 Our Organization President Vice Presidents Functional Depts. Business Depts. Domestic Subsidiaries Overseas Orgs Main Stock Holding & Joint Stock Enterprises Business Scope International contracting Project investment & financing Energy Industry Light Industry Transportation Building Materials PPP BOOT Equity investment Business Scope Import and Export Energy equipment Locomotives Rolling stocks Ships Automobiles Aircrafts Completed plants Auto Sales Mercedes-Benz Toyota Specialty automotive Bidding and procurement Government Procurement Bidding Export of labor service Technicians Workers CMC’s Honors On the rank list of America’s ENR, CMC has been listed into the ranks of TOP 225 International Contractors three times in succession since 2004. 7 CMC’s Advantages 1 Excellent credit 2 Close ties with governmental departments 3 Strategic cooperative relations with partners 4 Shining Achievements 5 Professional Teams Up to now,CMC’s aggregated trade volume has amounted to over US$ 85 billion. 8 CMC’s Achievements Imp. & Exp. Mode Import Covered Industries Urban Construction, Energy, Aviation, Agriculture & Forestry, Telecommunication, Vessel, Traffic, Industry, Environmental Protection, Water Conser- Turnover US$ 70 billion vancy, Vehicle, etc. Export Marine Vessels, Complete Plants & Sets of Processing Lines, Locomotives & Rail Cars, etc. US$ 15 billion 9 Railway Achievements During last 10 Years Project Achievements • Year Quantity & description Country • 2001 175 units of passenger coaches Pakistan • 2002 5 units of diesel locomotives Vietnam • 2005 30 A.C. Passenger Carriages Bangladesh • 2005 50 A.C. Passenger Carriages Bangladesh • 2006 77 Units of CKD Metro Cars Iran • 2006 100 Passenger Carriages Sri Lanka • 2006 Ankara-Istanbul High Speed Railway Project Turkey • 2007 112 Bogie Container Flat Wagons Thailand 10 Railway Achievements During last 10 Years Project Achievements • Year Quantity & description Country • 2009 120 EMU Cars for Rio De Janeiro Brazil • 2009 202 units of passenger coaches Pakistan • 2009 30 km Railway Construction Project Sri Lanka • 2010 960Km Railway Construction Project Ghana • 2011 Supply of 60 Locomotives Turkmenistan • 2011 Supply of 75 Locomotives Turkmenistan • 2012 240 EMU Cars for Rio De Janeiro Brazil • 2013 40 Electronic Power Vans Pakistan 11 2. Introduction of CMC’s Turkey High-speed Railway Project 12 2.1 Overview Turkey Ankara-Istanbul High Speed Railway Project Contract Signed in Nov. 2006 Construction Started in Sept. 2008. 13 2.1 Overview Turkey Ankara-Istanbul High Speed Railway Project Length: 154Km Speed: 250Km/h Construction Period: 3 Years Contract Value: USD 1.27 Billion 14 2.2 Project Financial Solution The financial solution of total contract value, USD 1.27 billion, is arranged as follows: a. Chinese portion of USD 720 million comprising Preferential Export Buyer‘s Credit and commercial loan from China EXIM Bank b. Turkish Portion of USD 550 million financed by Europe Investment Bank 2.3 Construction Progress Turkey Ankara-Istanbul High Speed Railway Project The Turkey high-speed railway construction project commenced in September of 2008. Bridge Project Office Camp at Site 16 2.3 Construction Progress Turkey Ankara-Istanbul High Speed Railway Project The subgrade treatment and track laying have already finished. Concrete Sleeper Installing 17 2.3 Construction Progress Turkey Ankara-Istanbul High Speed Railway Project The railway systems shall commence soon. Finished Track 18 3. The Advantage of CMC on Project Contracting 19 3.1 Lower Costs Taking advantage of notably lower costs of China High-speed Railway, CMC shall fully optimize the project proposal and greatly save costs for the project owner. COSTS COSTS COSTS 20 3.2 Higher Efficiency Making full use of the mature construction process of China High-speed Railway and the high-efficiency of Chinese consgtruction team to accelerate the construction speed 21 3.3 Assistance on Project Financing Relying on the close relationship with Chinese Government, CMC actively assistants the project owner to apply to the preferential export credit funded by Chinese Government Total project financing capability over US$ 20 Billion Business Area Quantity of Projects Sum of Contract Value Transportation 159 US$ 11.9billion Energy Production 75 US$ 2.5billion Urban Construction 98 US$ 1.9billion Environmental protection 85 US$ 1.5billion Telecommunication 54 US$ 1.5billion Water conservancy 18 US$ 0.9billion 22 3.3 Assistance on Project Financing Financing Cases on Railway Project by CMC 77 Units of CKD Metro Cars for Iran 175 Units of Passenger Coaches for Pakistan 100 Passenger Carriages for Sri Lanka Railway Signaling Modernization Project for Pakistan Cirebon-Kroya Double Track Project for Indonesia 202 units of passenger coaches for Pakistan Ankara-Istanbul High-Speed Railway Project for Turkey 30 Km Railway Construction Project for Sri Lanka 960Km Railway Construction Project for Ghana 23 4. Preliminary Proposal 24 Table of Content 4.1 CMC-CRCC Consortium 4.2 Project Financial Solution 4.3 EPC Project 4.4 Supply of High Speed Trainset 4.5 Operation Management 4.6 General Proposal 4.1 CMC-CRCC Consortium CMC and China Railway Construction Corporation (CRCC), shall bind as CMC-CRCC Consortium to undertake the High-speed Railway Project under an EPC contract with the Owner. Project Owner of High-speed Railway World Famous Consulting Corporation CMC-CRCC CONSORTIUM CMC Project Financing CRCC Supply of High Speed Trainset Operation & Maintenance Engineering Design Civil works 4.1 CMC-CRCC Consortium Services of CMC-CRCC Consortium The scope of service of CMC-CRCC Consortium shall include the following parts: Project Financial Solution EPC Works Supply of High Speed Train Set Operation Management 27 4.2 Project Financial Solution Chinese banks may provide relevant credit loans for the works section carried out by Chinese contractor in the whole project. However, if necessary, Chinese contractor could subcontract parts of such works financed by Chinese banks to foreign subcontractors. In principle, the credit loans from Chinese banks consist of three types: a. Government Concessional Loan b. Preferential Export Buyer's Credit c. Commercial Loan 28 4.2 Project Financial Solution Government Concessional Loan 1. General Terms: a. Interest Rate: 2~2.5% per year b. Repayment Period: 15~20 years c. Currency: RMB Yuan 2. Application: a. G to G Agreement b. Sovereign Guarantee c. No Export Credit Insurance 3. To be executed by China EXIM Bank 29 4.2 Project Financial Solution Preferential Export Buyer's Credit 1. General Terms: a. Interest Rate: 2~2.5% per year b. Repayment Period: 15~20 years c. Currency: US Dollar 2. Application: a. G to G Agreement b. Sovereign Guarantee c. No Export Credit Insurance 3. To be executed by China EXIM Bank 30 4.2 Project Financial Solution Commercial Loan 1. General Terms: a. Interest Rate: Libor + 3~4% per year b. Repayment Period: 15~20 years c. Currency: US Dollar 2. Application: a. Guarantee by banks or other finance organization, acceptable to Chinese financing banks c. Export Credit Insurance by SINOSURE 3. To be executed by China EXIM Bank or other Chinese banks 31 4.2 Project Financial Solution As for the high speed rail (HSR) network in Scandinavia, we propose: Preferential Export Buyer's Credit + Commercial Loan (if possible) for Chinese portion 32 4.3 EPC Project The High-speed Railway system shall mainly contain the following key technical systems: (1) Survey and Design, Chinese railway design institutes + international consultancy companies (2) Civil Works, Chinese construction company + local subcontractors (3) Traction Power Supply, Communication & Signals Equipment, Chinese integrators + worldwide famous system suppliers (4) Transport Scheduling and Passenger Service System, Chinese contractors + local partners 33 4.4 Supply of High Speed Trainset Supply of high speed trainset: Chinese manufacture + foreign key components suppliers 34 4.5 Operation Management (I) Operating Scheduling Chinese operating scheduling system can meet the scheduling demand of interval of 3 minutes. Chinese system suppliers + local partners (II) Repair & Maintenance Routine inspection and repairing as well as maintenance: Chinese contractor + local partners (III) Training High-level modern training center shall be built, covering professional knowledge training, simulation, practical operation, remote training, etc. Chinese contractor + local partners 35 4.6 General Proposal For the high speed rail (HSR) network in Scandinavia, we propose: International Design + Chinese Engineering & Construction plus High Speed Trainset based on Chinese Loan 36 Thank You 37