Features & Benefits








Increases productivity and shortens the erection time.
Lowers non-productive work (forms and shuttering).
Heavy building machines are unnecessary.
Diminishes need for qualified workers.
High thermal and sound insulation qualities.
High seismic resistance.
High quality building with simple maintenance.
Lower building costs for up to 30%.
TVD Certificates
International Patent Certificates
TVD safety and quality assurance
Structural tests and verification calculations
•
•
Faculty of Civil Engineering, Mostar,BH
Institute of Civil Engineering,Osijek,HR
TVD design
TVD
design
Modular coordination
Architectural and
structural
optimisation
PROJECT PLANNING
AND COST PROJECTION
Bills of
quantities
TVD design-1
Social housing and luxurious habitations
TVD design-2
Structural analysis and details
TVD design-3
• Items supplied for TVD design
•
•
•
•
•
•
•
•
•
L.1. Computer hardware consisting of:
-two Power Macintosh 9100 as a work station with 20” monitor;
-two laser HP printers;
-two high speed modem for communication with the Office;
-one flat-bed scanner;
-one A0 Ink-jet plotter;
-four bureau tables and chairs
L.2. Computer software consisting of:
-two sets of TVD software packages for design, calculation, and
supervision of building.
• For TVD design a design team consists of:
• - one architect, one engineer and two technicians .
TVD panel production line
One production line produces enough TVD panels for 80.000m2 of buildings.
Polystyrene
Reinforcing
w eb
Panel perforation
Panel assembly
Connection ties
production
Packing
Delivery
TVD panel production line-1
Axonometric view of production line and storage area
TVD panel production line-2
Samples of production’s line machines
TVD panel production line-3

Items supplied for TVD panel production line:
• In its minimal configuration with a capacity of ca. 250.000,00m2 of
finished TVD panels.
– Item A:
• (a) wire uncoiling reels for drawn wire consisting of:
– wire rod holding fingers to hold wire bar coils for vertical pay-off;
– one machine for bar straightening and cutting at required length;
– one machine for bar bending.
•
(b) adjustment of reinforcement meshes;
– one machine for mesh cutting;
– Item B:
• (a) one machine for steel connection elements
– consisting of an hydraulic press and forming tiles;
• (b) one machine for Polyethylene connection elements
– consisting of the PE production machine and forming tiles.
TVD panel production line-4
– Item C:
• (a) one machine for Polystyrene block cutting
– consisting of a fixed support, mobile carriage, insulated support, current
generator and monitoring electric board.
• (b) two machines for Polystyrene punching
– Punching of the polystyrene foam blocks at the size of panel so that they are
placed in vertical position and hydraulically pressed against preheated
thermo-spears placed in the positions required for the fixing of the connection
elements. Thermo-spears can have variable positions in order to suit the
particular structural need.
– Item D:
• (a) three machines for assembling of panels
– Panel assembling is done in a vertical position so that reinforcement meshes
and thermo elements are placed in their final position. Connection elements
are then fixed manually in the particular position.
TVD panel production line-5
– Item E:
• (a) one machine for packing finished panels
– Stacked finished panels (6 panels in a stack) are placed on the machine and
tied together with stripes for easier manipulation and transportation
– Item F:
• (a) two fork-lift trucks (10 kN)
– Item G:
• (a) one set of tools for electrical and mechanical maintenance
–
–
–
–
–
–
–
hand drill with D=13mm
set of screw keys and tools for mechanical maintenance
set of accessories and instruments for electrical maintenance
arch welder for electrodes
column drill with D=16mm
column grinding wheel
working bench and two shelves
TVD panel production line-6
– Optional items:
– Item H:
• Complete automation of production and storage lines
– To connect production to storage lines with steel frames and guiding rails to
enable easier, faster and semi-automatic transport of the elements.
– Item I:
• Polystyrene foam unit
– To transform polystyrene granulates into foam blocks.
– Item J:
• Electrowelded mesh unit
– To produce electrowelded reinforcement meshes.
– Production building
• For the production line in its minimal configuration (with the possibility of later
additions), the building should be around 1650m2, i.e. 27m large x 60m long and
6m high; a storage surface place of ca. 650m2 would also be recommended to
stock the panels.
TVD building
TVD building phases for a storey
TVD building
Placement of panels,
cutting of the
openings
First spraying with
concrete
Placement of slab
Placement of the
installations
Slab casting and
second wall
spraying
Next
floor
TVD building-1
TVD building phases for a storey
TVD building-2
TVD building-3
TVD building-4

Items supplied for TVD building:
• Corresponding to the estimated need of one 8 hours/day shift.
– Item K:
• 1.(*)
• 2.(*)
• 3.(*)
–
–
–
–
–
two concrete mixers for concrete preparation
two “gun” machines for spraying of concrete
set of accessories for the montage consisting of:
four electric circular saws for cutting out of openings;
two electric hammers;
four scissors for reinforcement cutting;
two sets of accessories for panel and slab placement:
two sets of accessories for concrete works consisting of: shovels, buckets,
wheel barrows;
–
two sets of accessories for wall finishing consisting of: trowels, floats, hand
levels, templates and finishing lineals;
–
two sets of accessories consisting of: hammer, sledge hammer, chisel, crow
bar, pliers.
TVD building
Apartment building on the island Krk, HR
TVD building
Multi-storey block house in Zagreb, HR
TVD building
Apartment building in Bos. Petrovac, BH
TVD and other building methods
CIB World Building Congress 1998, Gavle, Sweden
Quality of technologies acc. to several
criteria
Work participation in %
TVD
Velox
Gass c.
Clinker b.
Perforated b.
Isorast
Concrete b.
Poured c.
16.0
14.8
13.7
14.0
12.5
12.0
10.4
10.0
8.3
8.0
6.5
6.0
4.4
4.0
2.0 2.1
0.0
100
18.2
12.3
75
24.3
24.2
58.3
63.5
50
25
0
MSB
TVD
installation
finishing
structure
TVD process
The complete TVD process system package consists of:
A. TVD design comprising a 5 year licence, know-how and software (Item L)
B. TVD panel production line in its minimal configuration (which could be enlarged
to suit particular needs). Following option(s) can be added:
Complete automation of the production line;
Electrowelded mesh unit;
Polystyrene foam unit.
C. TVD building comprising the equipment needed for building process (Item K),
technologies for concrete preparation and building erection.
D. One year technical assistance comprising control of equipment, training of staff
for TVD design, TVD panel production and TVD building), as well as supervision
of a site.
E. Preliminary design or adaptation of a project for every situation will be dealt
separately.
TVD process
Sustainable building system for the next century

Info: sigmund@most.gfos.hr

Prof. dr. sc. Vladimir Sigmund, BCE
Faculty of Civil Engineering
Drinska 16a, 31000 Osijek
Croatia



Download