Legacy Application Modernisation: RR 21 May 2014 Presentation By: Xolisa Ncobo Application Modernisation Summary Division Roshcon/Rotek Number of Applications 22 Modernisation Not Required 3 • Dovetail Freightware • Micro Alert 7 Further Investigation (Require modernisation or not) • • • • Bentley applications Driver and Vehicle Office (DVO) Optiload PED Contract Management Framework Modernisation Candidates 12 Decommission (1) Consolidate (2) • Construction Computer Software (CSS)***(M) • • Global Telematics Fleet Management Service***(M) Projectwise***(M) • • • • • *** • Shazam • Shocklog • Track Tech (Biometric Access Control) Replace (8) • • • Quick Wins • RIB Docwise***(M) Non Destructive Testing (NDT) Reports (M) Overtime (M) Ptrail (M) Q&A (Vehicle Rental Management)***(H) Qpulse***(M) Vehicle Allocation System (VAS)***(H) Vehicle Management System (VMS)***(H) Re-Platform (1) • Prioritized Application (High/Medium/Low) 2 Cable Management System (H/M/L) Application Modernisation Summary Division Roshcon/Rotek Modernisation Candidate Option Replace Current Application 1. 2. 3. 4. 5. 6. 7. 8. To-Be Application Docwise***(M) Non Destructive Testing (NDT) Reports (M) Overtime (M) Ptrail (M) Q&A (Vehicle Rental Management)***(H) Qpulse***(M) Vehicle Allocation System (VAS)***(H) Vehicle Management System (VMS)***(H) Quick Wins 1. 2. 3. 4. 5. 6. 7. 8. *** Hyperwave TBD TBD TBD TBD - SAP Fleet, another application Incidents – SAP QiM, Safety – SAP EHS SAP TSW, APO SAP TSW, APO Prioritized Application (High/Medium/Low) 3 (H/M/L) Prioritised Modernisation Candidates: Roshcon/Rotek Low Medium High Existing Project or BAU • N/A • Construction Computer Software (CSS)*** • Docwise • Global Telematics Fleet Management Service • Non Destructive Testing (NDT) Reports*** • Overtime*** • Projectwise • Ptrail • Qpulse • Cable Management System*** • Q&A (Vehicle Rental Management) • Vehicle Allocation System (VAS)*** • Vehicle Management System (VMS)*** *** 4 Motivation and Recommendations Roshcon/Rotek Priority Category High (1) Modernisation Candidate Q&A (Vehicle Rental Management) Quick Win (Implement within 12 months) Yes Risk Business Value Cost Savings H H L Motivation and Recommendation Strategic Driver: Ensure Financial Sustainability, Align with Eskom’s B2B principles Dependencies: None Modernisation Criterion: Bespoke Modernisation Option: Replace by SAP Fleet or another application Minimise risk of not having access to the current application Medium (5) Docwise Yes Strategic Driver: Align with Eskom’s B2B principles, Become a High Performance Organisation Dependencies: Storage Capacity for migration of current documents and indexing capabilities of Hyperwave. Modernisation Criterion: Standardisation Modernisation Option: Replace with Hyperwave Global Telematics Fleet Management Service Yes Strategic Driver: Improve safety Performance through Driver Safety Plan, Ensure Financial Sustainability Dependencies: Modernisation Criterion: Multiple instances & functionality overlap Modernisation Option: Consolidate Investigate the application to use between global and mix telematics and consolidate the multiple versions Projectwise Yes Strategic Driver: Align with Eskom’s B2B principles, Dependencies: Modernisation Criterion: Standardisation Modernisation Option: Consolidate Leverage from Eskom's enterprise Bentley Contract and use the Eskom version High/Medium/Low - H/M/L 5 Motivation and Recommendations Roshcon/Rotek Priority Category Medium (5) Modernisation Candidate Quick Win (Implement within 12 months) Risk Business Value Cost Savings Motivation and Recommendation Ptrail No Strategic Driver: Becoming a High Performance Organisation through Improvement of Due-Date performance for Outages and Eradication of Reworks. Dependencies: Modernisation Criterion: Bespoke Modernisation Option: Replace by a COTS application to be determined. Qpulse Yes Strategic Driver: Improve safety Performance Ensuring that SHEQ management systems are in place, Align with Eskom’s B2B principles Dependencies: SHEQ Automation Project Outcomes Modernisation Criterion: Standardisation Modernisation Option: Replace by SAP QiM for Incident Management & SAP EHS or another application for safety High/Medium/Low - H/M/L 6 Way Forward • Define strategic drivers to modernise RR applications • Prioritise modernisation candidates and list existing projects/BAUs to modernise applications • Define modernisation candidates impact analysis in terms of risks, costs, effort, etc and dependencies. • Submit plan to legacy application modernisation steerco for approval 7