Hythro Power Corporation Limited.

advertisement
Hythro Power Corporation Limited.
Hythro: Inception & Background
•
•
•
•
•
Hythro was established in the year 1989.
Part of ‘Tecpro Group’, a leading EPC business house providing comprehensive range of services in
power, steel, mining, cement & other industries in Infrastructure sector & balance of Plants for
Power Sector. Tecpro Systems Limited, a flagship company of Tecpro Group, which is listed on
Indian Stock Exchanges with a market capitalisation of approximately US $ 200 Million. The group
turn over including listed & other entities is approximately US $ 800 Million.
One of the prominent EPC (Engineering, Procurement & Construction) player in all the power sector
segments i.e. from Power Generation to Power Transmission to Power Distribution.
Undertaking large EPC contracts for many projects from various prestigious organizations. And its
manufacturing facility of towers has played an important role for its stupendous success in Power
Transmission segment.
With the in-house engineering/technical competency & organic/inorganic growth strategy the
company is all set to emerge out as the key player in the Global Power industry.
Vision & Mission
Our ‘aspiration to grow’ & our ‘focus on customers/ timely delivery’ & ‘focus on quality/safety’
has been our guidelines in doing our business. Our Vision & Mission statements capture them all:
Vision
Mission
“To become one of the leading company in the
field of Turnkey projects up to 800 KV EHV
Transmission Lines and Sub-Stations in National
and International markets”
“To be most preferred supplier by adding value to
the customer’s project focusing on Quality, Cost,
Innovation and Productivity with due regard to
occupational health, safety and environment”
Business : From Power Generation to Load Centers
GENERATION
E-BOP
NON-CONVENTIONAL/RENEWABLE ENERGY
Electrical Balance of Plant for
Power Plants
Creating Power Evacuation System for Renewable Energy
Supply
TRANSMISSION & DISTRIBUTION
TOWER PARTS
MANUFACTURING
EHV
TRANSMISSION
LINES
EHV
SUBSTATIONS
MV, LV
Distribution
Lines
Rural
State of art manufacturing
Electrification,
plant situated at Bhiwadi, Turnkey projects
Turnkey projects
RGGVY, APDRP,
Rajasthan having capacity upto 765 kV Class upto 400 kV class
Feeder Separation
of 30000 MT /annum
Projects, Etc.
RAILWAYS
Traction-overhead
systems, switching
stations, traction
substations, etc.
LOAD CENTERS
INDUSTRIAL /COMMERCIAL ELECTRIFICATION
Creating electrical infrastructure for the manufacturing/commercial entities.
Quality Management System With
Health, Safety & Environment Policy
•
•
We, as Hythro Power Corporation
Ltd., lay high emphasis on the quality
management to ensure the quality in
every respect. We have been
accredited
with
ISO-9001-2008
certification.
Also we do take care of all the
necessary safety measurements &
established our HSE policy for the
same. We have been accredited with
ISO-14001-2004 & BS OHSAS 180012007 for our endeavors in this
regard.
Design Capability
Project Type
Substations
Design Capability
Electrical
Bus Configuration, Metering & Relaying Diagram, Layout Design, Selection Of Relays , Ct / Pt Calculation, Vendor Drawing Review, Battery &
Charger Sizing, AC / DC Schematic Engineering, Fault Level Analysis, Relay Setting Calculation, Substation Automation & Communication
Engineering
Civil & Structurals
Structural Steel, RCC Design, Foundation Design & Analysis, RCC Building Design, Detailing Of RCC and Structural Steel
Fire Fighting System
P&I Diagram, Fire Alarm & MCC Fire System, Hydrant System
CO2 System
E-BOP
Transmission Lines
HVAC
Heat Load Calculation, Selection Of Air-Conditioning & Distribution System, Selection Of Fire Alarm Panel & Control System
Metering, Relaying & Control System For Generator, Generator Transformer, Excitation & Unit Auxiliary Transformer.
Detailed Engineering Include Cable Sizing, Cable Routing & Control Schematics For:Coal Handling System, Ash Handling System, Water
Treatment Plant, Electrostatic Precipitator, Selection Of PCC & MCC For Plant Electrics, Power Plant Earthing Design, Lighting & Lightning
Design, Fault Level Analysis, Relay Coordination/Recommendation And Instrumentation Engineering
Tower Spotting, Sag Tension Calculation, Sag Template, Clearance Diagram, Stringing Chart, Structural Analysis & Design Of Tower And
Foundation Analysis & Design
Project Management
•
•
•
•
The key to success in EPC projects is the ability to manage the resources to provide quality and
delivery, meeting client’s requirement. This aspect of project management can be achieved only by
experience.
Our company has in its roles- successful and cohesive team to manage projects from Survey to
commissioning with experienced professionals with decades of experience behind them in
executing contracts of varied nature and sizes.
The combined experience of our executives in Turnkey Projects shall ensure that our client gets
best in Technology and Quality at competitive cost.
The project management team uses latest software and an internally developed project reporting
system to provide the clients with progress and plan for project execution and management.
Manufacturing Plant
Consolidated Financial CapabilityHythro Power & Its Subsidiaries
TURN OVER IN USD (MILLION)
250
200
150
100
50
0
2006-07
2007-08
2008-09
2009-10
FINANCIAL YEAR
*Considering 1 USD = 50 INR
* Including proportionate Finance of subsidiaries
2010-11*
2011-12*
Our Accomplishments
•
•
•
•
Executed several E-BOP projects ranging from 28 MW to 2 x 600 MW on turnkey / partial
turnkey basis.
Laid more than 10,000 ckt. kms of transmission & distribution lines. Have expertise to lay the
lines through difficult terrains (e.g. hilly regions, deserts, river crossings, snow capped
regions, cultivated land, urban areas etc.) and already executed such projects for our
prestigious clients including government organisations & private parties.
Constructed over 500 substations / switchyard projects from 33kV to 400kV level in different
parts of the country under different environmental conditions for the prestigious clients
including government organisations & private parties.
Continuous growth of the Hythro Group from USD 12.9 Million in FY 2006-07 to USD 167
Million in FY 2010-11.
(** Accomplishments by Hythro Power & its subsidiaries)
Contact Details
CONTACT ADDRESSES
Head Office:
Bangalore:
Kolkata:
Mumbai:
Chennai:
TECPRO HOUSE,
Plot 78, Sector 34,NH-8,
Gurgaon-122001
No 1316/C, 2nd Floor,
80 Ft Road, 9th Cross,
JP Nagar 2nd Phase,
Bangalore- 560078
Godrej Waterside,
Tower-I, 11th Floor,Flat Nos. 1101 & 1102,
Plot - 5, Block – DP, Sector - V, Salt Lake City,
Kolkata - 700 091
502-503, Building No. A-2,
Jagdamba Commercial Complex,
(Movie Time Complex)
Link Road, Malad (West)
Mumbai – 400 064
G.E.T. Power Ltd.
No.153, Developed Plots, Electrical & Electronics
Industrial Estate, Perungudi,
Chennai - 600 096
Ph: +91 124 4880100/200/300/400
Fax: +91 124 4880354
Email: hpcl@hythropower.com
Ph: +91 80 26588846/ 47
Fax: +91 80 26588843
Email: hpcl@hythropower.com
Phone: +91 33 40261717
Fax : +91 33 4026 1700 /1701
Email: hpcl@hythropower.com
Ph: +91 22 4003 1257/ 42388500
Fax: +91 22 4003 1256
Email: hpcl@hythropower.com
Ph:- +91-44-45991001/2/3
Fax: +91-44-45991000
Email: hpcl@hythropower.com
Project Glimpse
Transmission Lines
S.No. Client
400kV Class & Above
1
Shree Cement
Project Details
D/S/E/T/C of D/C line at Beawar ( Rajasthan)
2
Adani Power
E/T/C of D/C Mundra-Zerda Transmission line of GETCO
3
PGCIL
E/T/C of LILO D/C & S/C Singrauli –Kanpur Line
4
Aster
E/T/C of D/C Mundra - Varsana Transmission line of GETCO
5
Areva
D/C & S/C line associated with NTPC Sipat
6
Sravanthi Infratech D/S of Quad Moose TL for 220MW Gas based Power Project
7
KWPCL
(Avantha Power)
D/S/E/T/C of TL for 2x600 MW KWPCL Raigarh Project,
Chhattisgarh
8
Jyoti Structure
S/E/T/C of TL at WRSS-Maharashtra of RETL.
Project Glimpse
Transmission Lines
S.No.
Client
Project Details
220 kV Class
1
UPPTCL
S/E/T/C of D/C Parichha- Mainpuri Line
2
RSEB
E/T/C of S/C Bhilwara to Kankroli Line
3
UPPTCL
S/E/T/C of D/C Transmission Line
4
PTCUL
5
HPPTCL
6
7
Jaiprakash
Associates
PTCUL
8
RSEB
S/E/T/C of Rishikesh - Dharasu (I) & chamba - Dharasu
Transmission Line
D/S/E/T/C of S/C TL from 220KV Palchan S/S to 220KV A.D.
Hydro Switchyard
S/E/T/C of D/C over line from Kunihar 220KV substation to JHCP
Baga.
S/E/T/C of D/C line of Single Zebra (Rudrapur-Srinagar via
Ghansali)
Ratangarh -Sikar -Rengus
9
KPTCL
D/S/E/T/C of Bastipura-Kushalnagara D/C T/L.
10
KPTCL
D/S/E/T/C of Shimoga-Huygonahalli LILO T/L.
Project Glimpse
Substation
S.No. Client
400kV Class
1
PGCIL
2
PGCIL
3
4
PGCIL
PGCIL
5
6
7
8
9
10
11
12
13
14
PGCIL
PGCIL
PGCIL (Thru BHEL)
PGCIL (Thru BHEL)
TNEB (Thru BHEL)
PGCIL (Thru ABB)
KPTCL( Thru BHEL)
IRCON International
PGCIL(Thru Alstom)
NLC (Thru TATA
Projects)
UPCL (Thru Alstom)
15
Project Details
D,S,E,T,C for bay extension works at 400kV Fatehabad S/S.
D,S,E,T,C for bay extension works at 400kV Sonepat S/S -I, II
and125 MVAR Bus Reactor Bay .
D,S,E,T,C for bay extension works at 400kV Hosur S/S.
D,S,E,T,C for bay extension works at 400kV Madurai S/S for 63
MVar Karaikudi line reactor.
D,S,E,T,C for bay extension works at 400kV Trichy S/S.
D,S,E,T,C for bay extension works at 400kV Udumalpeth S/S.
E,T,C of 400/220 kV Thiruvananthapuram S/S.
E,T,C of 400 kV Madurai S/S (extension bays).
E,T,C of 400/30/110 kV Alamathy switchyard.
E,T,C of 400/220 kV Hiriyur S/S.
E,T,C of 400 kV Guttur switchyard (extension bays)
E,T,C of 400 kV Mapusa S/S
E,T,C of 400 kV Upper Indravati S/S.
E,T,C of 400/220/33 kV Neyveli S/S.
E,T,C of 400/220 kV Muzzafarnagar switchyard.
Project Glimpse
Substation
S.No.
Client
220 KV Class
1
KPTCL (Thru Alstom)
Project Details
S,E,T,C of 220/110/66kV MRS Shimoga switchyard.
2
KPTCL
D,S,E,T,C of 220/66/11 kV Huygonahalli substation.
3
KPTCL
D,S,E,T,C of 220/66 kV & 66/11 kV Naganathapura S/S.
4
KPTCL
D,S,E,T,C of establishing 220/66 kV Kushalnagar substation.
5
Delhi TRANSCO Ltd.
(Thru BHEL)
E,T,C for 230/33 kV switchyard.
6
NLC (Thru L&T)
E,T,C of 220/11 kV Neyvelli switchtyard.
7
GRIDCO, Orissa
(Thru TATA Projects)
E,T,C for 220/33 kV Barkote & Rairak switchyard.
8
Tanir Bavi Power
Company(Thru ABB)
E,T,C of 220 kV Mangalore S/S.
9
BGR Energy
E/T/C of 230/11kV GIS Substation at Hyundai Motors India
Ltd.
10
BSES Limited
E/T/C of 220/11 KV , 2x40 MVA , 2 bay switchyard
Our Accomplishments
Mr.
Amul
Gabrani,
Chairman & Managing
Director(L) and Mr. Ajay
Kumar Bishnoi, Director(R)
receiving the “SME of the
Year” & “Most Promising
SME in Power & Telecom
Sector” – CRISIL powered
CNBC-TV18-ICICI
Bank
Emerging India Awards
2012,on behalf of Hythro
Power Corporation Ltd.
Installations
Installations
Installations
Installations
Working Experience In Snow
THANK-YOU
Download