Geotechmin_Dominic_Hamers_EN_last

advertisement
Conference BULGARIA & ITALY: LET’S BUILD TOGETHER
June 5 - 6 2014, Sofia Hotel Balkan
GEOTECHMIN GROUP AND ITALY
EIGHT YEARS
SUCCESSFUL PARTNERSHIP
Dominic Hamers
Executive Director
Geotechmin ООD
1 - 28
GEOTECHMIN GROUP
SINCE 1990
Nowadays our activities extend to
business sectors as:
•
•
•
•
•
Mining
Design and Construction
Trade
Tourism
Services
We are:
•
•
•
•
21 subsidiaries
Over 4200 employees
27 industrial sites
Over 2000 various
machines and
equipment
• About 100 win-win
partnerships
• Over 15 memberships in
branch organizations
2 - 28
GEOTECHMIN GROUP
SECTOR CONSTRUCTION & INFRASCTUCTURE
GEOTECHMIN OOD – Metro stations, industrial buildings and
facilities, airports and adjoining airway facilities.
GEOSTROY AD – Industrial buildings, flotation facilities,
transportation and hydro-technical tunnels and galleries.
Construction and design of landfills for industrial and non-hazardous
wastes; rehabilitation of damaged areas; wastewater treatment
plants; transfer stations for wastes.
ROAD COMPANY EAD – Coordinates and supports the activities of
GEOTECHMIN Group of companies involved in infrastructure
construction and road maintenance.
PATSTROY-92 AD – Repair works and maintenance of motorways,
roads, roads facilities and communication networks.
ULICHNO OSVETLENIE EAD – Operation and maintenance of street
lighting and electrical installations and low and medium voltage
system.
3 - 28
2006 - OUR FIRST ITALIAN PARTNER
Petrolvilla Group (PVB) is a diversified energy group,
based in Trento, which operates in five main business areas:
• Fuels supply and distribution
• Renewable energy
• Facility
• Technological systems
• Cleaning services
PVB has an investment project for the construction of 9 MHPP
in Bulgaria. The project investment is estimated to 160 mln.
euro and is implemented through PPP between Petrolvilla
Bulgaria AD and Svoghe Municipality - VEZ Svoghe AD.
4 - 28
CONSTRUCTION OF
4 MICRO HYDROPOWER PLANTS AS
PART OF SREDEN ISKAR CASCADE
PROJECT
CONTRACTOR: GEOTECHMIN OOD
Project Execution Period: 2006 – 2012
PVB choose Geotechmin OOD as a main
contractor for civil works for their first
project in Bulgaria.
• The first stage of this project includes construction of MHPP
“Svrazhen” and “Lakatnik” (2006-2009).
• In the second stage are included MHPP “Tzerovo” and
“Opletnya” (2010-2012).
5 - 28
SREDEN ISKAR
CASCADE PROJECT
All four power plants,
implemented by
Geotechmin OOD consist
of following sub-projects:
• main building
• inflow and outflow
facilities
• overflow
• fish passageways
• service and access
roads, landscaping.
6 - 28
SREDEN ISKAR
CASCADE PROJECT
The main contractor of
the fifth MHPP
“Prokopanik” is Geostroy
AD, part of GEOTECHMIN
Group.
MHPP “PROKOPANIK”
EMPLOYER: VEZ SVOGE AD
CONTRACTOR: GEOSTROY AD
Project Execution Period: 2012-2013
Project cost: 7 mln. BGN
At MHPP “Prokopanik”
was implemented the
highest dam with
concrete diaphragm in
Bulgaria.
7 - 28
2007 - OUR ITALIAN PARTNERSHIP
CONTINUES…
ENEL is Italy's largest power company and Europe’s
second listed utility company by installed capacity.
ENEL operates in 40 countries across 4 continents,
overseeing power generation from over 98 GW of net
installed capacity.
ENEL entered in Bulgaria in 2003 with the acquisition
of Maritza East III Thermoelectric Plant.
8 - 28
WATER
MANAGEMENT
SYSTEM AT MARITZA
EAST ІІІ
THERMOELECTRIC
POWER PLANT
EMPLOYER:
ENEL S.P.A. ON BEHALF OF
ENEL PRODUZIONE S.P.A.
CONTRACTOR: GEOTECHMIN OOD
Project Execution Period: 2007 – 2008
Project Cost: 5 mln. BGN
9 - 28
WATER MANAGEMENT
SYSTEM AT MARITZA EAST
ІІІ THERMOELECTRIC
POWER PLANT
The project is executed in the conditions of uninterrupted plant operation.
It includes the following subprojects:
• Two Oily Water
Treatment Basins
• Foundations for a Dosing Device
for Cooling Water Chemicals
• First-Flush Rainfall Water
Basin
• Repair of the Foundations of the
Pump Stations for Purified and
Sluice Water
• Buffer Pond
• Underground pipelines for
connection of the new utilities
to existing ones.
10 - 28
WATER MANAGEMENT
SYSTEM AT MARITZA EAST ІІІ
THERMOELECTRIC POWER
PLANT
Conducted works:
Excavation works –
24,000 M3
• Filling and backfilling
works – 71,000 M3
• Concrete works – 1,700
cub.m.
• formwork – 2,700
cub.m.
• reinforcement works –
134 tons
• reinforced concrete
pipes – 690 m
• PVC pipelines – 400 m
• GRP pipelines – 1,100 m
• metal structures – 15
tons
11 - 28
2011 - OUR ITALIAN PARTNERSHIP
CONTINUES …
UNIECO, placed in Reggio Emilia, is placing among the top
ten Italian General contractors, with diversified activities in
the following sectors:
• Construction
• Bricks manufacturing
• Railway works
• Environment
UNIECO enjoys important relations with public and private
partners and works on high profile projects and contracts,
also through its vast network of subsidiary companies.
12 - 28
SADINATA
NON-HAZARDOUS
WASTE LANDFILL,
WWTP AND
RECEPTION AREA
EMPLOYER:
SOFIA MUNICIPALITY
CONTRACTOR: JOINT VENTURE
GEOTECHMIN-UNIECO
Project Execution Period: 2011-2012
Project Cost : 20 mln. BGN
Financed under EU Operational Programme
“Environment 2007-2013”
13 - 28
SADINATA NON-HAZARDOUS
WASTE LANDFILL, WWTP AND
RECEPTION AREA
Geotechmin was the leading partner in JV Geotechmin – Unieco,
which signed a contract with Sofia Municipality for the construction
of Sadinata non-hazardous waste depot, WWTP and reception area.
These three subprojects are part of the first stage of the important
project “Integrated System of Municipal Waste Treatment Facilities
for Sofia Municipality.
Following subprojects are included:
• Waste depot
• Wastewater treatment plant
• Administrative area
• Roads
• Underground infrastructure
14 - 28
2012 - OUR ITALIAN PARTNERSHIP
CONTINUES …
IMPRESA S.p.A. is a private construction group specialized in
planning and execution of important infrastructure building
works in Italy and worldwide. In Italy it represents one of the
most important General Contractors.
The commitment of IMPRESA to foreign markets is embodied
by the opening of several construction sites chiefly in Asia,
Europe and the Middle East.
The first project for IMPRESA in Bulgaria is Struma Motorway,
which is part of the European Transport Corridor № IV of
the Trans-European Motorway “North-South”.
15 - 28
STRUMA HIGHWAY
DOLNA DIKANYA-DUPNITSA
ROAD SECTION, 16,780 KM LONG
EMPLOYER: ROAD INFRASTRUCTURE AGENCY
CONTRACTOR: CONSORTIUM “STRUMA-1“ (with leader IMPRESA and
GLAVBOLGARSTROY AND PATSTROY-92 as partners)
Project Execution Period: 2011 – 2013
Project Cost: 58 mln.BGN
Financed under EU Operational Programme “Transport 2007-2013”
16 - 28
STRUMA HIGHWAY
DUPNITSA-BLAGOEVDRAD
ROAD SECTION, 37,484 KM LONG
EMPLOYER: ROAD INFRASTRUCTURE AGENCY
CONTRACTOR: CONSORTIUM “STRUMA-2“ (with leader IMPRESA and
GLAVBOLGARSTROY AND PATSTROY-92 as partners)
Project Execution Period: July 2013 – March 2015
Project Cost: 300 mln. BGN
Financed under EU Operational Programme “Transport 2007-2013”
17 - 28
2012 - OUR ITALIAN PARTNERSHIP
CONTINUES …
Italcementi Group is the world’s fifth largest cement
producer with annual production capacity of more than
60 million tons and 46 cement plants.
Italcementi Group entered in the Bulgarian market in
1998 with the acquisition of Devnya Cement AD.
In 1999 Italcementi Group acquired Vulkan Cement plant.
Presently Italcementi Group is the largest cement
producer in Bulgaria and has an annual production
capacity of 2.5 million tons.
18 - 28
NEW PRODUCTION LINE
AT DEVNYA CEMENT
PLANT
In 2012 Devnya Cement AD
selected the Chinese
company CBMI
Construction (part of
SINOMA Group) as EPC
contractor to carry out the
reconstruction and
modernization of Devnya
Cement Plant.
This is one the of the
largest investment
projects in Bulgaria during
the last 20 years.
The total investment by
Italcementi Group in this project
amounts to approximately
160 million euro.
19 - 28
NEW PRODUCTION LINE
AT DEVNYA CEMENT
PLANT
Through a tendering
procedure Geotechmin OOD
was appointed as a
subcontractor of CBMI
Construction.
Within the scope of this
project, Geotechmin
executes the reinforced
concrete structures of the
main facilities.
Construction Indicators:
•
•
•
•
Excavation works - 49 500 M3
Filling works - 35 500 M3
Concrete works - 20 600 M3
Concrete Silo walls – slipform
technique - 2 200 M3
• Steel reinforcement –
2 220 tons
• Prestressing strands - 22 tons
• Form work - 25 000 M3
20 - 28
NEW PRODUCTION LINE
AT DEVNYA CEMENT
PLANT
The following subprojects were included
in Geotechmin’s scope
of works:
• Raw Mill Foundation
• Preheater Tower
• Cylindrical reinforced
Concrete Silo
• Foundations for
conveyors
• Fan foundations for the
preheater tower
• Transfer tower
21 - 28
OUR MAIN STRENGHTS
• Financial stability and reliability as a partner.
• Recognized reputation as quality performance
contractor.
• Highly experienced in project execution under
difficult conditions and ongoing production.
• Considerable human and technical resources,
machines and equipment.
22 - 28
OUR METRO PROJECTS
Metrostation
9-I Vassil
Levski
and TBM Shaft
Metrostation
11-II with
Adjoining
Tunnel
Metrostation
16-I with
Adjoining
Tunnel
Employer:
Taisei
Corporation
Employer:
Metropolitan
EAD
Employer:
Metropolitan
EAD
23 - 28
OTHER KEY PROJECTS REALIZED
WITH FOREIGN PARTNERS
LOT B2
SOFIA
AIRPORT
Waste Water
Treatment
Plant
Foundation
for wind
turbines
Employer:
Kuwait
Consortium
MAKDMAK
Employer:
The Japanese
Mitsubishi
Materials
Techno
Employer:
Global Wind
Power A/S
Denmark
24 - 28
OUR MEMBERSHIPS
IN BRANCH ORGANIZATIONS
Our companies from Construction & Infrastructure Sector are
members of the following branch organizations:
• Bulgarian Construction Chamber – Geotechmin OOD,
Geostroy AD (with representative in the Executive
Body), Patstroy-92 AD, Roads & Equipment EAD.
• Bulgarian Branch Chambers ROADS – Patstroy-92 AD is
among the founders, Roads & Equipment EAD.
• International Tunnelling Association (ITA-AITES) –
Geotechmin OOD is the first Bulgarian member since
1997.
25 - 28
WE ARE OPEN FOR FURTHER PARTNERSHIPS
After eight years successful partnerships GEOTECHMIN
Group is looking for new partnerships with Italian companies
both in Bulgaria and on the Balkan peninsula.
26 - 28
WE ARE OPEN FOR FURTHER PARTNERSHIPS
27 - 28
THANK YOU FOR YOUR ATTENTION!
Dominic Hamers
Executive Director
Geotechmin OOD
T 02 9650 251
E d.hamers@geotechmin.com
W www.geotechmin.com
28 - 28