An Overview of TBM Tunnelling in Turkey and Middle East Özgür Savaş Özüdoğru E-Berk Tunnelling & Foundation Tech. 21.08.2012 Colorado School of Mines CONTENTS • • • • • A quick overview of E-Berk Project details in Turkey Upcoming projects in Turkey Project details in the Middle East Selected planned major tunnelling projects in the M.E. • Selected major tunnelling projects under way in the M.E. • Conclusion A Quick Overview of E-Berk • Founded in 2002 as subsidiary of Ozudogru Group of Companies. • Located in Ankara with 8000 m² manufacturing and heat treating closed facility. • Offices are located in Istanbul, England and Qatar (from October 2012). • All kind of TBM cutters has been producing such as cutter ring, single and double disc cutter, ripper, bucket, knife and any kind of cutter with tungsten carbide. • Cutterhead modification, TBM overhaul and site assembly. • 20 projects has been finished in Turkey and exports increased to 12 different countries such as Russia, Poland, India, Bulgaria, Saudi Arabia, Azerbaijan, Australia, Israel, and so on. Metro transportation is an indispensible issue for solving traffic problem for metropolitan areas. Therefore, every year metropolitan municipalities spend a lot of money for metro tunnel construction from their budget. For example, Istanbul Metropolitan Municipality (IMM) has been spending approximately 45 % of its investment budget for metro and transportation projects in last year's. Depending on the ratio of the population of human beings, clean water supply and waste water disposal projects is becoming more importance. Within this scope, General Directorate of State Hydraulic Works has also been spending approximately 20 % of its investment budget which is about 1 billion USD to clean and waste water tunnel project. PROJECT DETAILS IN TURKEY ANADOLU RAY – Kadikoy Kartal Metro Project Location: İstanbul, TURKEY Contractor: YAPI MERKEZI-DOGUSYUKSEL-YENIGUN Joint Venture Lenght of Tunnel: 12331 m Type of TBM: Herrenknecht EPB Diameter of TBM: 6,57 m Number of Cutter Disc in Cutterhead: 26 single cutter disc 6 double cutter disc Ground Condition: Clay, sand, gravel deposit, shale,limestone, fault Single Disc Cutter Cutter Ring Hub Shaft Twin Disc Cutter Cutting Knife DSI Blue Tunnel Project (Turkish Republic Ministry of Environment and Forestry) Location: Konya, Turkey Contractor: İLCİ Joint Venture Lenght of Tunnel: 17034 m Type of TBM: SELI Double Shield Diameter of TBM: 4,2 m Removable SingleDisc Scraper Scraper Support Wedge Wedge Type Twin Disc ISKI Istanbul European Side 2nd Part Waste Water Tunnel Project Location: Silivri- İstanbul, Turkey Contractor:NAS INS. Lenght of Tunnel: 8674 m Type of TBM: Herrenknecht EPB Diameter of TBM: 3,82 m Double Disc Cutter Scraper Knife Bucket Housing Chisel Single Disc Cutter ISKI Istanbul European Side 3th Part Sea Water Tunnel Project Location: Cayırbasi Ayazaga, Turkey Contractor:DEPAR INS. Lenght of Tunnel: 5000 m Type of TBM: Herrenknecht Hardrock TBM Diameter of TBM: 3120 m Over Cutter Scraper Bucket Disc Cutter Bucket ISKI İstanbul European Side 4th Part Waste Water Tunnel Project Location: Istanbul European Side İLCİ OZGUN Joint Venture Lenght of Tunnel: 9254 m Type of TBM: Herrenknecht EPB Diameter of TBM: 4,6 m Twin Ripper Twin Disc Cutter Double Disc TBM Backup Equipments Knife Istanbul BASAKSEHIR-IKITELLI Metro Project Location: Istanbul GULERMAK-DOGUS Joint Venture Lenght of Tunnel: 5350 m Type of TBM: 2 LOVAT EPB, 1 Herrenknecht EPB Diameter of TBM: Each 6.5 m Twin Ripper Twin Disc Cutter Single Disc TBM Backup Equipments Knife General layout of ongoing metro projects in Istanbul Istanbul OTOGAR-KIRAZLI Metro Project Location: Istanbul GULERMAK-DOGUS Joint Venture Lenght of Tunnel: 5500 m Type of TBM: 1 Herrenknecht EPB 1 Lovat EPB Diameter of TBM: Each 6.5 m Twin Ripper Twin Disc Cutter Single Disc TBM Backup Equipments Knife Istanbul MARMARAY Project Location: Istanbul TAISEI-GAMA-NUROL Joint Venture Lenght of Tunnel: 9360 m Type of TBM: 2 HITACHI ZOHEN, 1 JTSC EPB Diameter of TBM: Each 7.0 m Single Disc Type 1 Single Disc Type 2 MELEN Project - Istanbul Location: Istanbul, Mosmetrostroy, Engeocom, Alke and STFA Joint Venture Lenght of Tunnel: 5500 m Type of TBM:Herrenknecht EPB Diameter of TBM: 6.15 m Twin Disc Cutter Single Disc Scraper Bucket Istanbul-Ankara High Speed Rail Project, Kosekoy Tunnel Location: Bilecik-Kosekoy, Cengiz, Ictas, Belen Joint Venture Lenght of Tunnel: 6100 m Type of TBM:Herrenknecht Single Shiled Diameter of TBM: 13.77 m Double Disc Cutter Scraper Knife Bucket Housing Twin Disc Single Disc Cutter Cutter ANKARA WATER II. MERHALE PROJECT-GEREDE Location: Gerede, Kolin Limak Joint Venture Lenght of Tunnel: 31600 m Type of TBM: 3 Herrenknecht Double Shiled Diameter of TBM: 5.40 m Twin Disc Cutter Bucket Single Disc Cutter ISTANBUL METRO PROJECT, USKUDAR-UMRANIYE Location: Istanbul, Dogus Const. Lenght of Tunnel: 22100 m by TBMs, 18700 m by NATM Type of TBM: 3 Herrenknecht Double Shiled Diameter of TBM: 6.30 m Double Disc Cutter Scraper Knife Bucket Housing Twin Disc Single Disc Cutter Cutter SURUC TUNNEL PROJECT Location: Sanliurfa, Ilci Const. Lenght of Tunnel: 17185 m Type of TBM: SELI Double Shiled Diameter of TBM: 7.80 m Double Disc Cutter Scraper Knife Bucket Housing Twin Disc Single Disc Cutter Cutter ANKARA METRO PROJECTS Under construction metro projects • Ankara Metro (M2, Kizilay-Çayyolu) - 16.6 km total length, 3.7 km by TBM and 2.9 km by NATM. • Ankara Metro (M3, Batikent-Torekent) - 16 km total length, 2 km by TBM and 6.6 km by cut and cover. • Ankara Metro (M4, Tandoğan-Kecioren) - 9.2 km total length, 4.2 km by TBM and 3 km by NATM. KARGI HEP PROJECT Location: Kargi-Corum, Gulermak Heavy Ind.Co. Lenght of Tunnel: 11800 m Type of TBM: Robbins Double Shiled Diameter of TBM: 10.00 m Twin Disc Cutter Single Disc Cutter Scrapper YAMANLI HEPP PROJECT Location: Adana, EnerjiSa-NTF Const. Lenght of Tunnel: 7900 m Type of TBM: Robbins Double Shiled Diameter of TBM: 4.40 m Double Disc Cutter Scrapper Twin Disc Cutter Single Disc Cutter DOGANCAY HEP PROJECT Location: Adana, EnerjiSa Atac,Hinteregger Joint Venture Lenght of Tunnel: 6900 m Type of TBM: Herrenknecht Double Shiled Diameter of TBM: 4.20 m Double Disc Cutter Bucket Twin Disc Cutter Single Disc Cutter KARAKUZ DAM and HEP PROJECT Location: Adana, Alarko-Altek Const. Lenght of Tunnel: 11000 m Type of TBM: 2 CAT Double Shiled Diameter of TBM: 3.00 m Double Disc Cutter Bucket Twin Disc Cutter Single Disc Cutter UPCOMING PROJECTS • - OVIT Tunnel Project; City : Rize Contractor : Makyol Const. Length : 30 km (2 x 15 km) Diameter : 12.50 m excavation Machine Type : 2 Gripper TBM 1850 m Raise Boring with 6 m diameter for ventilation shafts • - Silvan Tunnel Project; City : Diyarbakır Contractor : Yertas, Kayaoglu Joint Venture Length : 20.5 km (2 x 10.25 km) Diameter : 7.9 m excavation Machine Type : Double Shield TBM (Herrenknecht) • - Babakaya Tunnel Project; City : Diyarbakır Contractor : Unal Akpınar Const. Length : 10.4 km (2 x 5.2 km) Diameter : 7.9 m diameter Machine Type : Double Shield TBM (CAT) • - Beylerbeyi Wastewater Tunnel Project, City : Istanbul Contractor : Unal Akpinar Const. Length : 4680 m Diameter : 3.2 m excavation Machine Type : Single shiled • - Zeytinburnu Wastewater Tunnel Project, City : Istanbul Contractor : Unal Akpinar Const. Length : 4500 m Diameter : 3.2 m excavation Machine Type : EPB • Dogancay Tunnel Project (Ankara-Istanbul High Speed Rail Project); - City : Bilecik (Vezirhan-Kosekoy) - Length : 7.4 km - Diameter : 13.80 m excavation - Machine Type : EPB (expected) • - Bagbası Tunnel Project; City : Konya Contractor : Ilci Constr. Length : 18 km Diameter : 5.2 m excavation Machine Type : Double shiled TBM • Bosphorus Crossing Tunnel Project; - City : Istanbul, under the bosphorus - Contractor : Yapi Merkezi and SKEC-SamwhanHansin-Namkwang-Kukdong Joint Venture - Length : 3.34 km - Diameter : 13.70 m excavation - Machine Type : Herrenknecht Slurry TBM PROJECT DETAILS IN MIDDLE EAST As it is know that the Middle East market has quite big value of construction industry. About 80 per cent of the projects involving tunnelling are in the transport sector, including metro schemes in Cairo, Abu Dhabi, Baku, Tehran,Tel Aviv, Doha, Riyadh and Kuwait. Urban transport projects often for tunnelling as underground lines minimise disruption to the existing buildings and infrastructure of cities. More than $279 bn-worth of projects with a tunnelling element are currently planned or under way in the Middle East. With $76.2bn of new projects and extensions to existing lines planned in the Gulf and North Africa, the urban rail sector is set to offer significant opportunities for contractors in the region. If we have a look at tunnelling industry, we have seen that there are many projects which are under way and planning to built. Selected Planned Major Tunnelling Projects • Kuwait Metro Project, Sector: Rail Cost : 7 billion USD Scope : 160km metro network Client : Partnerships Technical Bureau Country : Kuwait Expected Tunnelling : TBM Tender Issue Date: Jul-12 • Inner Doha Resewerage Scheme, Sector : Water Cost : 2,5 billion USD Scope : Interceptor tunnel Client : Public Works Authority (Ashghal) Country : Qatar Expected Tunnelling : TBM Tender Issue Date : Dec-12 • King Faisal Tunnel, Sector: Road Cost : 500 million USD Scope : 2.5km underpass beneath King Faisal highway Client : Ministry of Public Works Country: Bahrain Estimated Tunnelling : Cut and cover Tender Issue Date : Jan-13 • Etihad Rail Phase 3, Sector : Rail Cost : 2,5 billion USD Scope : Final section of 1,200km network to Fujairah and Oman border Client: Etihad Rail Country: UAE Estimated Tunnelling: Drill and blast Tender Issue Date: Jan-13 • Oman National Railway, Sector : Rail Cost: 2,5 billion USD Scope : 1,370km network, starting with 230km line from Muscat to Sohar Client: Ministry of Transport Country: Oman Estimated Tunnelling : Drill and blast Tender Issue Date : Apr-13 • Mecca-Taif Road Tunnel, Sector : Road Cost : 533 million USD Scope : 11km road tunnel Client : Al-Tareek Investment & Development Company Country : Saudi Arabia Estimated Tunnelling : Cut and cover Tender Issue Date : Apr-13 • Abu Dhabi Metro, Sector : Rail Cost : 7 billion USD Scope : 131km network under Abu Dhabi, mainly tunnelled Client : Ministry of Transport Country : UAE Estimated Tunnelling : TBM Tender Issue Date : Jun-13 • Cairo Metro Line 4 , Sector : Rail Cost : 2,6 billion USD Scope : 24km metro linking Giza and Grand Museum to city centre Client : National Authority for Tunnelling Country : Egypt Estimated Tunnelling : TBM Tender Issue Date : Aug-13 • Cairo Metro Line 3 Phase 3 , Sector : Rail Cost : 1 billion USD Scope : 16.6km, mainly underground, extending current Line 3 Client : National Authority for Tunnelling Country : Egypt Estimated Tunnelling : TBM Tender Issue Date : Third quarter 2012 • Baghdad Metro Project, Sector : Rail Cost : 3 billion USD Scope : 39km city centre metro network Client : Baghdad Municipality Country : Iraq Estimated Tunnelling : TBM Tender Issue Date : Dec-13 • Tehran Metro Lines 8,9 and Express Lines, Sector : Rail Cost : 10 billion USD Scope : 179km expansion of existing system by 2025 Client : Tehran Metro Company Country : Iran Estimated Tunnelling : TBM Tender Issue Date : First quarter 2018 • Al-Hayer Wastewater Project, Sector : Water Cost : 100 million USD Scope : Two 37km 3,000mm wastewater tunnels Client : National Water Company Country : Saudi Arabia Estimated Tunnelling : TBM Tender Issue Date : Bids under evaluation Selected Major Tunnelling Projects Under Way • Abu Dhabi Road Tunnels Project, Sector : Road Cost : 817 million USD Scope : Three road tunnels and two flyovers improving road access to Port Zayed Status : Under construction Country : UAE Client : Abu Dhabi Municipality Proposed Completion Date : May-12 • Qatar Education City Utilities Tunnel, Sector : Water Cost : 184 million USD Scope : 9km utility tunnel for Education City services Status: Under construction County : Qatar Client :Qatar Foundation Proposed Completion Date : May-12 • Dammam University Tunnel Project, Sector : Road Cost : 66 million USD Scope : 30km connection between university and hospital Status : Under construction Country : Saudi Arabia Client : Ministry of Higher Education Proposed Completion Date : Oct-13 • Riyadh Road Tunnels, Sector : Road Cost : 55 million USD Scope : Two road tunnels in Riyadh Status : Under construction Country : Saudi Arabia Client : Riyadh Municipality Proposed Completion Date : Apr-14 • Muharraq Wastewater Treatment Project, Sector : Water Cost : 250 million USD Scope : New facility including 20.9km gravity sewer Status : Under construction Country : Bahrain Client : Muharraq STP Company Proposed Completion Date : Oct-14 • Abu Dhabi Step, Sector : Water Cost : 1,6 billion USD Scope : 41km water storage tunnel Status: Under construction under three tunnelling packages Country : UAE Client : Abu Dhabi Sewerage Services Co. Proposed Completion Date : Dec 2014 • Etihad Rail Project, Sector : Rail Cost : 11 billion USD Scope : 1,200km network including six tunnels Status : Phase 1 under construction Country : UAE Client : Etihad Rail Proposed Completion Date : Jan-18 • Azer Korpu Baku Metro Project, Sector : Rail Cost : 600 million USD Scope : Under Construction, 12200 m length in total with 6.5 m 2 EPB (1 Herrenknecht, 1 Robbins) Country : Azerbaijan Proposed Completion Date : 2015 • Tel Aviv – Jeruselam High Speed Rail Project, Sector : Rail Scope : Under construction, 21000 m length in total, 1 Herrenknecht EPB and 2 double shiled with 10.3 m diameter. City : Tel Aviv Proposed Completion Date : 2015 • Tel Aviv Metro Project, Sector : Rail Cost : 12 billion USD Scope : Under construction, 23 km Red Line with 6.5 m diameter, 35 km Green Line with 6.5 m diameter Country : Israel Client : Metropolitan Mass Transit System Ltd. Proposed Completion Date : 2017 CONCLUSION According to growing population and increasing economic opportunities in rapidly developing countries, especially infrastructure investments in are gaining more and more importance. In this context, local administrations have been planing to invest more for metro, rail, road, clean and waste water tunnel projects as it is seens in this presentation. As one of the companies that related in TBM industry , we would like to be also one of the solution partners for each single project. ANY QUESTION ??? THANK YOU