The Manufacturing Infrastructure This presentation is company confidential and can not be shared with any third party without prior Written authorization. Manufacturing Components Design Management; Planning; Quality; Vendor Management; Infrastructure. Design Management Design Management Parts & Vendors Software for Items (Software/Hardware/COTS etc.); ECOs; RFQ; Vendors; POs. Production Planning Planning FileMaker Pro Software for; MRP; Inventory; Job Orders; Procedures; Quality Reports; In Process Testing and Inspection; Shipping; Sales Order Management; Customer Management. Vendor Management Vendor Management Vendor Qualification; Vendor engagement from Start; Vendor Training; Quality Training; Parts Delivery; Vendor Evaluations. Suppliers BARE PCB MAGNETS (Ferrite) PCB ASSEMBLY EXTRUSION Falco STACKED ROTOR & STATOR HARDWARE DIE CAST PARTS MACHINE PARTS 6 Supply Chain Most suppliers located within 100km; Quick feedback to the suppliers for corrective actions; Minimum Shipping Time; Minimum Freight Costs; Shorter Lead Costs. 7 ISO 9001 ISO 9001:2008 Certification in process; ISO 9001:2008 Certification in the next 6 months; Falco eMotors Business Profile Manufacturing and R&D Location One of biggest Industrial bases in Asia. Major companies such as Tata Motors, Mahindra & Mahindra, BMW, Mercedes, Volkswagen etc. manufacture here. Facility 4000 Sq. Ft. 24 Hour Video Surveillance; Card Access; Conference Room 2 The Place Offices R&D Conference Room 1 Lunch Room Manufacturing Area Storage Laboratory Inventory & Quality Control The Place The Building The Building The Place Conference Room Offices Sumanta Mohanty – VP, Software Engineering Inventory and Quality Control Manufacturing Area Manufacturing Area Production Testing Automated Motor Thermal Testing Automated Stator Thermal Testing Motor Test Stand Torque Capabilities – 0 - 150Nm (Direct); Speed Capabilities – 0 – 6000 rpm. Motor Press Pneumatic Press for Motor Assembly and Bearing Installation Manufacturing Infrastructure 20 Manufacturing Stations; Electrostatic Discharge Protection; Bearing Fixture; Motor Installation Press Fixture; Automated Test Fixtures; Stator Thermal Test Fixtures; Motor Thermal Test Fixture; 150Nm Test Stand. In process QC List of Instruments Go/No-Go Gauge; Digital Micrometer; Dial Gauge Indicator & Surface Plate; Digital Vernier Caliper; V-Block & Holding Clamps; Visual Inspection; PCB Test Fixture; Stator Test Fixture; Motor Test Fixture; 25 Outgoing QC Torque Testing; Power Testing; Performance Testing; Functional Testing; Heat Test (Stator Level); Heat Test (Motor Level); Visual Inspection; Final Quality Checklist. 26 Packaging Packaging