SCOHTS Meeting June 15-17, 2011 Completed NCHRP Projects Work Plan for the 2nd Edition of the Highway Safety Manual [Project 207(279)] Highway Safety Training Synthesis/Roadmap [Project 20-7(290)] Completed NCHRP Projects Analysis of usRAP Benefits [Project 20-07(297)] Highway Safety Manual Implementation and Training Materials (Project 17-38) Almost Completed NCHRP Projects Evaluation of Safety Strategies at Signalized Intersections (Project 17-35) Development of Guidance for the Selection, Use, and Maintenance of Cable Barrier Systems (Project 22-25) NCHRP Funding (est.) - $ 31.7 M Safety Projects - $ 5.6 M FY2012 FY2012 Approved NCHRP Safety Projects 12-90 – Guidelines for Design and Shielding of Bridge Piers 17-55 – Guidelines for Slope Traversibility 15-45 – Update of the AASHTO Pedestrian Guide FY2012 Approved NCHRP Safety Projects 17-56 – Development of Crash reduction Factors for Uncontrolled Pedestrain Crossing Treatments 03-106 – Guidelines for Traffic Control Devices on Curves FY2012 Approved NCHRP Safety Projects 07-18 – Crash Experience Warrant for Traffic Signals 17-57 – Development of an Improved Metric for Serious Traffic Crash Injuries 17-58 – Safety Prediction Models for SixLane and One-Way Arterials for the HSM FY2012 Approved NCHRP Safety Projects 17-59 – Safety Impacts of Intersection Sight Distance 07-19 – Innovative Methods to Obtain Pedestrian and Bicycle Volume Data 17-60 – Cost-Benefit Metrics for Behavioral highway Safety Countermeasures FY2012 Approved NCHRP Safety Projects 17-61 – Effect of Work Zones on Crash Risks and Guidance on Countermeasures Synthesis – Models for Effective Emergency Responses within “the Golden Hour” in Rural Areas CRP Homepage http://www.trb.org/crp/about/divd.asp Information on CRP Programs Search Engine All research Projects since 1988 Project Statements (requests for proposals) Anticipated projects CRP publication lists and how to order them Registration form for receipt of RFPs