Eionet NFP Meeting 28/29 September 2011 European Environment Agency Eionet NFP Meeting Sep 2011 - Objectives of NRC-SOE Workshop • To reassert the role of the NRC-SoE network. • To review the state of SoE reporting across Europe. • To reflect on the use of environmental indicators in SoE reports. • To strengthen links between national and European SoE reports. • To reflect on how to incorporate forward-looking information. • To initiate discussions towards SOER 2015. • PLUS: To share ‘established practice’ within network! Eionet NFP Meeting Sep 2011 - Outline of NRC-SOE Workshop • Session 1 - Introduction & stock-taking • Session 2 - Reasserting the role of the NRC-SoE network • Session 3 - Reviewing national-level SoE reports - Country presentations: CS, HR, MN, NL, PL, RS • Session 4 - Recap of Day 1 • Session 5 - Using indicators in SoE reports - Country presentations: BH, DE, NL, RS, SI • Session 6 - Establishing links between SoE reports • Session 7 - Using forward-looking information in SoE reports - Country presentations: AT, BE • Session 8 - Learning lessons: ideas for SOER 2015 • Session 9 - Wrap-up Eionet NRC-SOE Workshop 2011 - From SOER 2010 to SOER 2015 • Content & coverage • Structure & approach • Indicators & types of information • Process & network 2010 2011 2012 2013 2014 2015 Eionet NFP Meeting Sep 2011 - EEA SOE reports and other SOE reports Global level European level National level ... Sub-national level ‘State of Environment‘ Assessments Biodiversity Climate Assessments Water Assessments Thematic Assessments Assessments Note: Indicators (i.e. the toblerone‘s ‘scaffolding‘) are the basis of environmental assessments (i.e.the toblerone‘s ‘chocolate‘) Eionet NFP Meeting Sep 2011 - SERIS to share ‘established practices‘ (Session 2 & 3) SERIS is a shared library of NRC-SOE. Only for about half of the countries SERIS is up-to-date. Countries stressed that SERIS is useful for their national SOE reporting. Agreement to keep SERIS. Agreement to add more information about reports (‘review template’). Eionet NFP Meeting Sep 2011 - Review of EEA indicators (Session 5 & 6) Four distinct but inter-connected EEA activities were highlighted at the Management Board in March 2011 & June 2011: (1) Cleaning the EEA indicators to remove redundancies and duplications and ensure improved access to them on the website; (2) Mapping the EEA indicators and their status related to their technical, conceptual and political context; (3) Continuance of indicator-based state of environment reporting in member countries as part of the SOER follow-up process; and (4) Reviving the annual publication of an indicator-based crosscutting assessment. Eionet NFP Meeting Sep 2011 - Using forward-looking information in SOE (Session 7) Fundamental dilemma: How to combine indicator-based information that aim to offer a degree of certainty - with forward-looking perspective that aims to embrace / structure uncertainty Eionet NRC-SOE Workshop 2011 - From SOER 2010 to SOER 2015 (Session 8) • Content & coverage • Structure & approach • Indicators & types of information • Process & network 2010 2011 2012 2013 2014 2015 Preliminary Reflections towards SOER 2015 - Content & Coverage What to address in SOER 2015 ... • Logic - DPSIR still the entry point?, link to ‘strategic assessments’ ? • Topics - green economy, lifestyles, environment & equity, hazards, ... • Style - more ‘storytelling’, show positive messages, identify users ... • Perspective - long-view (backwards and forward), action-related ... Preliminary Reflections towards SOER 2015 - Structure & Approach How to develop SOER 2015 ... • Identify users - adapt structure to audience, define ‘personas’, ... • Communication - social media, apps, several comm. strands, ... • Benchmark - country comparison, state of action ... • Integrate prospective analysis Preliminary Reflections towards SOER 2015 - Indicators & Type of Information What to link across scales ... • (Key) indicators! • (Key) indicators! • (Key) indicators! • Composite indicators - transparency important, use if available, ... • Methods - common template, uncertainty, spatial indicators ... Preliminary Reflections towards SOER 2015 - Process & Network How to link across scales ... • SERIS - keep SERIS!, add review template, clarify AoA vs SERIS, ... • SENSE - link indicators (but which and which elements still open) ... • NRC network - facilitate crossfertilisation (SOE; FLIS; EIS; Comm) • Project plan - develop a project plan on how to link across scales as part of SOER 2015, ... Eionet NRC-SOE - What next? • Reflect on outcome(s) of this NRC-SOE meeting, and maintain more regular dialogue (e.g. on indicators, ...) • Upgrade SERIS (i.e. include a modified ‘review template’ for SOE reports to enhance the usefulness of the library). • NRC-SOE to review ‘Annual Indicator Report’ (consultation now scheduled for Nov/Dec). • EEA to develop plan with NRC-SOE for linking (key) indicators across scales, after EEA indicator mapping exercise. • Value in linking NRC-SOE workshops with other NRC workshops (e.g. with FLIS, EIS, Communication). • Next meeting early in spring 2012, annual thereafter.