Implementing risk based maintenance concepts. Leen Vooijs Performance contract TOC’s Lack of Budget 35-40 % less failures in 2005 Present situation in the Netherlands More preventive maintenance Maintenance manager Output Maintenance Contracts ProRail - ambities in railinfra / Decreasing knowledge Lack of information 2 What will be the cost of a better performance? How do we ensure the contracted performance? Why is maintenance so expensive? What are the effects of cutting budgets? What do we have to pay for 1% more availability? What are the best actions to be taken to improve performance? Maintenance manager ProRail - ambities in railinfra / 3 Essence of these questions: What is the (quantitative) relation between maintenance(cost) as input and performance of infrastructure as output ? And how to manage this relation ? ProRail - ambities in railinfra / 4 How to answer that question? Looking for a systematic approach to link maintenance activities to performance. Based on risks Usable for evaluation and planning. ProRail - ambities in railinfra / 5 Using the FMECA. Object Failure mode Causes Effect Criticality analysis Preventive activities Repair activities ProRail - ambities in railinfra / Maintenance concept Model 6 Simulation and results (prediction) ProRail - ambities in railinfra / 7 Comparing scenario's Without Preventive maintenance: With Preventive maintenance: ProRail - ambities in railinfra / 8 Supports maintenance engineer in: Pointing critical installations/components Setting of inspection frequencies When preventive maintenance has to be done Object / of components/installations Risk Risk When modification part (cost) (Availability) will be effective Moment a disturbance occurs. Condition (t) % 100 80 Cable Casing Light ProRail - ambities in railinfra / 0 f(t) 0 64 64 2 Lead-Time Actual Optimizer 216 1 432 t t μ = MTTF μ = MTTF 9 Year activity proposal ProRail - ambities in railinfra / 10 Basis for activities. Rules and regulations will be based on risks. Proposals for modification of installations, methods of regulation will be based on analysis of risks referring to usage. Effect: the risks and the effects are subject of discussion, not the activities itself. ProRail - ambities in railinfra / 11 Relation with contractors (1). Performance specifications ProRail Defining necessary activities Execution of activities Performance results ProRail - ambities in railinfra / Contractor In this area ProRail and the contractor have to discuss improvements, methods and activities. 12 Relation with contractors (2). • Discussing improvements, methods and activities is: • MAINTENANCE ENGINEERING. • And risk based maintenance concepts will be the common language. ProRail - ambities in railinfra / 13 Actual status. Generic concepts for 18 objects available. Maintenance concepts still to be implemented. Discussion about how to use maintenance concepts in maintenance contracts Optimisation to be started. ProRail - ambities in railinfra / 14 Thank you for your attention Any questions ? ProRail - ambities in railinfra / 15