BASS Asia Customer Forum, 26-27th November 2013 Mandarin Oriental, Kuala Lumpur BASSnet 2.9 Safety Management Document Manager & Operations Business Applications and Solutions for Shipping Agenda Date 11/26/2012 Start Time End Time Duration 1100 1120 20 mins 1120 1300 1400 1530 1 hrs 30 mins 1545 1730 1 hour 45 mins 0945 1030 45 mins Details Introduction of Safety Management Systems Tuesday 11/27/2011 1hr 40 mins BASSnet SAFIR BASSnet SAFIR (cont) BASSnet Risk Manager BASSnet Reviews and Improvements Wednesday 2 hours 15 mins BASSnet Document Manager 1045 1300 1400 1600 2 hours 1600 1700 1 hour BASSnet Operations Recap of modules Q&A Sessions 2 SAFIR - A Streamlined Approach to Safety Management System 3 SAFIR - New Features Ability to carry-out Failure Mode Effect Analysis (FMEA) calculations Able to connect Events to Defects and Claims New planner for the Audits/ Inspections and Vetting Ability to revise checklist Ability to link SAFIR Reports to Reviews and Improvements Ability to track costing of Vettings Improved Statistics and Search 4 Safety Management System Process Flow 5 Event Simplified Workflow Ship Shore Office Open New Create New Report Analyze Root Cause & assign Follow-up Open Carry out Follow up Actions Ready to Close Review and Verify Closed Historical Reference 6 BASSnet 2.8 – Vetting Module Organize and plan for continuous approval Prepare vessels for the Vetting Inspections Clear visibility of all observations and outstanding issues Lesson learnt – as feedback to the fleet Statistics and reports – for continuous improvement Re-planning to ensure continued approval 7 BASSnet 2.8 – Vetting Process 8 BASSnet 2.8 – Vetting Process 9 Training and Drills Process Workflow 10 BASSnet Risk Management 11 Risk Management - New Features Introduction of a Wizard based workflow New review and approval process Ability to detach risk from Safety Events Ability to force residual risk assessments from vessel users Enhanced Risk Assessment Reports 12 Risk Manager Process Flow 13 BASS Asia Customer Forum, 26-27th November 2013 Mandarin Oriental, Kuala Lumpur BASSnet 2.9 Safety Management Document Manager & Operations Business Applications and Solutions for Shipping Agenda Date 11/26/2012 Start Time End Time Duration 1100 1120 20 mins 1120 1300 1400 1530 1 hrs 30 mins 1545 1730 1 hour 45 mins 0945 1030 45 mins Details Introduction of Safety Management Systems Tuesday 11/27/2011 1hr 40 mins BASSnet SAFIR BASSnet SAFIR (cont) BASSnet Risk Manager BASSnet Reviews and Improvements Wednesday 2 hours 15 mins BASSnet Document Manager 1045 1300 1400 1600 2 hours 1600 1700 1 hour BASSnet Operations Recap of modules Q&A Sessions 15 BASSnet Reviews and Improvement 16 Reviews & Improvements - New Features Ability to link SAFIR reports to meeting agendas Ability to pick participants from Crew List Renaming of Change Management Ability to save layouts in Overviews Ability to archive old meetings Ability to conduct discussions on Review Meetings 17 Reviews and Improvement Process Flow 18 TMSA Process Flow 19 BASSnet Document Management 20 Document Manager - New Features Ability to search within folders Ability to set default visibilities at the folder level Distribute document while adding in the system Enhanced search function across multiple categories New notification for unread documents Introduction of the Port Form Management module 21 BASSnet 2.8 – Document Management Process Flow 22 Document Review and Approval 23 Port Form Management BASSnet Forms Manager Customer BASS Receives forms from other sources for setup Office Vessel Receives forms from customers for setup Vessel Receives forms for new ports not available in the system Import forms in Forms Manager Setup and make links to BN DB Package and send to Customer Receive and Import forms package Verify, link it to ports or other records and distribute to vessels Distribute Available to all vessels for use (linked to Ports Register) and integrated to BASSnet modules for auto population 24 BASSnet Operations 25 BASSnet Operations - New Features Additional fields in Vessel Particulars Enhancements for Certificates New Ship Log New logs for Ozone Depleting Substances and Sewage Discharge Enhancements with the Work and Rest Hours timesheets and rules Introduction to new Environmental Management module 26 Managing Vessel Certificates – Process Flow 27 Managing Vessel Voyage – Process Flow 28 Environmental Management 29 Thank You www.bassnet.no sales@bassnet.no 30 Thank you. www.BASSnet.no Contact@BASSnet.no 31