NAV10 (ppt) - Eurocontrol

advertisement
Objective NAV10
ESSIP Plan 2014
Adriatik KOKONA
DSS/EIPR
19.09.2014
Objective NAV10










Comprehensive Explanation
What is new or has changed since LSSIP 2013
Link to European ATM Master Plan
Most important SLoA(s)
Finalisation Criteria and Closed Questions
Supporting Material
ESSIP Report 2013
Objective Coordinator’s Analysis, recommendations, tips & tricks
Conclusions
Links and contacts
ESSIP Plan 2014 / Objective NAV10
2
Comprehensive Explanation
Implement APV procedures;
 The intention is to transition from conventional NPA to APV
procedures;
 The primarily objective to enhance safety but there are potential
benefits in terms of reduced minima and better access to airports
without precision approach and landing capabilities;
 Type: - SESAR;
 Scope: – ECAC;
 Applicability – All ECAC States;
 Implementation Schedule – 06/2011- 12/2016
ESSIP Plan 2014 / Objective NAV10
3
What is new or has changed since LSSIP 2013
 Align the FOC dates of REG01, USE01 and USE02 with the FOC
date at objective level (12/2016)
ESSIP Plan 2014 / Objective NAV10
4
Link to European ATM Master Plan
 OI step - [AOM-0602-A]-Enhanced terminal operations with APV
using Barometric VNAV. ESSENTIAL;
 OI step - [AOM-0602-B]-Enhanced terminal operations with LPV
using SBAS ESSENTIAL
ESSIP Plan 2014 / Objective NAV10
5
Most important SLoA(s)
 NAV10-ASP01: Design and Publish APV/Baro and/or APV/SBAS
procedures;
 NAV10-ASP03: Develop National safety case for APV/Baro
operations and/or APV/SBAS operations.
ESSIP Plan 2014 / Objective NAV10
6
Finalisation Criteria and Closed Questions
 NAV10-ASP01: APV/Baro and/or APV/SBAS Procedures have been
implemented in accordance with guidance material, published in the
National AIP and are in use. Is the procedure published in the
national AIP and is it BARO or SBAS Procedure? If not when is it
planned to be developed and published?
 NAV10-ASP03: National Safety case for APV/Baro and/or
APV/SBAS produced and an operational approval issued by the
regulator. Is the National safety case for APV/Baro operations
and/or APV/SBAS operations developed and approved?
ESSIP Plan 2014 / Objective NAV10
7
Supporting Material






EASA AMC 20-27. Url : https://www.easa.europa.eu/agencymeasures/docs/agency-decisions/2009/2009-019-R/Annex%20III%20%20AMC%2020-27.pdf
EASA AMC 20-28. Url : http://www.easa.eu.int/agencymeasures/certification-specifications.php#AMC-20
ICAO PANS-OPS (Doc 8168) Url :
http://www2.icao.int/en/Home/Pages/Publications.aspx
FAA - AC 20-138C - Airworthiness Approval of Positioning and Navigation
Systems 05/2012 Url :
http://www.faa.gov/regulations_policies/advisory_circulars/index.cfm/go/doc
ument.list/parentTopicID/101;
FAA - AC 90-105 - Approval Guidance for RNP Operations and Barometric
Vertical Navigation in the U.S. National Airspace System 01/2009 Url :
http://www.faa.gov/regulations_policies/advisory_circulars/index.cfm/go/doc
ument.list/parentTopicID/128;
ICAO - Doc 9613 - Performance-based Navigation (PBN) Manual - Edition
4 / 03/2013 Url : http://www.icao.int/publications/Pages/catalogue.aspx
ESSIP Plan 2014 / Objective NAV10
8
ESSIP Report 2013
 1 State has reported the objective as ‘Completed’, 6 States ‘Partially
Completed’, 23 ‘Planned’ and 1 ‘Not Applicable’. 11 States have not
developed planned for implementation but are considering the
implementation;
 30 States that have planned to implement the objective will complete
it by the FOC of the ESSIP.
ESSIP Plan 2014 / Objective NAV10
9
Objective Coordinator’s Analysis,
recommendations, tips & tricks
 As the objective is applicable to all instrument runway ends, states
shall provide the implementation plans, the type of procedures and
completion dates per each airport in the states;
 There are a number of states which have only ‘tentative’ plans and
have reported the objective as ‘Planned’. As no agreed/formal plans
exist yet, I would propose to change the status to ‘No Plan’.
ESSIP Plan 2014 / Objective NAV10
10
Conclusions
 Airworthiness Approval and Operational Criteria for RNP
APPROACH (RNP APCH) Operations including APV Baro-VNAV
Operations (EASA AMC 20-27) has already approved and published
in Dec 2009;
 Airworthiness Approval and Operational Criteria for RNP
APPROACH (RNP APCH) Operations including APV SBAS
Operations (EASA AMC 20-28) has already approved and published
in Sep 2012;
ESSIP Plan 2014 / Objective NAV10
11
Links and contacts
 Objective Coordinator:
Kokona Adriatik, +32 2 729 3556
adriatik.kokona@eurocontrol.int

Farnworth Richard, +33 (0)1 69887651
DSR Objective Expert:
richard.farnworth@eurocontrol.int
ESSIP Plan 2014 / Objective NAV10
12
Download