Measure L Bond Program

March 12, 2013

Danner Safety (Air Quality Study)

Overview:

The project consists of investigating and evaluating ways to improve the air quality by the improvement of air circulation within the occupied spaces adjacent to the loading docks.

Danner Safety (Air Quality Study)

Where: Project Location

Danner Safety (Air Quality Study)

Original Project Information:

Area:

Contract Award:

N/A g.s.f.

June 2013

Complete Construction: September 2013

Architect: Dougherty & Dougherty

Contractor: To be determined

Danner Safety (Air Quality Study)

Current Project Status:

Budget:

Schedule:

Change Orders:

General Problems:

Safety Problems:

On Budget

On Schedule

N/A

None

None

Danner Safety (Air Quality Study)

Project Budget and Expenditures

Danner Safety

Site ADP

Group II Equip

Design

Project/Program Management

Construction - Indirect

Construction - Direct

Other

Total

Budget

-

42,396

53,631

52,878

17,382

423,962

9,751

600,000

Actual

Expended

-

-

33,750

7,941

5,091

-

-

46,782

Balance

-

42,396

19,881

44,937

12,291

423,962

9,751

553,218

Danner Safety (Air Quality Study)

When: Project Schedule

Forum Classroom Renovations

Overview:

The project consists of renovating three classrooms within the Forum Building to include meeting accessibility compliance codes, carpet and seating replacement, and upgrading the finishes throughout the classrooms.

Forum Classroom Renovations

Where: Project Location

Forum Classroom Renovations

Original Project Information:

Area:

Contract Award:

5,600 g.s.f.

April 2013

Complete Construction: August 2013

Architect: Lionakis

Contractor: To be determined

Forum Classroom Renovations

Current Project Status:

Budget:

Schedule:

Change Orders:

General Problems:

Safety Problems:

On Budget

On Schedule

N/A

None

None

Forum Classroom Renovations

Budget and Expenditure Report:

Forum Classroom Renovation

Site ADP

Group II Equip

Design

Project/Program Management

Construction - Indirect

Construction - Direct

Other

Total

Budget

-

148,898

376,712

277,303

92,317

2,977,960

17,434

3,890,624

Actual

Expended

-

-

179,140

33,463

5,577

-

-

218,180

Balance

-

148,898

197,572

243,840

86,740

2,977,960

17,434

3,672,444

Forum Classroom Renovations

When: Project Schedule

Holt Building/Budd Shop Renovations

Overview:

This project scope consists of general building renovations to the shops and classrooms in the Holt and Budd buildings. This consists of upgrades to meet accessibility compliance and fire codes and updates to the existing utility infrastructure to current District standards.

Holt Building/Budd Shop Renovations

Where: Project Location

Holt Building/Budd Shop Renovations

Original Project Information:

Area:

Contract Award:

52,000 g.s.f.

August 2014

Complete Construction: December 2015

Architect: To be determined

Contractor: To be determined

Holt Building/Budd Shop Renovations

Current Project Status:

Budget:

Schedule:

Change Orders:

General Problems:

Safety Problems:

On Budget

Assessment

N/A

None

None

Holt Building/Budd Shop Renovations

Project Budget and Expenditures

Holt & Budd Shop Renovation

Site ADP

Group II Equip

Design

Project/Program Management

Construction - Indirect

Construction - Direct

Other

Total

Budget

-

3,479,236

4,401,234

1,709,217

1,496,072

34,792,364

121,877

46,000,000

Actual

Expended

-

-

-

10,000

-

-

-

10,000

Balance

-

3,479,236

4,401,234

1,699,217

1,496,072

34,792,364

121,877

45,990,000

Holt Building/Budd Shop Renovations

When: Project Schedule

Math and Science (New Construction)

Overview:

The construction consists of a new three story math/science complex including a 70,000 sf laboratory core, with primarily dry labs on the first floor, wet Biology labs on the second floor, and chemistry labs on the third floor. There is 20,000 sf of office space and 20,000 sf of classrooms on each floor dedicated to each discipline, primarily in separate zones. The labs wrap around a central service core consisting of tech offices, lab preparation rooms, and lab storage rooms. Students will enter the labs from the opposite side of the central service core providing safe separation of students and chemicals. Student break-out spaces, computer labs, and a resource center for studying and tutorial sessions will be provided.

During the programming and planning effort the building was sited north of the existing Shima Center. This location was chosen due to its proximity to public and student parking for easy access to the proposed future Planetarium and the Math/Science building, as well as a separate service drive for easy access to the labs. The new building replaces an outdated 92,000 sf science building currently in use. The exterior building’s form, materials and colors reflect a modern interpretation of the “Village” character of the existing campus buildings. This is a State funded project with a 50% match with local funds.

Math and Science (New Construction)

Where: Project Location

Math and Science (New Construction)

Original Project Information:

Area: 110,000 g.s.f.

Contract Award: January 2010

Complete Construction: March 2013

Architect:

Contractor: tBP

Taisei

Math and Science (New Construction)

Current Project Status:

Budget: On Budget. Project is 50% state funded.

Schedule: Revised Completion Date for Phase I is March 2013

Change Orders: 25

General Problems: N/A

Safety Problems: N/A

Math and Science (New Construction)

Project Budget and Expenditures

Math and Science Building

Site ADP

Budget

292,949

Group II Equip

Design 3,923,413

Project/Program Management 1,524,975

Construction - Indirect

888,188

4,450,143

Construction - Direct

Total

35,794,643

46,874,311

Actual

Expended

292,949

114,269

3,893,318

1,344,033

3,419,892

19,248,688

28,313,149

Balance

-

773,919

30,095

180,942

1,030,251

16,545,955

18,561,162

Math and Science (New Construction)

When: Project Schedule

Math and Science

Manteca Barn, Shade, and Fence

Overview:

The project entails the new construction of a preengineered metal building to serve as a barn, laboratory, & teaching facility. The new barn will have a canopy and new perimeter fencing enclosing the rear of the structure to facilitate the herding of livestock.

Manteca Barn, Shade, and Fence

Where: Project Location

Manteca Barn, Shade, and Fence

Original Project Information:

Area: 3600 g.s.f.

Contract Award: August 2013

Complete Construction: March 2014

Architect:

Contractor:

ANOVA

To be determined

Manteca Barn, Shade, and Fence

Current Project Status:

Budget:

Schedule:

Change Orders:

General Problems:

Safety Problems:

On Budget

Project has been put on hold

N/A

None

None

Manteca Barn, Shade, and Fence

Project Budget and Expenditures

Manteca Barn, Shade, & Fence

Site ADP

Group II Equip

Design

Project/Program Management

Construction - Indirect

Construction - Direct

Other

Total

Budget

-

25,434

106,964

49,518

26,842

716,216

10,026

935,000

Actual

Expended

-

-

24,129

10,637

-

-

-

34,766

Balance

-

25,434

82,835

38,881

26,842

716,216

10,026

900,234

Manteca Barn, Shade, and Fence

When: Project Schedule

Shima Heavy Equipment / Diesel Expansion

Overview:

This project provides for a modest expansion of the

Shima Center in order to expand the heavy diesel engine, hydraulics and repair program, and to allow the auto program to expand in Holt. The expansion includes additional shop space, an exterior open air laboratory and a new diesel laboratory shop area.

Shima Heavy Equipment / Diesel Expansion

Where: Project Location

Shima Heavy Equipment / Diesel Expansion

Original Project Information:

Area: 12,000 g.s.f.

Contract Award: November 2012

Complete Construction: January 2014

Architect:

Contractor:

Lionakis

Seward L. Scheder

Shima Heavy Equipment / Diesel Expansion

Current Project Status:

Budget:

Schedule:

Change Orders:

General Problems:

Safety Problems:

On Budget

On Schedule

N/A

None

None

Shima Heavy Equipment / Diesel Expansion

Budget and Expenditure Report:

Shima Heavy Equipment & Diesel Expansion

Site ADP

Group II Equip

Design

Project/Program Management

Construction - Indirect

Construction - Direct

Total

Budget

-

959,782

1,214,124

782,818

745,456

9,597,820

Actual

Expended

-

3,101

662,930

105,922

488,621

153,710

Balance

-

956,681

551,194

676,896

256,835

9,444,110

13,300,000 1,414,284 11,885,716

Shima Heavy Equipment / Diesel Expansion

When: Project Schedule

Stockton Campus Restroom Renovations

Overview:

The scope will consist of renovating several restrooms on campus to meet current building codes and update fixtures to the District’s current standards. The restrooms scheduled for the renovation are contained within the following buildings: Administration, Atherton, Budd, Danner,

Forum, Locke, and Shima.

Stockton Campus Restroom Renovations

Where: Project Location

Stockton Campus Restroom Renovations

Original Project Information:

Area:

Contract Award:

Complete Construction:

Architect:

Contractor:

N/A g.s.f.

April 2013

September 2013

Lionakis

To be determined

Stockton Campus Restroom Renovations

Current Project Status:

Budget:

Schedule:

Change Orders:

General Problems:

Safety Problems:

On Budget

Project Bidding

N/A

None

None

Stockton Campus Restroom Renovations

Budget and Expenditure Report:

Stockton Campus-Wide

Restroom Renovation

Site ADP

Group II Equip

Design

Project/Program Management

Construction - Indirect

Construction - Direct

Other

Total

Budget

-

-

195,473

191,933

63,355

1,545,239

4,000

2,000,000

Actual

Expended

-

-

101,344

-

26,036

-

-

127,380

Balance

-

-

94,129

191,933

37,319

1,545,239

4,000

1,872,620

Stockton Campus Restroom Renovations

When: Project Schedule

Question and Answer