St. Louis Airport Authority (SLAA) Airport Experience Project Kwame Building Group Program Manager Yaphett El-Amin MWBE Program Manager SLAA Airport Experience Minority Goals-25% Women Goals-5% for Design and Construction Projects • Work Completed within Two Phases – Phase 1 • Gateway Monuments and Wayfinding • Terminal Renovation • Concourse Renovations – Phase 2 • Arrivals Drive • Canopy Airport Experience Project Phase 1 • Seven Design Elements – – – – – – – Ticketing Dome Ceilings* Entry Monuments and Access Roadway Signs* Bag Claim Carrousels and In-Feed Conveyors Terminal Architectural Renovations* Terminal MEPSS Renovations and Improvements* Concourse Architectural Renovations Concourse MEPSS Renovations and Improvements • Design continuing through 2008 with Construction packages in 2008-2010 * represents packages with selected design firms Ticketing Dome Ceilings • • • • Re-surface interior of four (4) domes Smooth surface painted in a bright white Repair skylight frames (as necessary) Alternate to replace skylights with more transparent material • Teng and Associates Design Firm Entry Monuments & Access Roadway Signs • Install three (3) monuments on Interstate-70 at Cypress, Airflight and East Entry • Coordinate regional wayfinding with MoDot • Provide new roadway signage scheme along Lambert Blvd. and Airflight Drive • Apple Designs Design Firm In-Bound Bag Claim Devices and Conveyor Feeds-Design Build • Demo and replace six existing in-bound passenger bag claim devices and two (2) oversize claim devices • Demo and replace conveyor feeds from ramp • Install air curtains to reduce drafts and odors • Re-do existing architecture above bag claim devices to visually open hall • Electrical infrastructure upgrades to support new conveyors and carousels Terminal Architectural Renovations • Ticketing Hall, Mid-Level Departures Hall and Baggage Claim-Arrivals Hall • Floor, wall and ceiling coverings and finishes • Renovated restrooms + two new Mid-Level restrooms • Relocated C/D Security Checkpoint • Post-security food and retail node • New ticketing case work, back walls and video monitors • New baggage service offices • Wayfinding signage • Teng & Associates Design Firm Terminal Mechanical, Electrical, Plumbing and Special Systems Renovations • Ticketing Hall, Mid-Level Departures Hall and Baggage Claim-Arrivals Hall • MEPSS benchmarking, renovations and enhancements • Lighting, HVAC, plumbing, electrical systems • Fire, security, CCTV, paging special systems • Burns & McDonnell Design Firm Concourse Architectural Renovations Concourse A,B,C Public Circulation Areas and Holdroom Ceilings • New floor, wall and ceiling finishes • Renovated restrooms • New signage Concourse Mechanical, Electrical, Plumbing and Special Systems • Concourses A,B,C, Public Circulation Areas • MEPSS benchmarking, renovations and enhancements • Rework Lighting, HVAC, plumbing, electrical systems • Rework fire, security, CCTV, paging Seizing the opportunity for Success Airport Experience Project • Start Early – Reach out to others, do not wait until the last minute to show interest in the project – Be knowledgeable of St. Louis City requirements on SLAA Projects • Research other firms – Know who the players are in your industry – Establish relationships with potential Primes “Success is where preparation meets opportunity.” Meeting and Exceeding MWBE Goals • Prime Companies – Familiarize yourself with SLAA requirements for counting participation, ex. Only Certified MWBE companies located in the city of St. Louis will be counted toward goals. – Seek to create meaningful partnerships with MWBEs consider Joint Ventures or Mentor Protégé relationships as creative ways to meet and exceed the MWBE goals. – View goals as a HELP, not a hindrance. • MWBE Companies • Pursue a long term relationship with Prime. Deliver quality work with competitive pricing. • MWBE Program is not a set aside. Goals assist you to the door. You must open it. For Additional Information St. Louis Airport Authority (314) 551-5000 www.mwdbe.org Board of Public Service (314) 622-3535 www.stlbps.org Airport Experience MWBE Program Manager Yaphett El-Amin (314) 551-5041 ysel-amin@lambert-stl.org