The road of success for implementing a multi-vendor GSM-R ERTMS network Turkey, a multi-vendor region linking Asia with Europe Extensive multi-annual rollout of GSM-R lines * Picture source: Wikipedia 1 What is a multi-vendor GSM-R network? Core Network (NSS) SCP(NS) • NSS vendor 1 MSC(NS) A interface HLR(NS) More competition Variety to rail customers Assurance for system integrators Access Network (BSS) M2000(HW) BSC(HW) • BSS vendor 2 Flexibility & innovations in solutions BTS(HW) Teminals DBS(HW) • OPH, GPH, Dispatchers… (additional vendors) Um Interface OPH GPH GPH OPH GPH GPH 2 Protecting investment … Latest multi-vendor GSM-R Projects in Turkey Eskisehir-Kutahya- Alsancak-Cumaovası Balikesir ETCS L2 Alstom GSM-R core (R99): NSN Macro & Distributed BTS: Full SDH Network: Outdoor trackphones and PBX Mobile and fixed GSM-R terminals 464 km, 42 tunnels ETCS L2: Thales GSM-R core (R99): GSM-R core (R99): NSN Macro and Distributed BTS: Huawei Macro & Distributed BTS: Full SDH Network: 366 km, 23 tunnels GSM-R design: ETCS L2 ready Huawei Huawei Huawei Kayas-Kayseri Full SDH Network: Huawei Mobile and fixed GSM-R terminals 51 km, 1 tunnel A true multi-vendor GSM-R/ERTMS architecture for Turkey 3 NSN Huawei The path to multivendor GSM-R networks Clear public standards Appointed Notified Bodies Conformity Assessments Intermediate Statement of Verification “ISV” specific) DBS tunnel 4 Harmonised Test Specification (EU/global) BTS Test Specification (NoBo Availability of Test laboratories DBS mountain BTS+DBS Shunting yard The history of a harmonised GSM-R Test Specification * From B.Wendler, DB-Systel presentation at ERA CCRCC 25th October 2011 5 DB Test Specification published in 2011 Number of test cases 360 NoBo validated for completeness Including EIRENE traceability matrix: * From B.Wendler, DB-Systel presentation at ERA CCRCC 25th October 2011 6 ERA drives Interoperability ERA published final DB test specification Draft Network Assessment specification for review by stakeholders Set process to arrive at a “Harmonised GSM-R Test Specification” 7 The BSS integration into GSM-R NSS of Turkey Test Specification: source ERA server, DB-Systel Test Legacy R99 NSS Specification Applicable Test Cases according to Test Specification: 136 BSS integration test period: 4 months Test execution and correctness witnessed by Alstom 8 BSS Multi-vendor GSM-R integration results Huawei BSS system was successfully integrated to TCDD’s GSM-R Core Network. The final test report was issued 30th April 2013 and ratified in May 2013 Press Release : “The completion of the multivendor GSM-R integration is an important project milestone for the Eskisehir-AlayuntKutahya-Balikesir (EKB) European Rail Traffic Management System (ERTMS) Line. … Stringent GSM-R specifications and equipment guidelines enable railways globally to setup multivendor systems such as the one now fully integrated for the EKB High Speed line with a total length of 464 km.“ With the integration completed TCDD takes benefits of an open, feature-rich and competitive GSM-R multivendor market. 9 Turkey, an integrated IT rail network Ankara – Eskisehir Pehlivanköy Pythion IP Cameras SDH Video Analysis OMC DWDM Equipment implementation Switch Maintenance Geo-redundant Storage Training OMC Equipment implementation Maintenance Training 10 Ankara Sincan North Line SDH OMC Equipment implementation Maintenance Training Article 5th December 2013 NEWS flash LTE for Rail Zhengzhou Metro Now under passenger operation (26th December 2013) 11 Conclusion Strong demand and utilization of GSM-R outside of Europe UIC vital role to promote GSM-R and its evolution Promotion campaigns in Central Asia, South America and Africa would help the continuation of this success 12 HUAWEI ENTERPRISE ICT SOLUTIONS A BETTER WAY Copyright©2014 Huawei Technologies Co., Ltd. All Rights Reserved. The information in this document may contain predictive statements including, without limitation, statements regarding the future financial and operating results, future product portfolio, new technology, etc. There are a number of factors that could cause actual results and developments to differ materially from those expressed or implied in the predictive statements. Therefore, such information is provided for reference purpose only and constitutes neither an offer nor an acceptance. Huawei may change the information at any time without notice.