asean eib

advertisement
ASEAN- EUROPE’S PARTNER IN ECONOMIC
GROWTH
●ASEAN as a single, integrated entity:
–Population: 605 million
–GDP: US$ 2.31 trillion
–Trade: US$2.48 trillion
-- Average Growth rate 2012- 5.86
Existing infrastructure:
–Total length of AHN: 38,400 km
–Total length of SKRL: 6,890 km
- Over 47 international airports
- over 1000 km of tracks for railways
- 2300 km of gas pipeline
PHYSICAL CONNECTIVITY PRIORITY AREAS
1.
2.
3.
4.
5.
6.
7.
ASEAN HIGHWAY NETWORK (AHN)
SINGAPORE-KUNMING RAILWAY LINK
MARITIME TRANSPORT
AIR TRANSPORT
INLAND WATERWAYS
TRANS ASEAN GAS PIPELINE
ICT INFRASTRUCTURES
Out of 125 measures, 96 are due by 2015;
9 beyond
Physical connectivity- 55 measures
implemented
AHN- progressing well
SKRL- on schedule
Maritime Transport- Roro
SKRL
Connecting
mainland SEA from
Kunming to
Singapore covering
6 AMS
Missing links- 4
ASEAN Power Grid
•Implement the MelakaPekan Baru
Interconnection
•MOU signed by Indonesia
and Malaysia in September
2012, expected COD in
2019
•Implement the West
Kalimantan-Sarawak
Interconnection
•Ongoing, expected COD
in 2015
Maritime Transport
• JICA finished FS on the
establishment of an ASEAN
Roll-on/Roll-off (RO-RO)
Network and Short-Sea
Shipping –PHL-Indonesia
Recommendations on
implementation of RO-RO
implemented or studied
further
Official launch being prepared
1.OWN FUNDS
2. PRIVATE SECTOR
3. INSITUTIONAL- ADB, WB
4. ASEAN INFRASTRUCTURE FUND ( AIF)
5. PPP
PPP FOCAL POINTS IN ASEAN
PPP CENTER PHILIPPINES
PPP UNIT MALAYSIA
BAPPENAS- INDONESIA
STATE ENT. POLICY OFFICE-THAILAND
MINISTRY OF PLANNING- VIETNAM
-SINGAPORE
PHILIPPINE PPP PROJECTS: AIRPORTS, SEAPORTS,
RAILWAYS, ROADS, SCHOOLROOMS, ETC. 76 PROJECTS
FOR A TOTAL OF $12B:
AWARDED- 6 PROJ ( $ 1 B)
PROCUREMENT STAGE- 4 PROJ ( $ 2.67B)
ROLL OUT – INVITATION TO BID SENT- 2 PROJ
($657.78M)
EVALUATION AND APPROVAL- 4 PROJ ($825M)
FINALIZATION OF PROJECT STUDY- 1 ($397M)
ON-GOING FEASIBILITY STUDY- 11 PROJ ( $4B )
PROCUREMENT OF CONSULTANTS FOR PFS- 5 PROJECTS
PROJECT DEVELOPMENT STAGE- 13
AWAITING COSTING- 27 PROJECTS
NEDA sa QC
EDSA, Diliman
1103 Quezon City
Philippines
Contact Numbers:
Trunk Line: (632) 990-0721
(632) 929.8593
(632) 929.8594
(632) 929.8630
(632) 929.9251
Merci beaucoup !
Thank you!
Salamat po!
Download