advertisement

Renewable Energy IPP Procurement

Programme

Window two Preferred Bidders’ announcement

21 May 2012

Slide 1

Introduction

• The procurement documents were released on the 03 of August

2011 and compulsory bidders conference for the first and second window on the 14 of September 2011.

• The document provides for procurement of 3725MW in five different rounds subject to the availability of the MW

• The Department. Under round one:

– Received 53 Bids on the 4 th of November

– Announced 28 preferred bidders in December 2011

• With regards to round two:

– Received 79 bids on the 5 th of March 2012

– These bids amount to 3255MW whilst the cap was 1275MW

Procurement Process

Background

Procurement documents

Request for

Proposals

• Part A: General Requirements and Rules

• Part B: Qualification Criteria

• Part C: Economic Development

Power Purchase

Agreement

• Wind PPA

• Solar PPA

• Small hydro

• CSP PPA

To be concluded in Phase 2

Implementation

Agreement

• Contract between the IPP and the Department

• Obligation for IPP to deliver on economic development

• In buyer default – Department to pay the IPP

Contractual Arrangement

IPP

Eskom

Government Framework

Support Agreement

Government

Procurement Process

Background

Request for Proposal (RFP)

• Requirements

• Rules

RFP Part A

RFP Part B

Qualification

• Environment

• Land

• Economic Develop

• Finance

• Technical

• Price

• Capacity

• Price

• Job creation

• Local content

• Preferential

Procurement

• Enterprise

Development

• Socio-economic development

RFP Part C

Comparative

Evaluation

PART C EVALUATION

Price

70 %

Project cost

Rand/MW

30 %

ED

Job creation

Socio Economic

Local content

6

OVERVIEW OF EVALUATION

PROCESS

7

Evaluation Composition

Evaluation team:

• International reviewers

• Legal review – Linklaters (UK)

• Technical review – Blueprint consult

Financial review

– cross-moderation between the two Financial Advisory firms

• Governance review – Ernst & Young

• Legal evaluation team

• Bowman Gilfillan

• Edward Nathan Sonneberg

• Ledwaba Mazwai

• Webber Wentzel

BKS

• Technical evaluation team

• Matt Macdonald

• Financial evaluation team

• Ernst & Young

• PWC

Evaluation Streams:

• Legal Environment

• Environmental Authorization

• Legal Land

• Land right

• Notarial lease registration

• Proof of land use application

• Legal Commercial

Acceptance of the PPA

Project structure

• Economic Development

• Contributor status level 5

• Compliance with threshold

• Financial

• Full and partial price indexation

• Technical

• Eligibility

• Energy resource

PREFERRED BIDDERS

9

Solar photovoltaic

Wind

Small Hydro

CSP

Preferred Bidders

Summary

No of Bids

9

7

2

1

TOTAL

MW taken by

Preferred

Bidders

Maximum

MW allocated for round 2

417.1

450

562.5

14.3

50.00

1 043.9

650

75

50

10

IPPID

168

207

373

375

523

527

562

750

764

Preferred Bidders

Solar Photovoltaic

Project Name

Solar Capital De Aar 3

Sishen Solar Facility

Aurora

Vredendal

Linde

Dreunberg

Jasper Power Company

Boshoff Solar Park

Upington Solar PV

TOTAL

MW

75.0

74.0

9.0

8.8

36.8

69.6

75.0

60.0

8.9

417.1

11

Preferred Bidders Salient Terms

Solar Photovoltaic

Price: Fully Indexed (Ave Rand per

MWh)

MW allocation

Total Project Cost ( R’million)

Local Content Value ( R’million)

Local Content %

Job Creation : Construction (People)

Job Creation : Operations (People)

Bid Window 2 Bid Window 1

R 1 645

417 MW

R12 048

R5 727

47.5%

4 557

194

R 2 758

632 MW

R21 937

R6 261

28.5%

10 386

221

12

Preferred Bidders

Wind

IPPID

014

240

303

309

362

364

372

Project Name

Gouda Wind Facility

Amakhala Emoyeni (Phase 1)

Eastern Cape

Tsitsikamma Community Wind

Farm

West Coast 1

Waainek

Grassridge

Chaba

TOTAL

MW

135.2

137.9

94.8

90.8

23.4

59.8

20.6

562.5

13

Preferred Bidders Salient Terms

Wind

Price: Fully Indexed (Ave Rand per

MWh)

MW allocation

Total Project Cost ( R’million)

Local Content Value ( R’million)

Local Content %

Job Creation : Construction (People)

Job Creation : Operations (People)

Bid Window 2 Bid Window 1

R 897

563 MW

R 10 897

R 4 001

36.7%

1 579

65

R 1 143

634 MW

R 12 724

R 2 766

21.7%

1 869

128

14

Preferred Bidders

Small Hydro

IPPID

490

815

Project Name

Stortemelk Hydro (Pty) Ltd

Neusberg Hydro Electric Project A

TOTAL

MW

4.3

10.0

14.3

15

Preferred Bidders Salient Terms

Small Hydro

Price: Fully Indexed (Ave Rand per

MWh)

MW allocation

Total Project Cost ( R’million)

Local Content Value ( R’million)

Local Content %

Job Creation : Construction (People)

Job Creation : Operations (People)

Bid Window 2 Bid Window 1

R 1 030

14 MW

R 631

R 421

66.7%

261

7

N/A

N/A

N/A

N/A

N/A

N/A

N/A

16

Preferred Bidder

Concentrated Solar Power

IPPID

002

Project Name

Bokpoort CSP Project

TOTAL

MW

50.0

50.0

17

Preferred Bidder Salient Terms

Concentrated Solar Power

Price: Fully Indexed (Ave Rand per

MWh)

MW allocation

Total Project Cost ( R’million)

Local Content Value ( R’million)

Local Content %

Job Creation : Construction (People)

Job Creation : Operations (People)

Bid Window 2 Bid Window 1

R 2 512

50 MW

R 4 483

R 1 638

36.5%

662

50

R 2 686

150 MW

R 11 365

R 2 391

21.0%

1 165

70

18

Preferred Bidders

Job creation per Province

Description

Eastern Cape Province

Free State Province

Limpopo Province

Northern Cape Province

North-West Province

Western Cape Province

TOTAL

Jobs during construction period

BW2

1 026

140

0

4 709

0

1 184

7 059

Jobs during operations period

BW2

64

32

0

151

0

81

328

19

Description

Northern Cape

Eastern Cape

Western Cape

Free State

TOTAL

Preferred Bidders

Investment per Province

Total Project Cost

(ZAR million)

12 359

8 649

4 684

2 367

28 059

Local content value (ZAR million)

5 837

3 171

1 829

950

11 787

20

Analysis of MW allocation and remaining MW

Technology

Onshore wind

Solar photovoltaic

Concentrated solar power

Small hydro (≤ 10MW)

Landfill gas

Biomass

Biogas

Total

MW allocation in accordance with the

Determination

1 850.0 MW

1 450.0 MW

MW capacity allocated in the First Bid

Submission

Phase

634.0 MW

631.5 MW

MW capacity allocated in the Second

Bid

Submission

Phase

562.5 MW

MW capacity for allocation in future Bid

Submission

Phases

653.5 MW

417.1 MW 401.1 MW

200.0 MW

75.0 MW

25.0 MW

12.5 MW

12.5 MW

3 625.0 MW

150.0 MW

0.0 MW

0.0 MW

0.0 MW

0.0 MW

1 415.5 MW

50.0 MW

14.3 MW

0.0 MW

0.0 MW

0.0 MW

1 043.9 MW

0.0 MW

60.7 MW

25.0 MW

12.5 MW

12.5 MW

1 165.6 MW

Preferred Bidders

Geographic Distribution

22

THANK YOU