NUMERICAL EXAMPLE
Nova Furniture Co.
1. Case Setup:
Nova Furniture Co. is a fictional manufacturer of office desks.
The company uses Machine Hours (MH) as the allocation base for
Manufacturing Overhead.
Annual Data
Item
Amount
Budgeted Fixed MOH
$600,000
Budgeted Activity
30,000 MH
Practical Capacity
40,000 MH
Actual Activity
32,000 MH
Actual MOH
$620,000
Job A – 100 Office Desks
Item
Amount
Direct Materials
$4,000
Direct Labor
$3,000
Machine Hours Used
100 MH
Units Produced
100 desks
2. Calculate POHR:
πππ»π
=
π΅π’ππππ‘ππ ππππ’ππππ‘π’ππππ ππ£ππβπππ
πΆππππππ‘π¦ π·ππππππππ‘ππ
Method 1 — Budgeted Activity:
πππ»π
=
600,000
30,000
= $20/ππ»
600,000
40,000
= $15/ππ»
Method 2 - Practical Capacity:
πππ»π
=
3. Applied MOH for Job A:
π΄ππππππ πππ» = πππ»π
× π΄ππ‘π’ππ π΄ππ‘ππ£ππ‘π¦
Job A uses: 100 MH
Budgeted Activity Method:
$20 × 100 = $2, 000
Practical Capacity Method:
$15 × 100 = $1, 500
4. Total Job Cost
πππ‘ππ π½ππ πΆππ π‘ = π·π + π·πΏ + π΄ππππππ πππ»
Budgeted Activity Method
4, 000 + 3, 000 + 2, 000 = $9, 000
Practical Capacity Method
4, 000 + 3, 000 + 1, 500 = $8, 500
5. Unit Cost
Job A produces 100 desks.
Budgeted Activity Method:
ππππ‘ πΆππ π‘ =
9,000
100
= $90/π’πππ‘
8,500
100
= $85/π’πππ‘
Practical Capacity Method:
ππππ‘ πΆππ π‘ =
6. Main Comparison
Item
Budgeted Activity
Practical Capacity
Capacity Denominator
30,000 MH
40,000 MH
POHR
$20/MH
$15/MH
Applied MOH – Job A
$2,000
$1,500
Direct Materials
$4,000
$4,000
Direct Labor
$3,000
$3,000
Total Job Cost
$9,000
$8,500
Unit Cost
$90
$85
Numerical Takeaway:
-
Direct Materials remain unchanged.
Direct Labor remains unchanged.
The number of Machine Hours used by Job A also remains unchanged.
The only factor that changes is the capacity denominator.
However:
Different Denominator → Different POHR → Different Applied MOH →
Different Product Cost
This is exactly how the numerical example should prove the theoretical
concepts rather than act as a separate exercise.
7. Year-End: Actual MOH vs Applied MOH
At year-end:
Actual Activity = 32,000MH
Actual MOH = $620,000
The task requires comparing Actual MOH with Applied MOH in order to
identify Underapplied or Overapplied Overhead.
Method 1 - Budgeted Activity
POHR: $20/MH
Applied MOH: 32,000 × 20 = $640,000
Comparison:
Applied MOH=$640,000
Actual MOH=$620,000
Since:
Applied MOH > Actual MOH
then:
640,000 − 620,000 = $20,000
Result
$20,000 Overapplied MOH
Method 2 - Practical Capacity
POHR: $15
Applied MOH: 32,000×15=$480,000
Comparison:
Actual MOH=$620,000
Applied MOH=$480,000
Since:
Actual MOH > Applied MOH
then:
620,000 − 480,000 = $140,000
Result
$140,000 Underapplied MOH
8. Final Comparison
Item
Budgeted Activity
Practical Capacity
POHR
$20/MH
$15/MH
Annual Actual
Activity
32,000 MH
32,000 MH
Total
MOH
$640,000
$480,000
Actual MOH
$620,000
$620,000
Year-End
Difference
$20,000
Overapplied
$140,000 Underapplied
Applied
Interpretation
Applied
OH $120k unused capacity + $20k actual
exceeds actual OH
MOH above budget
9. Final Numerical Insight
Under the Practical Capacity method, the company reports $140,000 of
underapplied MOH. However, this amount should not be interpreted entirely as
an estimation error. In this case, $120,000 is associated with unused capacity,
while the remaining $20,000 reflects Actual MOH exceeding Budgeted MOH.