INSPECTION & TESTING REQUIREMENTS
SAUDI ARAMCO FORM-175
REVISION: 07/12/2017
REPLACES: 04/27/2017
CODE NUMBER:
IR011000
PAGE:
1 of 3
SCOPE: PIPE: Seamless or welded clad and lined pipe
TEST AND INSPECTION PER: 01-SAMSS-048,API Spec 5LD 4th Edition.
(1).VISUAL INSPECTION BY BUYER INSPECTION REPRESENTATIVE
(2) REVIEW AND VERIFICATION OF MATERIAL CERTIFICATES AND INSPECTION RECORDS
(3) SUBMISSION OF MANUFACTURING, INSPECTION AND QUALITY RECORDS
0010
0010
* * * Pre-Fabrication/Production Requirements
H
Specification Details / Notes:
X
Pre Inspection meeting (PIM)
Verify company approval of manufacturer’s Inspection and Test
Plan.
0020
R
X
Raw Material Test Report for Carbon Steel Backing Pipe for lined
pipe and weld overlayed pipe
Per 01-SAMSS-048 (note 2)
0030
R
X
Welding Procedure Specification (WPS) and Procedure
Qualification Records (PQR)
Per API 5LD and 01-SAMSS-48. Required company approval.
0040
R
X
Raw Material Verification including Plates
Per 01-SAMSS-48, P.O. requirement and MTC’s. The clad
plates intended for manufacturing Metallurgical clad pipes shall
be procured from Saudi Aramco latest approved steel mills list.
0050
R
Welder Qualification Records
Shall be qualified per ASME section IX and API 5L or
equivalent. Performance records shall show acceptable
rejection rate level.
0052
R
Welding Inspector Qualification
Shall be certified to AWS (CWI) or CSWIP3.1 or equivalent.
0060
R
NDT Personnel and Procedure
Per 01-SAMSS-48
0070
R
Manufacturing Procedure Specification
Per API 5LD and 01-SAMSS-048 Annex B. Required company
approval.
0020
0010
X
* * * In process inspection & test requirement
H
R
Manufacturing Procedure Qualification Test
0020
Specification Details / Notes:
Per API 5LD Annex-D
Chemical and Mechanical Tests:
0030
W
X
a) Chemical Composition (Backing Steel and CRA)
Per API 5LD Para 6.3, 01-SAMSS-048.
0040
W R
X
b) Tensile Tests, Impact test, Drop weight tear test, Flattening
test, and Guided bend test.
Per API 5LD Para 7, API 5L table 18 and 01-SAMSS-048
0050
W R
X
c) Hardness test and Metallographic Examination
Per API 5LD Para 7, API 5L table 18. and 01-SAMSS-048
0060
W
X
d) Corrosion Test
Per API 5LD Para 8 and 01-SAMSS-048 para 8 and API 5LC
Para 8
IR011000 Continued...
INSPECTION & TESTING REQUIREMENTS
SAUDI ARAMCO FORM-175
REVISION: 07/12/2017
REPLACES: 04/27/2017
CODE NUMBER:
IR011000
PAGE:
2 of 3
(1).VISUAL INSPECTION BY BUYER INSPECTION REPRESENTATIVE
(2) REVIEW AND VERIFICATION OF MATERIAL CERTIFICATES AND INSPECTION RECORDS
(3) SUBMISSION OF MANUFACTURING, INSPECTION AND QUALITY RECORDS
0070
W
X
e) Cladding bond strength test/Liner tightness test
Per Para 8.3 of API 5LD and 01-SAMSS-048.
0080
W
X
f) Residual magnetism
Per Para 8.4 of API 5LD and 01-SAMSS-048.
X
g) Ferrite/Austenite Ratio for DSS
Per Para 8.1 of API 5LD and APL 5LC
0090
0100
W R
X
Heat Treatment
Per Para 5.4 of API 5LD and 01-SAMSS-048
0110
W
X
Repair of Defects
Per Para 12 of API 5LD and 01-SAMSS-048.
0120
W R
X
Hydrostatic Testing
Per Para 9 of API 5LD and 01-SAMSS-048
0130
W R
X
Non Destructive Testing
Per Para 11 of API 5LD and 01-SAMSS-048
0140
W
X
Surface Treatment
Per API 5LD Para 12.4
0150
W
X
Positive Material Identification
Per 01-SAMSS-048
0030
0010
* * * Final inspection & test requirements
H
R
Specification Details / Notes:
Workmanship and Visual Inspection
Per Para 12 of API 5LD and 01-SAMSS-048
0020
H
X
Dimensions, Weights, Lengths, Weld Seam and pipe ends
Per Para 10 of API 5LD and 01-SAMSS-048
0030
W
X
Marking, Handling, Packing and Transportation
Per Para 13 of API 5LD and 01-SAMSS-048
Per 01-SAMSS-048and applicable ASTM std.
0040
R
X
Mill Test Certificate / Documentation
0050
R
X
Product test certificates and records
0060
R
X
Certificate of compliance
0040
* * * Additional/Supplemental Requirements
Specification Details / Notes:
IR011000 Continued...
INSPECTION & TESTING REQUIREMENTS
SAUDI ARAMCO FORM-175
REVISION: 07/12/2017
REPLACES: 04/27/2017
CODE NUMBER:
IR011000
PAGE:
3 of 3
(1).VISUAL INSPECTION BY BUYER INSPECTION REPRESENTATIVE
(2) REVIEW AND VERIFICATION OF MATERIAL CERTIFICATES AND INSPECTION RECORDS
(3) SUBMISSION OF MANUFACTURING, INSPECTION AND QUALITY RECORDS
Notes:
(1)Refer detailed instruction sheet SA175 form IR000003 of inspection requirement for ideal use of this form.
(2)In process inspection required at pipe manufacturing facility for carbon steel pipe intended for mechanically lined pipe and weld overlayed pipe
Unless carbon steel pipes are supplied by Saudi Aramco. Carbon steel backing pipes must be from Saudi Aramco approved source.
End of IR011000