INSPECTION & TEST PLAN FOR HAIRPIN EXCHANGER
1 Page 6
PROJECT
:
TPPI REVAMPING PROJECT
OWNER
:
PT. TRANS PACIFIC PETROCHEMICAL INDOTAMA
LOCATION
:
TUBAN
SERVICE
:
HAIRPIN EXCHANGER
TAG. NO.
:
204-E-001A, 204-E-002A/B, 203-E-001
DOCUMENT NO.
:
D2209 ITP-01
COMPANY DOC. NO.
:
V-8000026543-130
DOCUMENT TITLE
:
INSPECTION & TEST PLAN FOR HAIRPIN EXCHANGER
PREPARE
REV
DATE
PURPOSE
CHECK
APPROVE
APPROVE
PT. DIHI
PT. TPPI
NAME
NAME
NAME
A
15-Dec-22
Issued for Review
AYS
ADR
IRF
B
8-Feb-23
Re-Issued for Review
DMS
AYS
IRF
C
29-Mar-23
Re-Issued for Review
DMS
AYS
IRF
D
2-Jun-23
Issued for Approval
DMS
AYS
IRF
E
4-Jul-23
Issued for Approval
DMS
AYS
IRF
0
20-Jul-23
Issued for Construction
AYS
ADR
IRF
NAME
DATE
Owner
: PT.Trans-Pacific Petrochemical Indotama
Project
: TPPI REVAMPING PROJECT
Item No.
: 204-E-001A, 204-E-002A/B, 203-E-001
Quantity
: 4 EA
Doc. No. : D2209 ITP-01
INSPECTION AND TEST PLAN
( HAIRPIN EXCHANGER PACKAGE )
Rev. No. : 0
Issue Date : 20 Juli 2023
Page : 2 of 6
INSPECTION PARTY
NO.
MANUFACTURING ACTIVITY
Procedure
Qualification
1-1. Procedure Qualification
Record (PQR)
DESCRIPTION
REFERENCE
Acceptance Criteria
Report/ Certificate
DIHI
AI
TPE
TPPI
PI
MIGAS
M
A
A
A
-
-
O
M
A
A
A
-
-
O
I.
Review of the PQR
- ASME Section IX
- Client Datasheet
- ASME Sec. VII Div. 1
- ASME Sec. IX
- TEMA Class "R"
- ASME Sec. V
- TEMA
- TPPI Spec U86
1-2. Welding Procedure
Specification (D2209 WPS-01)
(V-8000026543-123)
Review of the welding procedure
- ASME Section IX
1-3. Welders and welding
operation qualification
test
Review of the welders and welding operator
qualification test records
- ASME Sect. VIII Div. 1
M
A
A
A
-
-
O
1-4. Fabrication Procedure (D2209 FAB-01)
(V-8000026543-124)
Review of all fabrication procedures
- ASME Sect. VIII Div. 1
M
A
A
A
-
-
O
1-5. Inspection and Test Procedure
Review of inspection procedure such as
Visual Test Procedure and Dimensional
Test Procedure
- ASME Sect. VIII Div. 1
- ASME Sect. V
M
A
A
A
-
-
O
1-6. PWHT Procedure (D2209 HTP-01)
(V-8000026543-141)
Review of Holding Time, Temperature, Heating Rate - ASME Sect. VIII Div. 1
and Cooling Rate, Etc
- TEMA Class ''R''
- Approved Document
M
A
A
A
-
-
O
1-7. NDE Procedure (D2209 NDE-01)
(V-8000026543-132)
- Review RT Procedure
- Review MT Procedure
- Review PT Procedure
- ASME Sect. VIII Div. 1
- ASME Sect. V Article 10
M
M
A
A
A
A
A
A
-
-
O
O
1-8. Strength Calculation
-
- ASME Sect. VIII Div. 1
- TEMA Class ''R''
M
A
A
A
-
-
O
1-9. Drawing
-
- ASME Sect. VIII Div. 1
- TEMA Class ''R''
-
M
A
A
A
-
-
O
M
R
R
W
-
-
-
Pre Inspection Meeting
Note :
M : Preparation and Inspection
R : Review
SW : Spot Witness
H : Hold Point
-
W : Witness
O : Report Required
A : Approval
R : Review
- Specification, Eng. Doc, Quality
TPE : PT Tripatra Engineering
DIHI : PT. Daekyung Indah Heavy Industry
TPPI : PT. Trans-Pacific Petrochemical Indotama
AI : Authorized Inspector
PI : Perusahaan Inspeksi
MIGAS : Direktorat Jendral Minyak Dan Gas Bumi
Owner
: PT.Trans-Pacific Petrochemical Indotama
Project
: TPPI REVAMPING PROJECT
Item No.
: 204-E-001A, 204-E-002A/B, 203-E-001
Quantity
: 4 EA
Doc. No. : D2209 ITP-01
INSPECTION AND TEST PLAN
( HAIRPIN EXCHANGER PACKAGE )
Rev. No. : 0
Issue Date : 20 Juli 2023
Page : 3 of 6
INSPECTION PARTY
NO.
II.
MANUFACTURING ACTIVITY
PURCHASING
(Raw Material and Component)
2-1. Requisition for Purchasing
2-2. Receiving inspection material
DESCRIPTION
Review of the material requisition sheet
REFERENCE
-
Acceptance Criteria
Report/ Certificate
DIHI
AI
TPE
TPPI
PI
MIGAS
- ASME Sec. II A & ASME Sec. II C
- U85 : Material of Construction
- ASME Sec VIII Div.1
- Fabrication drawing
- Certification EN 10204 Type 3.1
- Specification
M
-
-
-
-
-
-
M
W
R
W
-
-
O
Material inspection as per requirement of the
customer specification and/or material
specification
a. Visual examination of the surface material
b. Dimensional check and minimum thickness
control
c. Material identification and transfer of
identification mark
d. Review of the certification material test report
- Fabrication drawing
- Purchase requisition
- Purchase order
- Mill Certificate
- ASME Sec II Part A
- ASME Sec II Part C
- ASME Sec VIII Div.1
a. Visual check
b. Dimensional check
c. Transfer of identification mark
- Cutting Layout
- Fabrication Drawing
- Fabrication Tolerance
- Fabrication Drawing
M
R
R
R
-
-
O
3.A.1-2. Marking of nozzle opening
a. Dimensional check after marking before cutting
- Fabrication Drawing
- TEMA Class ''R''
- Fabrication Drawing
M
R
R
R
-
-
O
3.A.1-3. Fit-up & welding pipe to pipe / neck
a. Visual and dimensional check before welding
b. Offset, clean, edge preparation
- Fabrication Drawing
- Fabrication Tolerance
- Welding Procedure Spec.
- Fabrication Drawing
- ASME Sec. VIII Div. 1
M
R
R
R
-
-
O*
3.A.1-4. NDE examination of main seam
a. Visual check of weld to make sure that
no defect after welding
b. Dimensional check after weld including
reinforced weld
c. RT ( 100% for Butt Welds )
- NDE Procedure
- ASME Sec. V
- TPPI Spec U86
M
R
R
SW
-
-
O
III
Inspection during fabrication
III.A.1 At Shop Fabrication :
3.A.1-1. Pipe Marking
- RT Full for item no. 204-E-001R & 203-E-001R
- RT Spot for item no. 204-E-002R
d. PT/MT
- On 1st pass (root) and finish weld
Note :
M : Preparation and Inspection
R : Review
SW : Spot Witness
H : Hold Point
W : Witness
O : Report Required
A : Approval
R : Review
TPE : PT Tripatra Engineering
DIHI : PT. Daekyung Indah Heavy Industry
TPPI : PT. Trans-Pacific Petrochemical Indotama
AI : Authorized Inspector
PI : Perusahaan Inspeksi
MIGAS : Direktorat Jendral Minyak Dan Gas Bumi
*: Report Requiered : Fit Up, Visual, Dimensional,
Welding Traceability report
Owner
: PT.Trans-Pacific Petrochemical Indotama
Project
: TPPI REVAMPING PROJECT
Item No. : 204-E-001A, 204-E-002A/B, 203-E-001
Quantity : 4 EA
NO.
MANUFACTURING ACTIVITY
III.A.2 Tube Bundle Inspection
3.A.2-1. Tubesheet inspection
Doc. No. : D2209 ITP-01
Rev. No. : 0
Issue Date : 20 Juli 2023
Page : 4 of 6
INSPECTION AND TEST PLAN
( HAIRPIN EXCHANGER PACKAGE )
DESCRIPTION
REFERENCE
Acceptance Criteria
INSPECTION PARTY
DIHI
AI
TPE
TPPI
PI
MIGAS
Report/ Certificate
a. Dimensional check Diameter holes and thickness
- Fabrication drawing
- TEMA Class ''R''
- Fabrication drawing
M
W
R
W
-
-
O
a. Dimensional check
b. Baffle direction
c. Mock up tube to tube sheet
- Fabrication drawing
- TEMA Class ''R''
- Fabrication drawing
M
W
R
W
-
-
O
M
W
R
W
-
-
O
3.A.2-3. Fit-up tube to tubesheet
a. Visual and dimensional check before insert tube
b. Offset, clean, edge preparation
- Fabrication drawing
- Inspection & Test Procedure
(V-8000026543-131)
- Fabrication drawing
- Inspection & Test Procedure
(V-8000026543-131)
M
W
R
W
-
-
O
3.A.2-4. Expanding tube to tubesheet joint
a. Check dimensional
b. Check expanding ratio
c. Visual inspection after expanding
- Fabrication drawing
- Inspection & Test Procedure
(V-8000026543-131)
- Fabrication drawing
- Inspection & Test Procedure
(V-8000026543-131)
M
W
R
W
-
-
O
3.A.2-5. Strength Weld
a. Check welding parameter
b. PT inspection on first pass and finish weld
- WPS & PQR
- Inspection & Test Procedure
(V-8000026543-131)
- WPS & PQR
- Inspection & Test Procedure
(V-8000026543-131)
M
W
R
W
-
-
O
3.A.2-6. Helium leak testing, and soap test
a. Check tube to tubesheet joint
- ASME Sect.V, Article 10
- ASME Sect.V, Article 10
M
W
R
W
-
-
O
3.A.2-7. Post Weld Heat Treatment
( All item for U-Tubes )
( for item no. 203-E-001 on Both Side )
a. Cooling Rate
b. Heating Rate
c. Holding Time
d. Holding Temperature
- PWHT Procedure
- Data Sheet
- ASME Sect. VIII Div. 1
- PWHT Procedure
- Data Sheet
- ASME Sect. VIII Div. 1
M
W
R
W
-
-
O
III.A.3 Final Inspection
3.A.3-1. - Over all dimensional check &
visual check
- Setting/joint flange to flange conection
a. Visual check after weld
b. Dimensional check
- Fabrication drawing
- TEMA Class ''R''
M
W
R
W
W
-
O
3.A.3-2. Hydrostatic test
a. Check of calibration status of pressure
- Pressure Test Procedure
(V-8000026543-125)
- Inspection and Test Procedure
- Project Specification
- ASME Sec. VIII Div. 1
- TEMA
- No Leakage
M
H
H
H
H
H
O**
gauge and recorder
b. Check number/range of pressure gauge
c. Check position of pressure gauge
d. Check of pressure
e. Check of temperature
f. Check of leakage and deformation
- Fabrication drawing
W : Witness
O : Report Required
A : Approval
R : Review
TPE : PT Tripatra Engineering
DIHI : PT. Daekyung Indah Heavy Industry
TPPI : PT. Trans-Pacific Petrochemical Indotama
AI : Authorized Inspector
PI : Perusahaan Inspeksi
3.A.2-2. Tube bundle arrangement
Note :
M : Preparation and Inspection
R : Review
SW : Spot Witness
H : Hold Point
- ASME Sec. VIII Div. 1 (UG-99)
- Fabrication Drawing
- Pressure Test Procedure
- 120 Minutes Holding Time
- Chloride Content < 250 ppm
MIGAS : Direktorat Jendral Minyak Dan Gas Bumi
** : Valid calibration and certificate include water
analysis certificate indicate chloride cente
Owner
: PT.Trans-Pacific Petrochemical Indotama
Project
: TPPI REVAMPING PROJECT
Item No.
: 204-E-001A, 204-E-002A/B, 203-E-001
Quantity
: 4 EA
Doc. No. : D2209 ITP-01
INSPECTION AND TEST PLAN
( HAIRPIN EXCHANGER PACKAGE )
Rev. No. : 0
Issue Date : 20 Juli 2023
Page : 5 of 6
INSPECTION PARTY
NO.
IV.
MANUFACTURING ACTIVITY
DESCRIPTION
Painting
a. Check of area/surface condition after blasting
- External Coating
a) Surface preparation
b) Pinting inspection
b. Check of painting material & colors
c. Check of dry film thickness
d. Visual check of surface condition after painted
V.
Packing & Shipping Preparation
VI.
REFERENCE
Acceptance Criteria
DIHI
AI
TPE
TPPI
PI
MIGAS
Report/ Certificate
- Painting Procedure
(V-8000026543-127)
- TPPI Spec N50
- Approved painting Procedure
(V-8000026543-127)
- Thickness
- RH < 85%
M
R
R
W
-
-
O
a. Dryness check
b. Preservation check : Nitrogen (N2)
c. Spare part check
d. Center Of Gravity (COG)
e. Orientation marking
f. etc
- Packing List
- Correct Marking
- Name Plate detail drawing
- Correct Marking
- Pre-shipping check list for
vessel / HE
- Preservation Procedure
(V-8000026543-126)
M
R
R
W
-
-
O
Name Plate Check
a. Drawing
- Drawing
- Drawing
M
R
R
W
-
-
-
VII.
Inspection Release Certificates ( IRC )
a. Satisfactory completion as per P.O
- Satisfactory completion as per P.O
M
-
-
A
-
-
O
VIII.
Manufacturer Data Report ( MDR )
a. All relevant information as per code
requirement in data report
- ASME Sect. VIII Div. 1
- ASME Sec. VIII Div. 1
- MDR Index
M
R
R
A
-
-
O***
W : Witness
O : Report Required
A : Approval
R : Review
TPE : PT Tripatra Engineering
DIHI : PT. Daekyung Indah Heavy Industry
TPPI : PT. Trans-Pacific Petrochemical Indotama
AI : Authorized Inspector
PI : Perusahaan Inspeksi
MIGAS : Direktorat Jendral Minyak Dan Gas Bumi
Note :
M : Preparation and Inspection
R : Review
SW : Spot Witness
H : Hold Point
*** : MDR Index
Page 6 of 6
Parties Approval
PT. Daekyung Indah Heavy
Industry
( Ahmad Yusa )
Sign & Name
PT. Trans Pacific Petrochemical
Indotama
PT. PJ TEK Mandiri
( PI )
Ditjen MIGAS
Sign & Name
Sign & Name
( Nizar Z. )
Sign & Name
Download