Uploaded by Tuan Pham Minh

AWS CWI - Pham Minh Tuan

advertisement
MINH TUAN, PHAM
AWS – Certified Welding Inspector
Day of birth.
March 10th, 1992
Mobile No. +84 898 859 410
Place of birth. Quang Ngai
Address.
Vung Tau, Viet Nam
Marital status. Married
Email
tuanpham.ntk@gmail.com
EDUCATION
❖ JULY 2014
NAVAL ARCHITECTURE AND MARINE ENGINEER, NHA TRANG UNIVERSITY
ACHIEVEMENTS
•
CERTIFIED WELDING INSPECTOR, AMERICAN WELDING SOCIETY
•
PT/MT/RT LEVEL II, SNT-TC-1A
•
PAUT INTERPRETATION, SNT-TC-1A
•
INTERNAL AUDITOR FOR INTEGRATED SYSTEMS ISO 9001:2015 – ISO 14001:2015 –
ISO 45001-2018
•
CERTIFICATE OF EQUIPMENT INSTALLATION SUPERVISION IN TECHNOLOGY
WORKS
SKILLS
•
Good at writing and speaking in English
•
Be proactive, hard-working and responsible in
Be self-motivated and adaptable in new roles
Ability to work independently and as part of
a team
•
duties
•
•
Ability to perform well under the high
pressure
EXPERIENCE
❖ MAY 2022 – NOW
WELDING INSPECTOR, PETROVIETNAM MARINE SHIPYARD
•
Run a role of welding inspector for buoyancy tanks and link bridge of CPP Jacket, Gallaf Batch 03.
•
Take in charge of hydro test packages.
❖ APRIL 2021 – APRIL 2022
MECHANICAL INSPECTOR, DONGHYUP INDUSTRIES
•
Take in charge of fabrication and testing for Thi Vai LNG Storage Tank (180,000 M3).
Page 1 of 6
❖ OCTOBER 2020 – MARCH 2021
PIPING INSPECTOR, YUSUNG ENC
•
Run a role of welding inspector for pipelines fabrication of Hyosung Vina Chemical – Olefin plant.
Take in charge of pressure test packages.
❖ MAY 2020 – OCTOBER 2020
MECHANICAL INSPECTOR, PETROVIETNAM CHEMICAL & SERVICE CORP.
•
Run a role of inspector for maintenance of equipment and pipelines of Package A2 – Residue Fluid
Catalytic Cracking Plant (RFCC).
❖ JULY 2018 – APRIL 2020
AUTHORIZED INSPECTOR, APAVE ASIA – PACIFIC CO., LTD
•
Run a role of client representative for fabrication and testing of Hai Linh LNG Storage Tanks (01 x
41,802 M3, 02 x 85,260 M3).
❖ JULY 2014 – JUNE 2018
QC ENGINEER
•
Took in charge of welding inspector for new shipbuilding of 94M Aluminum High-speed
Catamaran in 2018
•
Run a role of structural inspector for new shipbuilding of Chemical Tanker 21,800 DWT in 2017
•
Succeeded delivery 02 vessels (61,000 DWT Bulk Carrier) at the first in charge of new shipbuilding
project to Ray, Greece in the period of 2015 - 2016
DETAIL ACTIVITIES
❖ MAY 2022 – NOW
POSITION
WELDING INSPECTOR
COMPANY PETROVIETNAM MARINE SHIPYARD
PROJECT
GALLAF BATCH 3 – CPP JACKET
CLIENT
NORTH OIL COMPANY
+ Conduct surveillance activities on site based on approved documents (drawing, method statements,
procedures, ITP, ...) and client requirements, report to QC Manager and issue NCR or Quality Event
Report to sub-contractor if any;
+ Verify the incoming material and welding consumable based on their test certificate and their
storage on site;
Page 2 of 6
+ Conduct fit up inspection and verify approved WPS/ qualified welder to be appropriate in each
welding joint, give advice/ recommend to working sequence;
+ Check the welding parameter during welding based on approved WPS;
+ Conduct the visual inspection and notify to company for their inspection, if any;
+ Monitor in PWHT progress based on procedure and approved WPS, if any;
+ Coordinate with NDT Service in their performance on site;
+ Prepare the repaired request and monitoring once repairing on site, if any;
+ Prepare test package and communicate with client during pressure test progress;
+ Verify the validity of equipment and witness in pressure test progress;
+ Prepare the testing report and finalize with contractor, client;
❖ APRIL 2021 – APRIL 2022
POSITION
MECHANICAL INSPECTOR
COMPANY DONGHYUP INDUSTRIES
PROJECT
LNG THI VAI RECEIVING TERMINAL
CLIENT
PETRO VIETNAM GAS
+ Prepare quality documents (Inspection and Test Plan, Welding Map, NDT Plan, …) associated with
project requirements;
+ Conduct incoming materials inspection; maintain the trace-ability of materials, verify welding
consumable with their storage and category properly complied with specification and procedure;
+ Verify and update in validity status of equipment;
+ Prepare the WPQR for various materials, such as Carbon Steel, Stainless Steel and 9Ni Steel;
+ Prepare and conduct the welders/ operators’ qualification and production test;
+ Conduct daily inspection and survey on site (unlimited to dimension inspection, fit up inspection,
storage of welding consumable on site, welding parameter check, visual inspection and further);
+ Manage interfaces with service parties in Non-Destructive Testing and Destructive Testing for their
performance on site;
+ Summary and determine welding repair rate based on NDT data records, require for investigate in
root cause of failure and re-training to welders/ operators;
+ Develop the test packages, conduct the final walk down, punch control and monitor in pressure test
(Vacuum, pneumatic and hydro test as well);
+ Prepare summary quality inspection reports, daily surveillance reports and NCR if any;
+ Coordinate with contractor in the final inspection and finalize documentation before handover to
pre-com’;
Page 3 of 6
❖ OCTOBER 2020 – MARCH 2021
POSITION
PIPING INSPECTOR
COMPANY YUSUNG ENC
PROJECT
OLEFIN PLANT 1
CLIENT
HYOSUNG VINA CHEMICAL
+ Study ITP, procedures and conduct daily inspection activities on site;
+ Conduct fit up inspection and verify approved WPS/ qualified welder to be appropriate in each
welding joint, give advice/ recommend to working sequence;
+ Conduct welder qualification and ensure welding process at site is followed WPS with qualified
welders;
+ Check the welding parameter during welding based on approved WPS;
+ Conduct the visual inspection and notify to contractor for their inspection, if any;
+ Update welding status/ NDT repair rate and coordinate in activities of non-destructive testing of
completed weld joints at site based on NDT Plan;
+ Prepare and develop the test packages based on approval line list, PI&D, ISO and submit to approve
before release for pressure test process.
+ Run a role of key person in pressure test process, such as line check, punch status control, final
walkdown and testing;
+ Prepare bolting inspection report, reinstatement checklist and finalize the test package;
❖ MAY 2020 – OCTOBER 2020
POSITION
MECHANICAL INSPECTOR
COMPANY PETROVIETNAM CHEMICAL & SERVICE CORP
PROJECT
THE 4TH TURNAROUND OF DUNG QUAT REFINERY
CLIENT
BINH SON REFINING AND PETROCHEMICAL JSC
+ Study the relevant documentation of turnaround process, such as method statement of equipment
maintenances, approved ITP, WPS, Welder Qualification and related issues;
+ Review material certificates (CO & CQ) and determine raw materials, welding consumables and
determine in compliance with applicable specification before site activities;
+ Witness in sub-contractor’s maintenance activities of slide valves, reactor cyclone dip leg pipes,
generation, vapor line, manhole lip seals, air lift pipe distributor;
+ Coordinator to sub-contractors and notify to client (BSR) in their inspection (unlimited to preinspection and marking (with client), fit up inspection, visual inspection, re-installation and bolting
inspection);
Page 4 of 6
+ Update welding status, NDT Plan and coordinate with NDT Service for their performance
(PT/RT/UTM/PWHT) on site;
+ Coordinate with client in final box up inspection;
+ Check the condition of issued punches and finalize documentation with company.
❖ JULY 2018 – APRIL 2020
POSITION
AUTHORIZED INSPECTOR
COMPANY APAVE ASIA-PACIFIC
PROJECT
LNG RECEIVING TERMINALS (03 STORAGE TANKS)
CLIENT
HAI LINH PETROLEUM CO., LTD
+ Review project documents such as method statements, NDT procedure, welding map, ITP, …;
+ Witness qualification of WPS and welders/welding operators complied with particular codes;
+ Conduct inspection on site based on ITP and determine quality assurance of accomplished products
based on specification, codes and standards (unlimited to cutting, assembly, fit up inspection,
dimension checking and visual final welding inspection, painting inspection);
+ Issue NDT plan and manage interfaces with subcontractors/ service companies in their activities;
+ Welding status control through daily inspection on site and NDT reports review;
+ Conduct the surveillance on site, issue daily activities reports and NCR if any; NCR control and
approve for method of correction active before perform on site;
+ Review inspection reports and handover to clients
❖ JULY 2014 – JUNE 2018
QC ENGINEER
61,000 DWT
BULK CARRIER
21,800DWT
CHEMICAL TANKER
94M HIGH SPEED
CATAMARAN
+ Conduct daily inspection on site and make schedule for inspection with Client or Classification
Representative as well based on project schedule, ITP and specification;
+ Check NDT plan and coordinate with NDT Service for their performance on site before final
inspection with client;
Page 5 of 6
+ Coordinate with Client/ Classification Representative during inspection, follow up issue status and
clearance before handover to next step;
+ Prepare and develop quality documents (inspection reports, inspection checklist, …) before final
inspection;
+ Communicate with related person in-charge of issuing and give solution for repair activities on site;
+ Monitor and coordinate in the operation test of crane, leak test for cargo tank and others;
REFERENCES
❖ LO CANH SANH
SURVEYOR, BUREAU VERITAS INDUSTRIAL BRANCH
Mobile: +84 93 2 279 199
❖ LE DINH CHINH
WELDING INSPECTOR, PTSC M&C
Mobile: +84 98 8 958 192
Sincerely
(Please come to next pages for detail of certificates)
Page 6 of 6
NDE
CENTER FOR NON-DESTRUCTIVE EVALUATION
Corporate
Partner
This certifies that
MT.PHAMMINHTUAN
-
Has been successfully passed examinations in accordance with requircments of the Company Written
Practice which is based on the Recommended Practice No. SNT-TC-IA, 2020 Edition of the American
Society for Nondestructive Testing (ASNT) in the following discipline and level:
Method: LIQUID PENETRANT
EXAM
TESTING
Levet:
il
(Two)
SCORE
WEIGHTED SCORE
PASSING MININUU
GENERAL (G)
E7.50
1t3
70.@
SPEC|FTC (S)
100
1E
70.00
PRACTTCAL (P)
96.00
1t3
80.00
COMPOSITE SCORE
94.50
(G+S+P) / 3
80.00
WSUAL ACUTY: ltormal
COLOR VISION: l,lo{mal
APPLICATION:
Walds & Wtought
CERr. ,Io.
NDEM536/PT
,SSUEDarE
Mucls
PIRATION
This certificate is issued to enable the employer to certiry the individual as per their written
DATE:
of
Novembor 2021
November 2026
SNT-TC-'IA
rRuus rAM
OANTI GIA
(Hdilc
Dao Duy Dung
Dang Thi
ASNT NDT Level III-Cert. No. 119197
B
Rev.2021.01
Deputy Director
for Non-D€structive
tion
.1
I
-i
NDE
CENTER FOR NON-DESTRUCTIVE EVALUATION
This certifies that
re)
Corporatg
Partner
MT.PHAMMINHTUAN
Haa been succeasfully passod examinations in accordance with rcquirements of the Company Written
Practice which is based on the Recommended Practice No. SNT-TC-IA, 2020 Edition of the American
Society for Nondestuctive Testing (ASNT) in the following discipline and level:
Method: MAGNETIG PARTICLE
EXAM
TESTING
Level:
ll
(Two)
SCORE
WEIGHTED SCORE
PASSING MINIMUH
GENERAL (G)
87.50
1t3
70.00
SPECTFTC (S)
95.00
1t3
70.00
PRACTTCAL (P)
96.00
1t3
80.00
COMPOSITE SCORE
92.83
{G+S+P) / 3
80.00
WSUAL
ACUN: Nomal
COLOR WSION: I'lomal
APPL'CAT'ON:
Welds & Wought Ptoducb
,SSUEDAIE
CERT. No.
NDE/00536/MT
EXPIRATIOiI
This certificate is issued to enable the employer to certiry the individual as per their
the
ents
DATE:
of
t10vember 2021
November 2026
SNT-TC-IA.
TRU}JG TAM
OANH GiA
KIi0Ii(j PHA
Dao Duy Dung
ASNT I\DT Level III-Cen. No.
Rev. 2021. 01
Dang
119197
Deputy
for Non-Destructive Evaluation
Download