A quality representative must create a manual inspection lot, record each affected SN in the inspection lot, and then tie each affected SN to the R&H through the fit window.
You can add this document to your study collection(s)
You can add this document to your saved list
(For complaints, use another form )
Input it if you want to receive answer
Rate us