Chapter 1
CS3503:
Systems Analysis and Design
Lecture 8 – Baseline Project Plan
UNB Faculty of Computer Science
1
Learning Outcomes
At the end of lecture students should be able to
Explain the purpose of a Baseline Project Plan (BPP)
List the topics included in a BPP
Chapter 1
Begin work on the BPP for their group project
2
Project Progression
1. Someone(s) has a project idea
2. Gathers support and submits a System Request
Project sponsor
Business need, value, requirements
Constraints
Chapter 1
3. Approved
Project Charter
Project planning activities
Baseline Project Plan
3
Baseline Project Plan (I)
Establishes a project plan
to transition from
planning
Assures parties that there
is a common, complete
understanding of
Project Planning
Implementation
Analysis
Scope
Benefits
Chapter 1
Duration
Design
4
Baseline Project Plan (II)
Identifies measures
critical for success
Project Planning
Feasibilities
Intended to be updated as
the project proceeds
Why?
Implementation
Analysis
Chapter 1
Design
5
Chapter 1
Effort
Things Get Expensive
Time
6
BPP Components
Introduction
System description
Feasibility assessment
Chapter 1
Management issues
7
BP: Introduction
Overview
Recommend course of action
Define project scope
What it affects
Interface interactions
Chapter 1
System capabilities
8
Scope: Data Flow Diagram
Chapter 1
Level 0 DFD and tease
9
BP: System Description
Outline possible alternative solutions
Goldilocks approach: Too much, too little, just right
Chapter 1
Usually in narrative (story) format
10
BPP: Feasibility Assessment
Project costs and benefits
Technical difficulties
Chapter 1
High-level project schedule
11
BP: Management Issues
Outlines concerns that management may have about
the project
Team composition
Communication plan
Chapter 1
Project standards and procedures
12
BPP Review
All parties review the BPP
Ensure that their interface with the project can work
Chapter 1
Parties agree to continue
13
BPP Report
Chapter 1
The report template is on the Learning Management System
14
Chapter 1
Project, Groups
15
Project
The project will involve the project plan, analysis, and initial
design of a system.
Chapter 1
A short exercise will precede the project (next lecture)
16
Groups
Initial group assignment is random
Ideal group size is 5 to 6
Switching mechanism
Everyone has ½ token
Switch cost is 1 token
Switch is symmetrical
Tristan will validate and confirm switch requests
Chapter 1
Switch requests to be sent by Friday at noon
Final groups announced on Monday
17