Slide Overview
Challenges for stakeholders
Search for new options …
Slide
3-6
… Siemens has answers & references
Slide
8-14
Page 2
© Siemens AG 2013. All rights reserved.
IC RL UT LRV eBus/eBRT
Lessons learned: "Consider all Major Stakeholders
so you completely understand the business case"
Electric Utility
Increase sales of
renewable energy
Electric
Equipment
Manufacturer
enhance Portfolio
Green and
Sustainable
Public
Transport
Vehicle
Manufacturer
Enhance portfolio
Page 3
City Councils
Clean & affordable
city transport
Operator
Reliable operation &
increased profit
Inhabitants
Clean & affordable
city transport
© Siemens AG 2013. All rights reserved.
IC RL UT LRV eBus/eBRT
eBus and eBRT rounds up the offerings for
Mobility Systems in Urban areas
Parameter:
Commuter Rail: 750-3000m x 30.000-70.000
Metro: 550-1000m x 25.000-80.000
Cityval: 500-900m x 15.000-30.000
Light Rail: 500-800m x 5.000-20.000
Trams: 300-600m x 3.000-9.000
Bus: 200-400m x 1.200-6.000
Typical transport capacity (Passenger/hour/per direction)
80.000
Passenger
Coaches for
intercity traffic
Light rail and street car,
APM (feeder) systems)
70.000
60.000
Station
eBus / eBRT
Metro
(medium and
high-capacity)
50.000
Commuter
Rail
City
40.000
APM airport shuttle and
link feeder systems
30.000
Megacity
Cityval (automated
small metro)
20.000
Light Rail
(Pre-metro)
10.000
Airport
Trams
eBus / eBRT
0,2 km
0,4 km
0,6 km
0,8 km
1,0 km
1,2 km
Metros are the core
transportation systems
Average distance between stops
Page 4
© Siemens AG 2013. All rights reserved.
IC RL UT LRV eBus/eBRT
Our vision of green and sustainable City Transport
systems of the future …
Delivery Vehicle
Environmental Zones
Zero Emission
Battery Vehicle
Battery Buses (eBus)
Delivery Vehicles
High Capacity Buses (eBRT)
Battery & APU
Garbage
Garbage
Truck
Truck
"Silent" delivery
Reduced Emission
Zero Emission
UCap Hybrid Vehicle
Battery & DE Truck
Diesel or Gas Hybrid
Fuel Cell Hybrid
Page 5
© Siemens AG 2013. All rights reserved.
IC RL UT LRV eBus/eBRT
Slide Overview
Challenges for stakeholders:
Search for new options …
Slide
3-6
… Siemens has answers & references
Slide
8-14
Page 6
© Siemens AG 2013. All rights reserved.
IC RL UT LRV eBus/eBRT
Siemens has been a pioneer in electrical engineering used for mobility solutions for more than 120 years
Electric car
"Victoria"
Electric train
1879
Electric
trolley/bus
1881/82
1905
First electric
truck
19th century
Pioneer of electric vehicles
Page 7
1979
First prototype
hybrid car
1992
1997
1998
Electric-car
Volvo cooperation
Velaro E/Rus
2001/06
ELFA system for Diesel electric
hybrid city buses mining trucks
20th century
Leading provider of electric
drives for trains and public
transport
2008
2010
First hybrid
crane systems
2011
2012
eBus Vienna
21st century
Global system provider for
low-emission electric mobility
© Siemens AG 2013. All rights reserved.
IC RL UT LRV eBus/eBRT
Siemens combines the know-how of urban traffic
solutions and automotive production of electric traction
Product solution
System solution
Dieselelectric bus
Train
system
Hybrid–
electric bus
Metro
system
Fuel-cell
hybrid bus
Battery
bus
Tram
system
eBUS System
Page 8
© Siemens AG 2013. All rights reserved.
IC RL UT LRV eBus/eBRT
A first TCOs comparison indicates lower operating
& maintenance costs for e-Bus
Diesel bus
Price per vehicle 2)
Biogas bus
€
Example
e-Bus
€
€ €
(Fuel) consumption xx l/100km (xxx€/l)
1)
€ € € € p.a.
yy kg/100km (yyy €/kg)
1)
€ € € € p.a.
Fuel production
Fossil – not regenerative
Bio – regenerative but cultivation in Also regenerative energy
account to food
sources possible
Maintenance
As known today
More than diesel busses
(e.g. repair, inspection authority, (e.g. gas tanks, engine corrosion)
emission tests)
Approx. xx ct/km
Approx. yy ct/km
1)
€ € € p.a.
€ € € p.a. 1)
Operating costs
€ € €
1)
€ € € € p.a.
zz kWh/100km (zzz ct/kWh)
1)
€ € p.a.
€ € €
1)
€ € € € p.a.
Less than busses with
combustion engines
Approx. zz ct/km
€ € p.a. 1)
€
€ € p.a. 1)
€
Infrastructure
No special requirements
Gas fuel stations and pipelines
Charging stations (one per 815km and in depot) – also in
combination with Tram
Life time
Chassis 12 years
Motor 12 years
Chassis 12 years
Motor probably <12 years
Chassis 12 years
Battery 5-7 years
Emissions
Noisy
Local CO2
(Euro 6)
Noisy
Local CO2
(Euro 6 at risk)
Silent
No local emissions
1) 70,000 km p.a.
Page 9
2) 8m city bus
© Siemens AG 2013. All rights reserved.
IC RL UT LRV eBus/eBRT
Siemens has introduced successfully a eBus
solution in Vienna with Wiener Linien and Rampini
Project Info
Routes 2A and 3A in the inner City of Vienna
12 busses in operation (8km routes, 10min cycle)
Depot out of the city
Vienna City
Project organization
Routes
appr. 8km
Charging
station
Distance depot to
routes 2A, 3A
appr. 8km
Depot
Consortium of Siemens (Lead) and Rampini (Italy)
Project duration <24 month
Technical Info
Charging at end stations and in depot
Utilization of Tram sub stations
Max. Speed
62 km/h
Capacity
40 passengers (8m bus)
Range w/o charging
120 – 150 km (City traffic)
Battery
LiFe 96 kWh
Drive
ELFA 85 / 150 kW
Sustainability
Zero local emissions (CO2, noise)
More energy efficiency (electric drives, auxiliaries, etc.)
Utilization of renewable energy
Air condition and heating full electric
Maintenance
Reduced maintenance due to less mechanical parts
Page 10
© Siemens AG 2013. All rights reserved.
IC RL UT LRV eBus/eBRT
Higher energy efficiency and cost savings for
maintenance are main advantages of e-Buses
Cost savings for traction energy
Higher energy efficiency
(efficiency of electric drives,
auxiliaries and recuperation)
Reduced maintenance costs due
to less mechanical parts
Utilization of renewable energy
Zero local emissions (CO2, noise)
Air conditioning and full electric
heating
Page 11
© Siemens AG 2013. All rights reserved.
IC RL UT LRV eBus/eBRT
We combine our strong e-technology expertise with
attractive project financing in customized solutions
Page 12
Interoperability with any bus chassis
1
Key competence for major urban transport projects
2
Global no. 1 in electricity and e-traction drives
3
Project financing
4
© Siemens AG 2013. All rights reserved.
IC RL UT LRV eBus/eBRT
Outlook and Recommendation for Next Steps
Set up of a tasks group eBus & eBRT
To get a common deep understanding of eBus and
eBRT solutions we suggest a task group with
Experts of NTA, Bus Manufacturer, Siemens-Israel
and -Austria.
Task 1
Evaluation of potential eBRT lines and key
performance indicators in order to jointly obtain
a deeper understanding for operating full
electric battery buses and/or eBRT buses
Visit Vienna
"Reference Wiener Linien"
in late spring 2013
The new eBus fleet in Vienna
will start its operation in January
2013. By spring 2013 first
operating figures will be available
and could be presented to the
working group.
Task 2
Evaluation of Total Cost of Ownership of full
electric battery buses and eBRT buses in
comparison with conventional diesel buses
Page 13
© Siemens AG 2013. All rights reserved.
IC RL UT LRV eBus/eBRT
Contacts
Gil Bar-Yoav
Sebastian Meding
Siemens AG
Siemens AG
Urban Transport eBus / eBRT
Urban Transport eBus / eBRT
14 Hamelacha Street, 48091 Rosh Ha'ayin
Vienna, Austria and Erlangen, Germany
Phone: +972 (54) 9151575
Phone: +49 172 8116745
gil.bar-yoav@siemens.com
sebastian.von_meding@siemens.com
Page 14
© Siemens AG 2013. All rights reserved.
IC RL UT LRV eBus/eBRT