GE Lighting Machinery Plant, Hungary Introduction 2014 Imagination at work. Introduction Worldwide solution provider • Deliver excellence in machine designing & building in multiple automation solutions • Available machining resources for standard and specialized part manufacturing • Expertise in mechanical and electrical development, automation and integration • Customer focused: long-term spare part availability & support • Managing complex projects • Highly motivated and focused execution teams Design Concept Machining Your success Assembling Support Logistics Dedication to Quality • Meet quality standard of ISO 9001:2009 • Health and Environment committed, EHS: ISO 14001 • Work along Lean & Six Sigma methodologies • All solutions are CE marked L E A N ENTERPRISE Installation Machinery Plant Profile Complex Development & Service type operation specialist Design | Machine build | TOW | Install | Customer Service Budapest (BP) Management Solution Sales Project Man. Hajdúböszörmény (HB) Center of Manufacturing & Subcontracting Excellence in Designing & Assembling 3 Our project methodology Quote Prepare Concept & Design Realizing Install & Debug Logistics Support Continuous project tracking with experienced project leaders Data warehouse Process development Project tracking Capacity management PM in SAP ERP 4 Advanced Design Capabilities in… …Prototyping & benchmarking …Lighting industry leading portfolio …Build-to-print …Complex system improvements …Re-designing machines, production lines, plants …Creating best-in class solution Domain expertise in designing and developing Extensive range of mechanical designing • 2-D & 3-D design capabilities • Applied FEM analysis Wide experience in electrical design • software development • vision systems • process-monitoring system Engineering support Creation of conceptual solutions 6 Specialized knowledge in digitized process monitoring • Data collection and analysis • Reject Analysis • Batch Tracking / Material Usage / Stock • Alarm / Event Analysis, Alarm Summary / History • Trend analysis for technological parameters • Online SPC Analysis / Histograms • Online Digital Score-carding of the Production Line & Sub-systems 10+ years of experience with HMI / SCADA / Monitoring systems • Other specific reporting & data mining 7 Vision Systems & High-end commercial materials 8 Professional machining capabilities CNC machines Significant in-house capacity w/ continuous extension 3D Measuring for multiple industry purposes Special partners In-house sourcing for materials and for subcontracting Machining workshop 10 Machining workshop capacity Machine Group CNC milling machines CNC turning machines CNC grinding machine CNC wire cut machines CNC water jet machine CNC engraving machines Total: Pieces Capacity (whours/y) 15 7 1 4 1 2 30 90.000 42.000 6.000 24.000 6.000 12.000 180.000 Possible capacity extensions (in house) Machine Group Pieces Capacity (whours/y) NC boring mill / milling m/c’s 2 12.000 NC turning machines 3 18.000 5 30.000 Total: 11 Samples of special parts Vibratory Feeder GE Lighting D220x60 Feeder Unit Critical Component Valve Body GE Lighting 50x50x140 Vacuum technical Component CMHL Gas Burner PGT25+ Diaphragm GE Lighting GE Energy 50x25x45 with D0,5 holes Burning Unit Critical Component Gas Turbine Component 12 Validated subcontracting partners Part manufacturers Special technology Surface treatment Service type 40+ partners to solve 10+ partners to solve 5 partners to apply 5 partners to assist in capacity overloads special machining various surface various complex professional supply needs if parts: - extremely small regulations: - nitriding works: - gas systems - extremely large - hardening - - extremely hard - coating with oxides process monitoring systems - galvanizing - assembled units chain parameters. Our full capacity can be doubled. 13 Excellence in assembly capabilities Mechanical & electrical • Professional assembling and setup in advance and on site • Cabinet assembling and high performance electrical system wiring Extensive debugging • Detailed and long-term dry- & hot-runs High-tech Vision • Implement industry-lead process monitoring & vision systems Complex installing • Full production line installation Refurbishment 6 1 Mechanical.. 1 Electrical.. 8 Supply.. …assembly stations Assembling area: 2.200 m2 We can work on up to 3 machines per station with 2,5 m x 2,5 m base concurrently… 15 Excellence in assembly Testing room: 880 m 2 • Built-in: natural gas, oxygen, water, high pressure air • Gases use in bundle: nitrogen, hydrogen, argon, sulfur, helium Additional testing room facility: 6.000 m2 Managing concurrent assembling tasks: • 5 m/c’s | EEH7 line • 4 m/c’s | DEQ 576 line • 5 m/c’s | EEH8 line • 4 m/c’s | DEQ mount • 2 m/c’s | J304 16 Logistics, support In-house capabilities: • Jib crane with 12 tons capacity Packaging and moving capabilities with our validated GE partners. Handling shipping and customs. 17 Energized assembly team worldwide Managing multiple projects 40+ automated machines to build, included 3 complete lines in 2014 Global availability Separated integrator teams on multiple locations across the world 18 Project (Location) | Team HC Integration teams Q4 2012 Q2 Q1 Silver PAR (USA) | 9 Environment project (HUN) | 4 Molding m/c (India) | 4 Q4 Q3 2013 EEH lines (HUN) | 6 GH Hand.Sys. (USA) | 3 Ravenna (USA) | 5 2013 Q1 Q2 3-way WEGO I. (MEX-HUN) | 10 Mount & Mat. Hand Sys. (USA) | 5 EEH lines (HUN) | 6 Silver Par (USA) | 6 3-way WEGO (MEX-HUN) & Apollo (MEX-USA) | 12 Q4 Q2 Ravenna (USA) | 5 H-box mod (HUN) | 4 NT line move (HUN) | 14 GH Hand.Sys. (USA) | 3 Q1 Q3 Q4 2014 Q1 Q2 Case study 20 Project Case Study Scope Purpose of project To design and build a High Speed EEH capsule making line to be installed in GE Lighting’s halogen manufacturing plant in Mattoon, IL. Creating concept Design and manufacture Support and utilities Training in Mattoon GE EEH product: New glass halogen capsules using hard glass tube. Drawings Spare parts Manuals Project Case Study Schedule Sep PO & Project start Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Sep 9 Feb 3 M design Jun 30 E design Sourcing Mar 24 Machining / Cutting Apr 28 M Assy' May 12 E Assy' May 12 Debug/Test/EVP Jul 28 Pack/Ship Sep 15 Install/PVP Project Lifetime In months Quote Prepare Concept Design 2 4 stretched process… Nov 10 Realizing 7 Install Debug 3 Logistics Support 2 15 months from Idea to Production 22 Project Case Study Safety Overview Electric safety must follow GE & Mattoon LP requirement Noise level not exceed by 85dB Major features The line output is 1850/hour good capsule Yield: 95-99%/machine Shrink rate: max 1% Drive mode: Independent drives, indexing motion Parts from unit to unit are fully automated. No manual effort. Operation mode Machines are connected with accumulator chains Indexing mode without logic control Utilities Jog mode with logic control Electric energy Natural gas High pressure air Water Nitrogen Oxygen Forming gas Vacuum Machines controlled by PLC and has independent control cabinet Automatic mode Manual mode (using crank or hand wheel) Chains: Asynchrony motor drive both ends 23 Project Satisfactions # of m/c’s Customer Project Product Procter & Gamble Mostly built-to-print project with effective simplifications and system upgrades pantyliner & tampon 7 Build material handling system for process automation by handling lamp components and parts by conveyor system process development 3 Build H4 baking machines for a lamp component manufacturer based on a GE design baked H4 lamp head 2 Design an manufacture automated mounting machine for a non lighting GE plant circuit breaker 1 (Hungary) GE Lighting NA (USA) Autonix (India) GE Power Controls (Poland) 24 Do you have an Idea? | Contact us: Szabó, István: istvan.szabo5@ge.com 25