Project No. 13-038
CONTACTORS
Belleville Fire Hall/Headquarters and Emergency Operations Centre
Belleville, Ontario
1
1.1
Section 16485
Page 1 of 2
GENERAL
GENERAL REQUIREMENTS
.1
The General Conditions of CCDC2-2008, and the General requirements of
Division 1, form part of this Section and must read in conjunction with the
requirements of this Section, and all related Sections.
.2 The Work of this Section and related Work specified in other Sections shall
comply with all requirements of Division 1.
.3 The Work of this Section and related Work specified in other Sections shall
comply with all requirements of Division 16 section-16010 Electrical
General provisions.
1.2
SUBMITTALS
.1
.2
1.3
Submit product data in accordance with Div.-1.
Submit product information sheet and electrical data.
CLOSEOUT SUBMITTALS
.1
Provide operation and maintenance data for incorporation into the operation
and maintenance manual in accordance Div.-1 close out submittal procedures.
.2
Submit product data sheet in the manual.
2
PRODUCTS
2.1
CONTACTORS
.1
Contactors: to EEMAC No.1CS-1970.
.2
Electrically operated mechanically held controlled by pilot devices as indicated
and rated for type of load controlled. Half size contactors not accepted.
.3
Breaker or Fused switch combination contactor as indicated.
.4
Complete with 2 normally open and 2 normally closed auxiliary contacts unless
indicated otherwise.
Project No. 13-038
CONTACTORS
Belleville Fire Hall/Headquarters and Emergency Operations Centre
Belleville, Ontario
.5
Mount in CSA Enclosure 1 unless otherwise indicated.
.6
Include following options in cover if indicated on the drawings:
.1
Red indicating lamp.
.2
Hand-Off-Auto selector switch.
2.2
Section 16485
Page 2 of 2
EQUIPMENT IDENTIFICATION
.1
Provide equipment identification in accordance with Section 16010 - Electrical
General Requirements.
.2
Size 4 nameplate indicating name of load controlled as indicated.
2.3
MANUFACTURER
.1
.2
.3
Cutler Hammer; Eaton Corp.
Siemens Canada Ltd.
Schneider Electric
3
EXECUTION
3.1
INSTALLATION
.1
Install contactors and connect auxiliary control devices.
END OF SECTION