ASBESTOS INSPECTION REPORT Conducted at: FITERMAN HALL 30 WEST BROADWAY NEW YORK, NEW YORK 10007 Conducted for: DORMITORY AUTHORITY OF THE STATE OF NEW YORK CITY UNIVERSITY OF NEW YORK Prepared By: PEI COBB FREED TEAM AIRTEK ENVIRONMENTAL CORP. 39 WEST 38TH STREET – 12TH FLOOR NEW YORK, NY 10018 AIRTEK PROJECT NUMBER 05-0867 Revised - 09/15/06 TABLE OF CONTENTS Page No. 1.0 BACKGROUND..............................................................................................1 2.0 SCOPE OF WORK.........................................................................................2 3.0 SUMMARY OF FILE RESEARCH..................................................................2 4.0 SUMMARY OF AIRTEK’S INSPECTION RESULTS......................................3 5.0 CONCLUSIONS AND RECOMMENDATIONS...............................................3 6.0 ASBESTOS QUANTITY SCHEDULE.............................................................5 7.0 AREAS NOT ACCESSIBLE ...........................................................................8 8.0 REPORT CERTIFICATIONS..........................................................................8 APPENDICES 9.0 APPENDIX A: Analytical Results and Chain of Custody 10.0 APPENDIX B: File Search Data 11.0 APPENDIX C: Personnel Licenses 12.0 APPENDIX D: Laboratory Accreditations 13.0 APPENDIX E: ACM Location Drawings 1.0 BACKGROUND: Airtek Environmental Corp. has conducted an asbestos survey for the presence of AsbestosContaining Materials (ACM) at the following building: Site: Borough: Address: Fiterman Hall Manhattan 30 West Broadway, New York, NY, 10007 The Investigator and inspector responsible for this project were: Damien Gordon Toylor Hilton Sue Moyna Ali Enayat Nassry Michael Porter Site Visit(s): Report Date: Revision Date: NYS Asbestos Inspector CERT #95-12324 NYS Asbestos Inspector CERT #91-02355 NYS Asbestos Inspector CERT #89-01641 NYC Asbestos Investigator CERT#99570 NYS Asbestos Inspector CERT #91-06440 Expires: 11/30/06 Expires: 05/31/06 Expires: 03/31/07 Expires: 07/04/07 Expires: 10/31/06 10/21/05 through 4/4/06 12/20/05 9/15/06 Field Procedures and Analysis Methodology: Guidelines used for the inspection were established by the Environmental Protection Agency (EPA) in the Guidance for Controlling Asbestos Containing Materials in Buildings, Office of Pesticides and Toxic Substances, DOC #560/5-85-024 and 40 CFR Part 763, Asbestos Hazard Emergency Response Act (AHERA). Field information was organized as per the AHERA concept of Homogeneous Area (HA). A HA is defined as a suspect material of similar age, appearance, function and texture. Each material was grouped together as a specific HA, sampled and then assessed for condition. Bulk samples of suspect ACM were analyzed by Polarized Light Microscopy (PLM) with dispersion staining, as described in 40 CFR Part 763 and the National Emissions Standard for Hazardous Air Pollutants (NESHAPS). The New York State Department of Health has recently revised the PLM Stratified Point Counting Method. The new method, “Polarized Light Microscopy Methods for Identifying and Quantitating Asbestos in Bulk Samples” can be found as item 198.1 in the ELAP Certification manual. The State of New York ELAP has determined that analysis of Non-friable, Organically Bound Materials (NOB) are not reliably performed by PLM. Therefore, if PLM analysis of a NOB yields a negative result, it must be further confirmed by Transmission Electron Microscopy (TEM). All samples were initially analyzed by PLM. Samples which produced a negative PLM result and which are classified as a NOB were then re-analyzed utilizing the TEM methodology. 1 2.0 SCOPE OF WORK: The whole building including interior and exterior, which may be affected by the decontamination and deconstruction, was inspected for ACM: The inspection was characterized by a close visual inspection of all accessible areas. Selective demolition was also conducted to access interstitial spaces suspected of containing ACM. Suspect materials were sampled and inventoried for quantity, condition and friability. Airtek used previous survey results, which had been provided by the Applied Technology Services Inc., in our determination of areas and materials to sample. Materials examined included: 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. 20. 21. 22. 23. 24. 25. 26. 27. 28. 3.0 Tar materials on interior perimeter walls Spandrel/Lintel/Relieving angle flashing and mastic Paper materials on perimeter walls Fiber glass materials on perimeter walls Felt materials on perimeter walls Flashing mastic on beams Black cloth materials on beams Roof materials/flashing Roof tar/paper Roof brick Roof cloth Roof insulation Roof shingles Coping caulk Cap flashing Window caulking Window glazing Roof screed Brick wall mortar Expansion joint caulking Marble mortar & sealant Window frame caulking Column caulking Floor covering materials Cloth/rubber materials on beams Black tar on concrete ceiling Pipe insulation Glue daub SUMMARY OF FILE SEARCH: All available Dormitory Authority of the State of New York (DASNY) files have been reviewed. The following is a listing of our findings: • Previous files – Applied Technology Services Inc. initiated an asbestos investigation at Fiterman Hall on July 12th, 1996 and found the following ACMs throughout the building: Pipe Insulation Mudded Joint Fitting Floor Tile & Mastic Exhaust Duct Insulation Window Glazing Metal Fire Doors Vapor Barrier 2 • Abatement Records –According to abatement records subsequent to the abovereferenced 1996 Survey Report, extensive abatement was conducted in support of the gut rehabilitation. Based on the currently recommended sampling and analytical procedures for ACM materials, Airtek determined that additional sampling was necessary in order to determine the asbestos content of additional suspect materials. 4.0 SUMMARY OF AIRTEK ENVIRONMENTAL’S INSPECTION RESULTS: The asbestos inspection was conducted in several phases from October 21st, 2005 to April 4th, 2006 and involved a thorough visual examination of all areas and sampling of suspect materials that would be impacted during the proposed work schedule. Airtek Laboratory analysis confirmed the presence of asbestos in the amount greater than 1% within the samples collected from the following material: 1. 2. 3. 4. 5. 6. 7. Tar and paper materials on interior of perimeter walls Flashing mastic on exterior of spandrel beams Roof membrane – 15th floor set back north roof Window caulking (Bulkhead Windows) Window frame caulking (Elevator Room Windows) All flooring materials are assumed ACM Roof shingles and tar (Parapet Wall – Chiller) Airtek laboratory analysis determined the samples collected from the following materials to contain less then one percent (<1%) asbestos. 1. 2. 3. 4. 5. 6. 7. 8. 5.0 Felt and fiber glass backing materials on perimeter walls (Contaminated by ACM) Cloth materials on spandrel beams (Contaminated by ACM) Screed Brick wall mortar Expansion joint caulking Marble mortar, sealant and caulking Column caulking and mortar Interior spandrel flashing mastic CONCLUSIONS AND RECOMMENDATIONS: Asbestos-containing materials, which may be affected by the scope of work, have been positively identified at various locations throughout the building. As the identified ACM is to be disturbed by the proposed renovation work, proper asbestos abatement procedures shall be implemented prior to the commencement of such work. All asbestos abatement work shall be performed in accordance with all applicable Federal, State and Local rules and regulations. The abatement project shall be filed with all agencies having jurisdiction over this project, such as USEPA, NYSDOL and NYCDEP. A licensed abatement contractor must perform the removal of all friable and non-friable ACM. Airtek believes that the implementation of these recommendations will serve to best protect human health and the environment. To assure that the removal of the aforementioned ACM is properly and effectively carried out, the following recommendations are proposed by Airtek: 3 A. Develop and implement a schedule that outlines the time frame for removal of ACM. B. Develop complete and concise specifications to effectively deal with removal of the ACM. These specifications should be developed to comply with all applicable Federal, State and Local regulations. C. Retain the service of an independent testing laboratory to monitor the air for possible asbestos contamination before, during and after the removal work. Retain all documentation and correspondence from the removal contractor, the testing laboratory and related items in a permanent record. 4 6.0 ASBESTOS QUANTITY SCHEDULE: Approximate asbestos quantity schedules are presented on the following table: TABLE 1 SUMMARY OF INSPECTION RESULTS FOR ASBESTOS FITERMAN HALL 30 WEST BROADWAY, NEW YORK, NY 10007 PROPOSED WORK SUSPECT ACM THAT MAY BE AFFECTED LAB RESULTS Elbow drain insulation of water tower Roof shingle of water tower Non ACM APPROXIMATE ACM QUANTITY 0 SF Non ACM 0 SF Louvers of cooling tower Non ACM 0 SF Silicone caulk Non ACM 0 SF Glazing Non ACM 0 SF Gypsum wallboard Non ACM 0 SF Condenser gasket Non ACM 0 SF Radiator backing Non ACM 0 SF Hard wall plaster Non ACM 0 SF Pyrobar building block Non ACM 0 SF Deck patch on I-beam above women’s bathroom Cove moulding with glue Non ACM 0 SF Non ACM 0 SF Wall joint compound Non ACM 0 SF Adhesive on duct-fiberglass Non ACM 0 SF Patch on duct insulation Non ACM 0 SF Trowelled on cement on duct Mastic/Glue paper Non ACM 0 SF Non ACM 0 SF White speckled 9×9 VFT Non ACM 0 SF Grey speckled 9×9 VFT Non ACM 0 SF Blue speckled 9×9 VFT Non ACM 0 SF Pipe wrapping in cage Non ACM 0 SF Mudded joint fitting elbow Non ACM 0 SF White 12×12 VFT/mastic Non ACM 0 SF Beige 12×12 VFT/mastic Non ACM 0 SF 5 NOTES/SPECIFIC LOCATION Confirmed by Applied Technology Services Inc. Aug. 1996 Confirmed by Applied Technology Services Inc. Aug. 1996 Confirmed by Applied Technology Services Inc. Aug. 1996 Confirmed by Applied Technology Services Inc. Aug. 1996 Confirmed by Applied Technology Services Inc. Aug. 1996 Confirmed by Applied Technology Services Inc. Aug. 1996 Confirmed by Applied Technology Services Inc. Aug. 1996 Confirmed by Applied Technology Services Inc. Aug. 1996 Confirmed by Applied Technology Services Inc. Aug. 1996 Confirmed by Applied Technology Services Inc. Aug. 1996 Confirmed by Applied Technology Services Inc. Aug. 1996 Confirmed by Applied Technology Services Inc. Aug. 1996 Confirmed by Applied Technology Services Inc. Aug. 1996 Confirmed by Applied Technology Services Inc. Aug. 1996 Confirmed by Applied Technology Services Inc. Aug. 1996 Confirmed by Applied Technology Services Inc. Aug. 1996 Confirmed by Applied Technology Services Inc. Aug. 1996 Confirmed by Applied Technology Services Inc. Aug. 1996 Confirmed by Applied Technology Services Inc. Aug. 1996 Confirmed by Applied Technology Services Inc. Aug. 1996 Confirmed by Applied Technology Services Inc. Aug. 1996 Confirmed by Applied Technology Services Inc. Aug. 1996 Confirmed by Applied Technology Services Inc. Aug. 1996 Confirmed by Applied Technology Services Inc. Aug. 1996 TABLE 1 SUMMARY OF INSPECTION RESULTS FOR ASBESTOS FITERMAN HALL 30 WEST BROADWAY, NEW YORK, NY 10007 PROPOSED WORK SUSPECT ACM THAT MAY BE AFFECTED LAB RESULTS Acoustical ceiling tile 4×2 and 2×2 Spray-on fireproofing Non ACM APPROXIMATE ACM QUANTITY 0 SF Non ACM 0 SF Blue 12×12 VFT/mastic Non ACM 0 SF Light grey 12×12 VFT/mastic Tar materials on interior perimeter walls Spandrel/Lintel/Relieving Angle flashing mastic (Exterior Side) Paper materials on perimeter walls Fiber glass materials on perimeter walls Felt materials on perimeter walls Flashing mastic on beams Non ACM 0 SF ACM 28,755 SF Confirmed by Applied Technology Services Inc. Aug. 1996 Confirmed by Applied Technology Services Inc. Aug. 1996 Confirmed by Applied Technology Services Inc. Aug. 1996 Confirmed by Applied Technology Services Inc. Aug. 1996 1st-15th Floor. Fair condition ACM 28,755 SF 1st-15th Floor. Fair condition ACM 26,793 SF 2nd -15th Floor. Fair condition ACM contaminated ACM contaminated 26,793 SF 2nd -15th Floor. Fair condition 1,962 SF ACM 25 SF Only exists on the 1st Floor. Fair condition Loading dock entrance. Fair condition Loading dock entrance. Fair condition Elevator machine room roof Elevator machine room roof Elevator machine room roof Elevator machine room roof Elevator machine room roof Fan room roof Bulkhead roof Bulkhead roof Bulkhead. Fair condition Bulkhead. Fair condition Bulkhead Bulkhead roof New elevator mechanical room roof New elevator mechanical room roof New elevator mechanical room roof New elevator mechanical room roof. Fair condition New elevator mechanical room roof. Fair condition New elevator mechanical room roof 15th Floor roof 15th Floor roof 14th Floor roof th 14 Floor roof. Fair condition 14th Floor roof 14th Floor roof Black cloth material on beams Roof materials Flashing Coping caulk Cap flashing Screed Flashing Roof materials Flashing Side window caulking Top window caulking Window glazing Screed Roof materials Flashing Coping stone caulk Side window caulking Top window caulking Screed Roof materials Flashing Flashing Roof membrane Screed Roof membrane under screed Flashing Roof membrane ACM contaminated Non ACM Non ACM Non ACM Non ACM Non ACM Non ACM Non ACM Non ACM ACM ACM Non ACM Non ACM Non ACM Non ACM Non ACM ACM 25 SF 0 SF 0 SF 0 LF 0 SF 0 SF 0 SF 0 SF 0 SF 8 LF 4 LF 0 LF 0 SF 0 SF 0 SF 0 LF 8 LF ACM 4 LF Non ACM Non ACM Non ACM Non ACM ACM Non ACM 0 SF 0 SF 0 SF 0 SF 6,950 SF 0 SF Non ACM 0 SF Non ACM Non ACM 0 SF 0 SF 6 NOTES/SPECIFIC LOCATION 5th Floor roof 5th Floor roof TABLE 1 SUMMARY OF INSPECTION RESULTS FOR ASBESTOS FITERMAN HALL 30 WEST BROADWAY, NEW YORK, NY 10007 PROPOSED WORK SUSPECT ACM THAT MAY BE AFFECTED LAB RESULTS APPROXIMATE ACM QUANTITY 0 SF 0 SF 0 SF 0 SF 0 SF 600 LF Screed Brick wall mortar Expansion joint caulking Marble mortar & sealant Marble caulking Window frame caulking Non ACM Non ACM Non ACM Non ACM Non ACM ACM Column caulking Column mortar Floor Covering Materials including Adhesives/Mastics Glue daub Interior spandrel flashing Black tar on concrete Black tar Black roof tar/paper Non ACM Non ACM Assumed ACM 0 SF 0 SF 288,000 SF Non ACM Non ACM Non ACM Non ACM ACM 0 SF 0 SF 0 SF 0 SF 6,950 SF Brown roof insulation Black roof membrane Brown roof paper Red brick material Brown roof cloth Black roof insulation Brown roof insulation Black roof paper White pipe insulation Non ACM Non ACM Non ACM Non ACM Non ACM Non ACM Non ACM Non ACM ACM 0 SF 0 SF 0 SF 0 SF 0 SF 0 SF 0 SF 0 SF 12 LF ACM ACM 80 SF 80 SF 415,168 SF 636 LF Black roof shingle Black roof tar Total Approximate Quantity of ACM 7 NOTES/SPECIFIC LOCATION 5th Floor roof 6th & 15th Floor 6th & 15th Floor st 1 Floor exterior of the building 1st Floor exterior of the building st 1 Floor exterior of the building. Fair condition 1st Floor exterior of the building 1st Floor exterior of the building Throughout the building. Slightly Damaged NW entrance exterior ceiling 1st – 15th Floor rd 3 floor south side ceiling 3rd floor south side ceiling th 14 floor setback roof N. side. Fair condition 14th floor setback roof N. side 14th floor setback roof N. side 14th floor setback roof N. side 14th floor setback roof N. side 14th floor setback roof N. side 14th floor setback roof N. side 14th floor setback roof N. side 16th floor water tank th 5 floor column S. side (Riser Only). Fair condition Cooler roof walls. Fair condition Cooler roof walls. Fair condition 7.0 AREAS NOT ACCESSIBLE: Airtek inspected and sampled materials, which were observable and accessible to the survey team. Any suspect ACM that have not been tested and/or found positive for asbestos, if any, must be assumed ACM until and unless they are tested. 8.0 REPORT CERTIFICATIONS: Airtek certifies that the information contained herein is based on the physical and visual inspections conducted by Airtek and data collected during the inspection survey and file review. Enayat Nassry NYC Investigator Michael Porter, QA/QC . 8 Efren Martinez, Lab Manager APPENDIX A 9.0 Analytical Results and Chain of Custody Certificates of Analysis 9 LABORATORY RESULTS HA # Sample # Location Material 1 DT01-04 West side 15th floor Black tar material 2 DT05-07 South side 14th floor Black tar material 3 DT08-10 East side 13th floor Black tar material 4 DT11-13 North side 12th floor Black tar material 5 DT14-20 West side 11th floor Black tar material 6 DT21-23 South side 10th floor Black tar material 7 DT24-26 East side 9th floor Black tar material 8 DT27-29 North side 8th floor Black tar material 9 DT30-36 West side 7th floor Black tar material 10 DT37-39 South side 6th floor Black tar material 11 DT40-42 East side 5th floor Black tar material 12 DT43-45 North side 4th floor Black tar material 13 DT46-52 West side 3rd floor PLM Results PLM-NOB 16 DT59 Northeast corner 1 floor Black felt material 5.1% Chrysotile 3.6% Chrysotile 3.5% Chrysotile 4.8% Chrysotile 3.9% Chrysotile 3.6% Chrysotile 4.3% Chrysotile 3.2% Chrysotile 3.6% Chrysotile 3.6% Chrysotile 4.2% Chrysotile 5.1% Chrysotile 3.1% Chrysotile 4.6% Chrysotile 2.8% Chrysotile Inconclusive 16 DT60 Northeast corner 1st floor Black felt material Inconclusive 17 DT61-64 West side 15th floor 18 DT65-67 South side 14th floor 19 DT68-69 North side 13th floor 20 DT70-73 North side 12th floor 21 DT74-80 South side 11th floor 22 DT81-83 South side 10th floor 23 DT84-86 East side 9th floor 24 DT87-89 North side 8th floor 25 DT90-96 West side 7th floor 26 DT97-99 South side 6th floor 27 DT100102 East side 5th floor Black paper material Black paper material Black paper material Black paper material Black paper material Black paper material Black paper material Black paper material Black paper material Black paper material Black paper material Black tar material nd 14 DT53-55 Southeast corner 2 floor Black tar material 15 DT56-58 Northeast corner 1st floor Black tar material st 10 TEM-NOB NAD* Trace Chrysotile Inconclusive NAD Inconclusive 1.9% Chrysotile Inconclusive NAD Inconclusive Inconclusive Inconclusive 1.8% Chrysotile Trace Chrysotile NAD 1.9% Chrysotile Inconclusive NAD Inconclusive NAD Inconclusive NAD Inconclusive NAD HA # 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 Sample # DT103105 DT106112 DT113115 DT116120 DT121123 DT124125 DT126129 DT130136 DT137139 DT140142 DT143145 DT146152 DT153155 DT156158 DT159161 DT162168 DT169171 45 HS01 45 HS02 45 HS03 46 HS04 46 HS05 46 HS06 47 MA01-03 48 MA04-06 49 MA07-09 50 MA10-12 51 MA13-15 52 MA16-18 Location Material PLM Results West side 3rd floor TEM-NOB 1.5% Chrysotile Black paper material Black paper material North side 4th floor PLM-NOB Inconclusive NAD Inconclusive NAD Inconclusive NAD Inconclusive NAD Inconclusive NAD Inconclusive NAD Inconclusive NAD Inconclusive NAD Inconclusive NAD Inconclusive NAD Inconclusive NAD Inconclusive NAD Inconclusive NAD Inconclusive NAD Inconclusive NAD Inconclusive NAD Inconclusive NAD Inconclusive Trace Chrysotile Inconclusive NAD nd Southeast corner 2 floor West side 15th floor South side 14th floor North side 13th floor North side 12th floor West side 11th floor South side 10th floor East side 9th floor North side 8th floor West side 7th floor South side 6th floor East side 5th floor North side 4th floor West side 3rd floor nd Southeast corner 2 floor On beam at loading dock entrance On beam at loading dock entrance On beam at loading dock entrance On beam at loading dock entrance On beam at loading dock entrance On beam at loading dock entrance Elevator machine room roof Elevator machine room roof Elevator machine room roof Elevator machine room roof Elevator machine room roof Fan room roof Black tar material Black fiber glass backing Black fiber glass backing Black fiber glass backing Black fiber glass backing Black fiber glass backing Black fiber glass backing Black fiber glass backing Black fiber glass backing Black fiber glass backing Black fiber glass backing Black fiber glass backing Black fiber glass backing Black fiber glass backing Black fiber glass backing Black cloth material Black cloth material Black cloth material Black cloth material Black cloth material Black cloth material 3.6% Chrysotile NA NA Roof material Inconclusive NAD Flashing Inconclusive NAD Coping caulk Inconclusive NAD Cap flashing Inconclusive NAD Inconclusive NAD Screed Flashing 11 NAD HA # Sample # Location 53 54 MA19-21 MA22-24 Stair roof Stair roof Roof material Flashing 55 MA25 Stair roof Side window caulking 55 MA26 Stair roof 55 MA27 Stair roof 56 MA28 Stair roof 56 MA29 Stair roof 56 MA30 Stair roof 57 58 MA31-33 MA34-36 59 MA37-39 60 MA40-42 61 Stair roof Stair roof New mechanical equipment room roof New mechanical equipment room roof MA43-45 62 MA46 62 MA47 62 MA48 63 MA49 63 MA50 63 MA51 64 MA52-54 65 66 67 MA55-57 MA58-60 EN01 67 EN02 67 EN03 68 EN04 68 EN05 68 EN06 Material PLM Results Side window caulking Side window caulking TEM-NOB Inconclusive Inconclusive 2.6% Anthophyllite and 1.6% Chrysotile NAD NAD NA** NA 2.6% Anthophyllite and 1.1% Chrysotile Top window caulking Top window caulking Top window caulking Window glazing Screed PLM-NOB NA NA Inconclusive NAD Roof material Inconclusive NAD Flashing Inconclusive NAD New mechanical equipment room roof Coping stone caulk (Alumina covers) Inconclusive NAD New mechanical equipment room roof Side window caulking 3.5% Anthophyllite and 1.6% Chrysotile New mechanical equipment room roof New mechanical equipment room roof Side window caulking Side window caulking New mechanical equipment room roof Top window caulking New mechanical equipment room roof New mechanical equipment room roof New mechanical equipment room roof 15th floor roof 15th floor roof 14th-floor roof west side 14th-floor roof adjacent to entrance 14th-floor roof park place side 14th-floor roof west side 14th-floor roof adjacent to entrance 14th-floor roof park place side Top window caulking Top window caulking Screed NAD NA NA 3.4% Anthophyllite and 2.2% Chrysotile NA NA NAD Roof material Flashing Flashing Inconclusive Inconclusive Inconclusive NAD NAD NAD Flashing Inconclusive NAD Flashing Inconclusive NAD Roof membrane Inconclusive Roof membrane Inconclusive Roof membrane 2.8% Chrysotile 12 HA # Sample # Location Material PLM Results PLM-NOB TEM-NOB Inconclusive NAD Screed Inconclusive NAD Roof membrane under screed Inconclusive NAD Flashing Inconclusive NAD Flashing Inconclusive NAD Flashing Roof membrane Inconclusive Inconclusive NAD NAD Roof membrane Inconclusive NAD Roof membrane Screed Inconclusive Inconclusive NAD NAD Screed Inconclusive NAD Inconclusive NAD Inconclusive NAD Inconclusive NAD Inconclusive NAD Inconclusive NAD Inconclusive NAD Inconclusive NAD th 14 -floor roof park place side 14th-floor roof park place side 14th-floor roof park place side 14th-floor roof W Broadway side 5th floor roof east side adjacent to entrance 5th floor roof southwest corner 5th floor roof north side 5th floor roof east side 5th floor roof adjacent to AC exhaust system 5th floor roof north side 5th floor roof east side 5th floor roof adjacent to AC exhaust system 5th floor roof north side 15th Floor north side wall 15th Floor north side wall adjacent to the Exit 15th Floor west side wall 15th Floor southwest Section 15th Floor southeast section 15th Floor East Side Wall 15th Floor Northeast Section 69 EN07 69 EN08 69 EN09 70 EN10-12 71 EN13 71 EN14 71 72 EN15 EN16 72 EN17 72 73 EN18 EN19 73 EN20 73 74 EN21 EN22 74 EN23 74 EN24 74 EN25 74 EN26 74 EN27 74 EN28 75 EN29 15th Floor North Side 75 EN30 15th Floor Northwest Side 75 EN31 15th Floor West Side Screed Screed NAD Screed Brick wall mortar NAD Brick wall mortar NAD Brick wall mortar NAD Brick wall mortar NAD Brick wall mortar NAD Brick wall mortar NAD Brick wall mortar NAD Expansion joint caulking Expansion joint caulking Expansion joint caulking th 74 EN32 74 EN33 74 EN34 74 EN35 74 EN36 74 EN37 74 EN38 75 EN39 75 EN40 75 EN41 6 Floor North Side SetBack Roof 6th Floor Northwest Side Set-Back Roof 6th Floor Southwest Side Set-Back Roof 6th Floor Southeast Side Roof Brick wall mortar NAD Brick wall mortar NAD Brick wall mortar NAD Brick wall mortar NAD 6th Floor East Side Brick wall mortar NAD 6th Floor Northeast Roof 6th Floor Northeast Section Park Place Side 6th Floor North Side Above the Window Brick wall mortar NAD Brick wall mortar NAD Expansion joint caulking Expansion joint 6th Floor Northwest Side caulking Expansion joint caulking 6th Floor West Side 13 HA # Sample # Location st 76 EN42-44 77 EN45 77 EN46-48 78 EN49-51 79 EN52-54 80 EN55 80 EN56 81 EN57-59 82 EN60-62 83 84 84 84 85 86 86 86 86 MP1-3 MP4 MP5 MP6 MP7-10 MP11 MP12 MP13 MP14 87 MP15-17 88 MP01-03 89 MP04-06 90 MP07-09 91 DT01-03 92 DT04-06 93 DT01 93 DT02-03 94 DT04-06 Material PLM Results PLM-NOB TEM-NOB Inconclusive NAD Marble caulking gray Inconclusive NAD NAD 1 Floor Exterior of the building Greenwich Side Marble mortar/sealant 1st Floor exterior Greenwich side adjacent to the steps 1st Floor exterior adjacent to the main entrance W Broadway side 1st Floor exterior left side of Main entrance W. Broadway side 1st Floor exterior adjacent to the main entrance btwn. Wall & sidewalk W Broadway side Marble mortar gray NAD Marble mortar gray NAD Marble caulking black Inconclusive 1st Floor exterior window frame & marble wall Window frame caulking gray 3.5% Anthophyllite and 1.3% Chrysotile 1st Floor exterior window frame & marble wall 1st Floor exterior building column 1st Floor exterior building column W. Broadway side 6th Floor Exterior North 6th Floor Exterior North 6th Floor Exterior West 6th Floor Exterior West 15th Floor Exterior North 15th Floor Exterior North 15th Floor Exterior East 15th Floor Exterior South 15th Floor Exterior West Exterior Ceiling – NW Entrance 3rd Floor Interior Spandrel 6th Floor Interior Spandrel 14th Floor Interior Spandrel 3rd Floor South Side Ceiling 3rd Floor South Side Ceiling 14th Floor Setback Roof N. Side 14th Floor Setback Roof N. Side Window frame caulking gray Column caulking dark gray 14th Floor Setback Roof N. Side NA Inconclusive NAD Spandrel Flashing Spandrel Mastic Spandrel Mastic Spandrel Mastic Spandrel Flashing Spandrel Mastic Spandrel Mastic Spandrel Mastic Spandrel Mastic Inconclusive 6.4% Chrys. 7% Chrys. 6.1% Chrys. Inconclusive 5.5% Chrys. 6.2% Chrys. 6.7% Chrys. 6.1% Chrys. NAD NAD Glue Daub Inconclusive NAD Flashing Inconclusive NAD Flashing Inconclusive NAD Flashing Inconclusive NAD Inconclusive NAD Column mortar dark black Black tar on concrete NAD NAD Black tar Black roof tar/paper Black roof tar/paper Brown roof insulation 14 6.4% Chrys. NA NAD HA # Sample # Location th 95 DT07-09 96 DT11-13 97 DT14-16 98 DT17-19 99 DT20-22 100 DT23-25 101 DT01-03 102 DT04 102 DT05-06 103 103 104 105 DT01 DT02-03 DT04 DT05-06 14 Floor Setback Roof N. Side 14th Floor Setback Roof N. Side 14th Floor Setback Roof N. Side 14th Floor Setback Roof N. Side 14th Floor Setback Roof N. Side 14th Floor Setback Roof N. Side 16th Floor Water Tank 5th Floor Column South Side 5th Floor Column South Side Cooler Roof Walls Cooler Roof Walls Cooler Roof Walls Cooler Roof Walls Material PLM Results Black roof membrane Brown roof paper NAD Red brick material NAD Brown roof cloth NAD Black roof insulation Brown roof insulation Black roof paper White Pipe Insulation White Pipe Insulation Black roof shingle Black roof shingle Black roof tar Black roof tar NAD*=No Asbestos Detected NA**=Not Analyzed 15 PLM-NOB TEM-NOB Inconclusive NAD Inconclusive NAD NAD NAD 31% Chrys. NA 2.7% Chrys. NA 5.8% Chrys. NA APPENDIX B 10.0 File Search Data (Previous report reviewed: ATS, Inc. 06/97) APPENDIX C 11.0 Personnel Licenses APPENDIX D 12.0 Laboratory Accreditations APPENDIX E 13.0 ACM Location Drawings