View Instructions

advertisement
AEL-CK SERIES
Aeon
Ceiling Mounted Fixture
Models 232-CK/432-CK
Safety Precautions
Read all safety precautions and installation instructions carefully before
installing or servicing this fixture. Failure to comply with these instructions
could result in potentially fatal electric shock and/or property damage.
It is recommended that a qualified electrician perform all wiring. This fixture
must be wired in accordance with all national and local electrical codes.
Do not handle any energized fixture or attempt to energize any fixture with
wet hands or while standing on a wet or damp surface or in water.
Model numbers ending in MV are designed for use in a 120-277VAC, 60Hz
fused circuit; otherwise the fixture is designed for use in a 110-120VAC,
60Hz fused circuit. Do not use on a dimming circuit unless unit is provided
with appropriate dimming ballast.
To reduce the risk of electrical shock, and to assure proper operation, this
fixture must be adequately grounded. To accomplish proper grounding, there
must be a separate ground wire (green) or bare metal contact (metal conduit)
between this fixture and the ground connection of your main power supply
panel. The green ground screw location is clearly marked on the fixture
housing.
This fixture is intended to be used for dry indoor, lighting locations
.
Tools Required: Phillips Screwdriver, Adjustable Wrench & Pliers.
Hardware Required: Appropriate mounting hardware
Parts Inventory (Items to be Assembled)
Packed inside the carton
1)
2)
3)
4)
5)
6)
1 Channel Sub-assembly with socket/bracket subassembly (Cut the plastic tie wraps on the flat carton)
Note: Same as Fig 2
Four cable wire sub-assembly with (11), (13), (15), (16)
(See Fig 1)
Power Cord: (9), (10), (12), (14), (17)
Canopy/Plate Sub-assembly: (3), (4), (5), (6), (7), (8)
Parts bag: 6 Small wire connectors
One 4ft metal frame with diffuser (22) (See Fig 5)
Assembly Instructions
1. Preparing for installation
A.
2.
Consult a local licensed electrician or electrical contractor
about installing the fixture if you are not sure about
installation.
Select a suitable dry location (use for indoors only). Make sure
mounting surface is capable of supporting the 17lbs weight of the
fixture.
3. Installing Fixture Mounting Plate (Use Fig 1)
(Fixture Total Load Weight: 17 lbs)
A. Before you install the mounting plate (6) that is shown in Fig 1), make sure
the four ¼-20 screws (5), four lock washers (8) and four hex nuts (4) are
installed and secured mechanically to the plate (6) and also make sure
that the in-line power service wires (black/white//green) are routed to
the plate 9/16 diameter hole for power-service hook-up. Now install the
plate on the outlet box. Note: To rigidly secure the plate we recommend to
use an outlet box and extra support hardware ¼ trade size screws (not
included) or 1/4 toggle bolts (not included) at the four ¼ diameter hole
located at both corner ends of the plate (6).
4. Assembling Canopy / Plate with Four Cable Wire and Power
Cord (Use Fig 1)
First remove the four cables and the power cord sub-assemblies that are packed in the plastic bag.
•
Install the power cord top strain relief (10) by using the 1/8IPS hex nut (9) to
mechanically secure to the 13/32 diameter hole on the canopy (5).
NOTE: You need to connect the in-line power service to the power cord – First, to
adjust the length of the cord, you must loosen the outside portion of the top strain relief
(10), with the wire nut provided connect the black in-line power service to the power cord
black wire, next with the wire nut provided connect the in-line white wire to the white
wire of the power cord, now with the wire nut provided connect the in-line ground wire
to the power cord green wire.
•
Install the canopy (3) to the plate (6) by aligning the four ¼-20 screws to the canopy (3)
four 9/32 diameter holes, with one your hands holding up the canopy to the plate, install
the four cable top holders (11) to the four ¼-20 screws (5). Make sure that cable top holders are mechanically secured.
•
Now, adjust the power cord length and fasten to tighten the strain relief outside portion to maintain the desired length.
5. Assembling Channel with Four Cable Wire and Power Cord (Use Fig 1 to Fig 4)
•
•
1 of 2
First, remove the four hex nuts (16) on the four cable sub-assemblies and also remove one 1/8IPS (14) bottom hex nut on the power cord.
Second, remove the channel cover (2) by following the instructions in Fig 3.
8060251 R1
AEL-CK SERIES
Models 232-CK/432-CK
•
•
Aeon
Ceiling Mounted Fixture
Third, install the four cable wire sub-assemblies, to install you must place the four cable bottom holders (15) at the ¼ diameter holes as shown in Fig 2.
Note: Make sure the cable wires are all same length, (to adjust cable length, loosen-up the top portion of the cable bottom holder (15) then adjust to
proper length and tighten to secure the desired length.
Fourth, install the power cord bottom strain relief (12) at the 13/32 diameter hole near the ballast side as it is shown in Fig 2 and make sure to
mechanically secure it with the bottom 1/8IPS hex nut (14).
Note: Make sure the power cord length is longer (1/2 inch) than the cable wire length. (to adjust cord length, loosen-up the outside portion of the
strain relief (12) then adjust to proper length and tighten to secure the desired length.
6. Wiring the Fixture
A.
B.
First, connect the ballast black wire with the wire nut provided to the black wire of the power cord (17), now, connect the ballast white wire with the wire nut
provided to the white wire of the power cord and with the wire nut provided connect the power cord green wire to the ground wire of the fixture (Fig 1).
Now, re-install the channel cover (2) to the channel (1) as per the instruction in Fig 3.
7. Installing the 4FT Metal Frame with the Two ¼-20 screws (Use Fig 5).
A.
Tip the 4ft metal frame as it shown in Fig 5 and make sure the frame bracket bent tab is on the hole of the socket bracket (19), then swing the other end of
the frame Up and against the socket bracket (18), now align the holes of the frame bracket (21) to the socket bracket (18) two holes. Now, you can install and
tighten the two ¼-20 x 5/8 screws. To install the screws, you have to start from the top of the socket bracket (18) and screwed on to the two threaded holes of
the frame bracket (21). Note hold on one hand and use the other hand to fasten the two screws.
Limited Factory Warranty
American Fluorescent Corporation hereby warranty that this fixture is free from defects in materials and workmanship when installed and used under
normal operating conditions for a period of 2 years from date of purchase from factory. This warranty covers all component parts and extends only to
replacement of defective fixture or components; it does not cover failure due to improper installation, misuse, mishandling or damage incurred in transit.
2 of 2
8060251 R1
Download