for Astrophysics and Space Research QUALITY ASSURANCE MANUAL MAY 15, 2014 COMPILED BY: APPROVED BY: CYNTHIA HIGGINS ADMINISTRATOR ROBERT GOEKE CHIEF ENGINEER APPROVED BY: APPROVED BY: BRIAN KLATT MISSION ASSURANCE MANAGER MARSHALL BAUTZ ASSOCIATE DIRECTOR, MKI 77 Massachusetts Avenue, Building NE83-541, Cambridge, MA 02139 Phone: 617-253-7555: E-Mail: bk@space.mit.edu; Website: space.mit.edu 99-00000 Page 1 of 6 Revision A Rev. A ECO Description Initial Release Author B. Klatt Approved M. Bautz Date 07/16/14 Massachusetts Institute of Technology Kavli Institute for Astrophysics and Space Research (MKI) Quality Assurance Manual Dwg. No. 99-00000 Revision A May 15, 2014 99-00000 Page 2 of 6 Revision A Table of Contents PREFACE 4 1.0 OBJECTIVE 5 2.0 GENERAL 5 3.0 RESPONSIBILITIES 5 4.0 PROCEDURES 6 99-00000 Page 3 of 6 Revision A Preface Revision A is the Initial Release of the Kavli Institute for Astrophysics and Space Research (MKI) Quality Assurance Manual written by Brian Klatt on 05/12/14. 99-00000 Page 4 of 6 Revision A 1.0 Objective 2.0 General This Quality Assurance Manual establishes requirements and guidance for planning, design, fabrication, testing, delivery, and support of equipment and instruments for use in space experiments by Massachusetts Institute of Technology (MIT) Kavli Institute for Astrophysics and Space Research (MKI). The Quality Assurance Program is administered by the Mission Assurance Manager in concert with the Principal Investigator (PI), scientists, Program Management, and Engineering. The Mission Assurance Manager has direct Access to the Director of MKI as well as the Principal Investigator (PI). Most of MKI products and services are used in a space environment, and are therefore un-serviceable. “Getting it right” is of paramount importance. This manual outlines policies and procedures necessary to insure the highest efficacy for MKI products and services. The Quality Assurance Manual provides guidance for a quality assurance program to support activities needed for programs and projects undertaken by MKI. It states what is to be controlled and defines the general requirements and policies to be followed in implementing the MKI Quality Assurance Program. The Quality Assurance Manual is further supplemented by procedures, which contain detailed instructions defining the implementation of overall quality assurance policy. These procedures are not limited to quality control but include Engineering and Fabrication. This Quality Assurance Manual is intended to comply with the intent of SAE Aerospace Standard AS 9100C, Dated 2009-01. It is fully recognized that some programs and some sponsors or customers may have different requirements from the requirements imposed herein or by standard MKI Procedures. The MKI Mission Assurance Manager has the authority to implement requirement adjustments as needed. 3.0 Responsibilities Mission Assurance at MKI is rather broad in scope. Mission Assurance is responsible for not only Quality Management and Quality Control, but also a number of Engineering and administrative functions. Listed below are some of the broad aspects of Mission Assurance. Materials and Processes Non-conformances and FRACAS Calibration and Metrology Government – Industry Data Exchange Program (GIDEP) Software Assurance Electronic, Electrical and Electro-mechanical Parts Inspections – Incoming, In-process, and Final Material Review Board, Failure Review Board, and Parts Control Board System Safety and Hazards Analysis Risk Assessment/Risk Management Procurement and Flowdown Supplier Assessment/Supplier Approval Reliability Contamination Control Workmanship, Certifications and Training 99-00000 Page 5 of 6 Revision A 4.0 Procedures Workmanship and processes are very often best controlled by written procedures. To this end, MKI has prepared numerous procedures which are documented. Some procedures are the result of good quality control practices. Some procedures are the result of customer or sponsor requests or requirements. Not all procedures are applicable to all projects or programs. Listed below are MKI procedures which are or have been used on various programs, as applicable. 99-01001 Alerts and Safe Alerts 99-01002 Drawings and Specifications 99-01003 Electrostatic Discharge, Handling of Parts and Equipment (ESD) 99-02001 Inspection and Documentation 99-02002 Workmanship Requirements for Electronic Equipment 99-02003 Calibration Procedure for Measuring and Testing Equipment 99-02004 Nonconforming Material and Nonconforming Material Reports 99-02005 MKI Audit System 99-02006 Receiving Inspection 99-02007 Inspection Stamps 99-02008 Fasteners 99-02009 In-Process and Final Inspections 99-02010 Procurement 99-02011 Testing of Discrete Electronic Parts 99-03001 Fabrication Documentation 99-03002 Connector Mating and Demating Procedures 99-03003 Component Lead Preparation Procedure 29-00103 Printed Wiring Boards (ASTRO-E) 36-01424 Detector Assembly Pressure Test Procedure (ACIS) 36-02030 Packaging, Packing, Handling, Storage and Transportation (ACIS) 36-02035 High Speed Tap Installation And Removal 36-02105 Printed Wiring Boards (ACIS) 64-02017.2009 Safe Handling of Flight Hardware Procedure 64-02017.2010 Procedure for Control of Metallic Raw Materials 64-02017.3003 Handling Detector Wires 64-02017.3005 Post Vibration Quality Assurance Inspection Procedure 99-00000 Page 6 of 6 Revision A