Public Meeting Interstate 35 From FM 2843 to FM 2484 April 23, 2009 Salado Intermediate School - 6:30 p.m. IH 35 From FM 2843 to FM 2484 April 23, 2009 Salado Intermediate School - 6:30 p.m. Agenda Welcome & Introductions – Richard J. Skopik, P.E., Waco District Engineer Summary of Cooperation between TxDOT and Village of Salado - Merle Stalcup, Mayor, Village of Salado Project Description – Alisa K. Polansky, P.E., IH 35 Project Engineer Adjourn for Comments and Questions PROJECT BACKGROUND The Texas Department of Transportation is in the process of expanding and reconstructing IH 35 through central Texas. This includes 17 projects covering 3 counties for a total length of over 90 miles between the Bell/Williamson county line and the East/West split in Hillsboro. PROPOSED PROJECT The proposed project will consist of a six-lane controlled access facility with one-way frontage roads. The latest total estimated cost of construction for this project is approximately $90 million. Additional right of way would be required for the project. The project being discussed at tonight’s meeting would widen IH 35 through Salado from FM 2843 to FM 2484. The alignment presented tonight is a result of public input received from public meetings in July 2000, March 2001 and May 2007 as well as meetings with public officials and property owners. As a result of public involvement, TxDOT has made several design changes to the originally proposed schematic including additional exit ramps and a narrower right-of-way section. PROJECT SEQUENCE – Anticipated Schedule Public Hearing – Early 2010 Begin Right-of -Way Acquisition – 2010 Construction – Pending availability of funding MORE INFO To make an appointment to review the schematic at a TxDOT office, contact Alisa K. Polansky, P.E., IH 35 Project Engineer at (254) 867-2719. Information about this project is also available on the TxDOT website. Go to the TxDOT website at: www.txdot.gov. On the home page, click “Public Hearings and Meetings.” From this page you can view maps of the design schematic and submit written comments by clicking “e-mail us.” You may submit written comments by mail to: Albin A. (Andy) Petter, P.E. Waco District Director of Transportation Planning and Development Texas Department of Transportation 100 South Loop Drive Waco, TX 76704-2858 TxDOT will accept comments on the project until we finalize the environmental studies and complete our public involvement process later this year. However, so that we may evaluate the comments in a timely manner, please try to submit all comments by Monday, May 4, 2009.