Devin Learn Construction Management Dr. Messner Lancaster General Hospital 5th & 6th Floor Fit-Out, Cardiac Elevator Lancaster, Pennsylvania 3/9/07 Draft Presentation Outline Introduction- Introduction of Myself (1) Introduction of Lancaster General Hospital Project (2) Introduction of Depth and Breadth Topics (1) Depth Research- Commissioning Projects in Existing Facilities Intro (1) Research Details-Survey Results/Analysis (3) Research Conclusion (1) Breadth 1- MEP Connections at ICRA Partitions (1) Research Details – Schedule Impact/Cost Analysis (2) Research Conclusion (1) Breadth 2- Changing CIP Floor Slabs to PreCast in Elevator Tower (1) Research Details – Schedule Impact/Cost Analysis (2) Research Conclusion (1) Summary Conclusion- Summarize Conclusions from 3 topics (2) Acknowledgements- Acknowledgements to people who have assisted in research and information as well as my project company Benchmark Construction Company Inc. and their staff. (1) Summary & Questions Slide- (1) Total Slides- (20) + any slides for expected applicable questions.