Management Information Service Current work Current work The following tasks were prioritised at the last service board, each task is listed with progress and current status Area PG MI reports Project 1.3 Dashboard phase 2 Additional RFT codes for students suspended/withdrawn due to visa restrictions HR reporting ELQ Reporting Description These report have been released for testing and subject to any post-testing changes they will be released to the production environment. The dashboards have been extended to include information on PGR students, completion and supervision information. This project has benefited from the work done as part of the HR project. Analysis complete of change to codes Status On-going The first phase of the project, modelling and loading HR establishment data into the Warehouse is largely complete. The HR project team are now writing reports over this model. The changes to the Cognos planning model, student head and load reports have been made are in testing. On-going Complete Complete Under going system test In addition to the work agreed at the service board the following work has been undertaken. Area HESES Model Description A proof of concept has been completed to model the HESES return for UG FT students as a sanity check for the existing excel based method. Status Complete