August 2015 Project Status: Charlotte-Mecklenburg Storm Water Services is in the final stages of the design phase. A constructability review of the final design plans is underway, and a few minor revisions may be needed. Upon completion of the constructability review, the project will start the bid phase. Next Steps: During the bid phase, competitive bids are taken from responsible contractors to perform the work. After City Council approval, the City awards the construction contract to the lowest responsible bidder. The bid phase typically lasts 6 to 9 months. For more information: Please contact Adrian Cardenas, Project Manager acardenas@charlottenc.gov 704-336-4682 stormwater.charmeck.org Meadowridge Storm Drainage Improvement Project Engineering & Property Management Storm Water Services Division 600 East Fourth Street Charlotte, North Carolina 28202 Investing in Infrastructure The City must replace pipes, storm drains and other structures when they deteriorate or become too small to handle increases in stormwater. Investing in infrastructure protects public safety, guards private property, improves water quality and enhances quality of life. The Meadowridge Storm Drainage Improvement Project goal is to improve the storm drainage infrastructure within the neighborhood, reducing the channel erosion and flooding concerns. For more information: stormwater.charmeck.org