Conway/Briabend s t o r m June 2010 Background/History of the Project: Charlotte-Mecklenburg Storm Water Services and consulting engineers, US Infrastructure and Armstrong Glen, are in the Real Estate Phase of the Conway/Briabend Storm Drainage Improvement Project. This project will repair existing culverts, storm drainage and channel systems to reduce house and street flooding within the area bounded by Scaleybark Road, South Boulevard and Woodlawn Road. Current Status and Next Steps: The consulting engineers have submitted the final design plans. City staff is reviewing the final plans and other construction documents. Most easements have been acquired. Julie Millea with City Real Estate is finalizing easement acquisition on a few properties directly affected by the proposed project construction. d r a i n a g e i m p r o v e m e n t p r o j e c t your storm water fees at work For more information about this project, please visit our website to view project updates and exhibits at: http://stormwater.charmeck.org. Click on Storm Water Projects, Storm Water Projects again and then Conway/Briabend. If you have any questions regarding this project, please contact the Project Manager, Jennifer Barker, at 704-432-0963 or email jbarker@charlottenc.gov. Engineering & Property Management Storm Water Services Division 600 East Fourth Street Charlotte, North Carolina 28202