Storm Drainage Improvement Project
February 2011
Dear Resident:
Construction is underway for Charlotte-Mecklenburg Storm Water
Services’ Conway/Briabend Storm Drainage Improvement Project.
United Construction was awarded the construction contract and
began work in November.
The sidewalk at Collinswood Language Academy is complete and the
area will be seeded soon. The pipe system for the school ballpark
dry detention pond and Firwood side drainage system are being
completed. Excavation continues on the detention basins at the
ballpark and Firwood.
For more information about this project, please visit our website to
view project updates at: http://stormwater.charmeck.org. Click on
the Storm Water Projects dropdown menu in the green bar, then
Active Projects and Conway/Briabend.
Contractors install a 48” pipe at the ballpark detention area.
If you have any questions, please contact one of the team members:
On-site Construction Inspector:
Scott Ackerman: 980-721-3653
Email: sackerman@charlottenc.gov
Construction Manager:
Gary Stansbury: 704-336-2667
E-mail: gstansbury@charlottenc.gov
Project Manager:
Jennifer Barker: 704-432-0963
Email: jbarker@charlottenc.gov
A construction inspector will be on site daily to address any questions or concerns.
Please note that efforts are taken to minimize disruption to nearby property owners.