Building Consistency Meeting Residential Date: 12/5/12 Recorder and minutes prepared by: Jay Garbus/Jeff Griffin/Lon McSwain Staff present: On File Public present: Charles Sofinowski (MI Homes);Jeff Gerdes (Livewell); Wayne Carter (Arthur Rutenburg);Daniel McBride (Cannane Group); Alan McGee (McGee Brothers);Kelly Strickland (The Coville Co.);Matthew Klaphcke ( M&M Construction);Dave Reynolds (Builders First Source);Kenny (Cornerstone Builder Group); Mark Blyth (BNA Homes); Jerry Anderson( NRV); Kevin Vaughan (Muskrat Marine Construction); Ryan Meevwsen (MI Homes) Topics/Subject Decisions/Conclusions/Actions Old Business None New Business Bay window roof & shed roof ventilation Tray ceiling insulation Garage lug wall bracing/anchor FD inspection stem wall on slab Basement with horizontal ties to footers Auto Notification Expiring permits Exception in code allows small roof lines over conditioned space that need only 1 sq ft or less or ventilation to be vented with continuous soffit vents, this was put into the code to allow small bays to be vented without a ridge or roof type vent. See R806.2 Vertical batt insulation meeting R-30 in tray ceiling applications are still consider ceiling and do not have to meet the encapsulation requirement for walls but must be secured in place to prevent falling and blown insulation used in combination must maintain required depths for R30 as well. Cannot sit on brick veneer wall, needs to be bonded to cast in place concrete or masonry block. If brick is structurally bonded it becomes a double wythe and code allows that application. Question was asked if a foundation inspection was required on a stem wall slab foundation prep. If top of footer can be seen only need to call in slab inspection. If it cannot be seen then call in a FD inspection for backfill purposes. No code requirement to tie the basement wall into the vertical portion of the continuous footing unless design professional requires the walls to be tied. Updates to this program that notifies contractors when their inspection is next have all been made and implemented. This allows text message/E-mails to be sent to the contractor with as many points of contact as they would like to setup. Instructions on how to get setup are on our website www.meckpermit.com and available on the contractors account sign in screen. Contractor is responsible to renew permits; G.S. gives the guidelines for when permits expire. Do not call in a frivolous inspection to be in compliance as it will not be accepted to continue the permit. G.S. City 160A-418 or County 153A-358 Required inspections Building Code Council Vapor barrier Required by the state under the Administrative code Section 107 and by department policy G.S. City 160A-412, County 153A-352. Specific list is being created on requirements at each stage and general template will be available at next meeting. Next Building Code Council hearing 10 DEC 12 in Raleigh. Several residential items are on the schedule and will outcomes or general discussions will be brought back to the January 2, 2013 consistency meeting. Requires 6” overlap or if less than the 6” taping would be allowed however there is no requirement to tape if minimum lap is maintained per R506.2.3 Approved By ___Lon McSwain_________ Date _____12/30/2012__