Rte. 79/I-195 Interchange Study Terms and Definitions ABP—Accelerated Bridge Program: $3 billion bond program to fund bridge repair and replacement in the Commonwealth. Passed by Legislature in 2008; runs thru 2016. ADT: Average daily traffic Bridge deck—Riding surface for traffic Bridge load rating—Calculates the current load-bearing capacity of a bridge or culvert. Bridge inspection—The general condition ratings are an overall assessment of the physical condition of the deck (riding surface), the superstructure (load carrying members such as beams or trusses that support the driving surface), substructures (abutments and piers). Cross girder—A large steel or reinforced concrete girder member placed perpendicular to and to support main girders or trusses of a bridge span. EB—Eastbound FREE—Fall River Energy Enterprise Environmental Notification Form (ENF)—Analysis of environmental benefits and impacts filed with Executive Office of Energy and Environmental Affairs LOS—Vehicle Level of Service MassDOT—The Commonwealth’s new Dept. of Transportation (DOT) NB—Northbound No-Build Condition—Conditions that would exist if the project were not built Pin & hanger connection—Type of support system for steel bridge beams Pier—Intermediate supports for bridges and viaducts constructed of steel, reinforced concrete, or stone masonry. Route 79 North Project—Proposal by the City of Fall River to make Route 79 north of the Rte. 79/I-195 interchange an at-grade boulevard. SB—Southbound Span—The distance between the supports of a bridge Spalling—Flaking, crumbling and falling away of concrete Substructure—Supports the superstructure and transmits loads from the superstructure to the ground. Generally consists of pier caps, columns and piles Superstructure—Supports the deck and generally consists of beams or girders v/c—volume-to-capacity ratio vpd –vehicles per day Viaduct—A bridge over land or water usually with multiple short or medium length spans WB—Westbound 1/15/10