Public Meeting October 7, 2014 Heritage State Park Fall River, MA When We Arrived Address Safety of Structural Deficiencies Address Safety of Substandard Roadway Geometry Reduce Life-cycle Maintenance Costs Braga Bridge Painting/steel repairs complete Fall 2015 Remaining Braga work complete Summer 2016 Braga Bridge Stage 1 Traffic Set-up What is Behind the Tarps- Before Painting & Steel Repairs Additional Work Platform Installed Steel Repair Location Some of the 35,000 gallons of Paint Shoring for Work on the Pier Route 79/138 Stage 1A began November 2013 Water Street Connector Route 79/138 South of Anawan Route 79 North of Central Walls Walls 23 Individual walls 3 different wall types 135,000 square feet-approximately 3 football fields 10 are started or completed-38% Largest 25,000 square feet Longest 2,000 feet Tallest 30+ feet Wall Location Plan Wall D1-138 NB Wall D1 w/Precast Coping Water Street Connector Bridge Wall Wall D1 w/Sleeve for Traffic Signal WDEA Wall Start of Wall D6-Corner of Davol & Central-09/26/2014 Wall D6-Corner of Davol & Central-10/02/2014 Wall D6-Corner of Davol & Central-10/06/2014 Wall D6-Corner of Davol & Central-10/07/2014 Water Street Connector st Bridge-1 Piece of Steel Span 1-All Steel Erected-Future Platform Access-SCR WSC Span 2 Over the RR WSC Concrete Deck Being Placed Quequechan By-Pass Culvert Replacement Micropiles at Davol Street Bridge Davol Street Bridge Foundations Davol Street Bridge Columns Davol Street Bridge Columns Davol Street Bridge Looking North Stage 1B Look-Ahead Open Water Street Connector North of Central N/S Davol Traffic Switch Davol Street Bridge-Steel & Deck Close Anawan Street Bridge-Demolition and New Bridge Utilities at the Anawan/Pocasset Intersection Ramp to the WOW Mill Ramp “G” Bridge- I-195 WB to Route 79 NB Demolition of NB onramp from 138 to I-195 (Broadway) Ramp to I-195 East and West Eagle Street Ramp to I-195 E/W-to be Demolished Water Street Connector Anawan South of Davol Pocasset North of Davol North/South Davol Detour North of Central Stage 1B Detour Routes I-195 WB to 79 NB I-195 EB to 79 NB I-195 WB to 138 SB 79 SB to I-195 EB 79 SB to I-195 WB 138 NB to 79 NB 79 SB to 138 SB 79 SB to Pocasset Final Condition Bike/Pedestrian improvements Additional shared-use path Additional 6-foot bike lane Additional shared lane markings Adaptive signal control system Bridge enhancements Life-cycle improvements Waterfront District Area Entrance Fall River Sign-Now Entrance to Fall River Sign-Future Proposed WDEA-Plaza Central at Davol- “Existing” Central at Davol “Future” Public Outreach How to stay informed Website - clearinghouse www.massgov/massdot/route79project Sign up for e-blast updates and advisories E-blasts and social media Meetings and briefings Print materials Press outreach Single point of contact Hotline – 781-774-0441 Email – route79project@state.ma.us Translations/interpreters Questions/Comments?